      "date": "2026-09-18",
      "kind": "record-added",
      "from": "Not published",
      "to": "Added after independent re-reading of the state index and site-specific order, with backup generation kept separate from IT capacity.",
      "reason": "Added after independent re-reading of the state index and site-specific order, with backup generation kept separate from IT capacity.",
      "evidence_url": "https://ecology.wa.gov/air-climate/air-quality/data-centers",
      "by": "Software-assisted second check",
      "claim_id": "vantage-quincy-campus-wa",
      "record_id": "vantage-quincy-campus-wa",
      "topic": "publication",
      "href": "/projects/vantage-quincy-campus-wa/",
      "id": "change-042c19171b20c28ca18c",
      "change_type": "record-added"
    },
    {
      "date": "2026-09-18",
      "kind": "record-added",
      "from": "Not published",
      "to": "Added from the opened Georgia DRI filing and Newton County objection. Covington is not assigned as the host city.",
      "reason": "Added from the opened Georgia DRI filing and Newton County objection. Covington is not assigned as the host city.",
      "evidence_url": "https://apps.dca.ga.gov/DRI/Submissions.aspx",
      "by": "Software-assisted second check",
      "claim_id": "gregory-road-data-center-newton-county-ga",
      "record_id": "gregory-road-data-center-newton-county-ga",
      "topic": "publication",
      "href": "/projects/gregory-road-data-center-newton-county-ga/",
      "id": "change-2405589606f90ff2dd52",
      "change_type": "record-added"
    },
    {
      "date": "2026-09-18",
      "kind": "record-added",
      "from": "Not published",
      "to": "Added from the opened Georgia DRI filing after operator-null review; Prologis is not named in the cited records.",
      "reason": "Added from the opened Georgia DRI filing after operator-null review; Prologis is not named in the cited records.",
      "evidence_url": "https://apps.dca.ga.gov/DRI/Submissions.aspx",
      "by": "Software-assisted second check",
      "claim_id": "project-sail-coweta-county-ga",
      "record_id": "project-sail-coweta-county-ga",
      "topic": "publication",
      "href": "/projects/project-sail-coweta-county-ga/",
      "id": "change-346e860379a248862c04",
      "change_type": "record-added"
    },
    {
      "date": "2026-09-18",
      "kind": "record-added",
      "from": "Not published",
      "to": "Added after independent re-reading of the state index and site-specific order, with equipment ratings excluded from IT-capacity fields.",
      "reason": "Added after independent re-reading of the state index and site-specific order, with equipment ratings excluded from IT-capacity fields.",
      "evidence_url": "https://ecology.wa.gov/air-climate/air-quality/data-centers",
      "by": "Software-assisted second check",
      "claim_id": "h5-quincy-data-center-wa",
      "record_id": "h5-quincy-data-center-wa",
      "topic": "publication",
      "href": "/facilities/h5-quincy-data-center-wa/",
      "id": "change-3900c49e37f84f8adb1a",
      "change_type": "record-added"
    },
    {
      "date": "2026-09-18",
      "kind": "record-added",
      "from": "Not published",
      "to": "Added from the opened CEQAnet and CEC records. Backup-generation capacity is recorded as proposed onsite generation, not IT load.",
      "reason": "Added from the opened CEQAnet and CEC records. Backup-generation capacity is recorded as proposed onsite generation, not IT load.",
      "evidence_url": "https://ceqanet.lci.ca.gov/2026070839",
      "by": "Software-assisted second check",
      "claim_id": "northtown-data-center-san-jose-ca",
      "record_id": "northtown-data-center-san-jose-ca",
      "topic": "publication",
      "href": "/projects/northtown-data-center-san-jose-ca/",
      "id": "change-393686ee526e5fe9c6ad",
      "change_type": "record-added"
    },
    {
      "date": "2026-09-18",
      "kind": "record-added",
      "from": "Not published",
      "to": "Added from the opened Georgia DRI filing after operator-null review. The cited DRI does not name an end user or tenant and does not support the OpenAI attribution.",
      "reason": "Added from the opened Georgia DRI filing after operator-null review. The cited DRI does not name an end user or tenant and does not support the OpenAI attribution.",
      "evidence_url": "https://apps.dca.ga.gov/DRI/Submissions.aspx",
      "by": "Software-assisted second check",
      "claim_id": "project-camellia-effingham-county-ga",
      "record_id": "project-camellia-effingham-county-ga",
      "topic": "publication",
      "href": "/projects/project-camellia-effingham-county-ga/",
      "id": "change-4e94dc3f38b8a6f87852",
      "change_type": "record-added"
    },
    {
      "date": "2026-09-18",
      "kind": "record-added",
      "from": "Not published",
      "to": "Added from the opened city ordinances and Georgia DRI filing. Adopted rezoning is recorded as zoning approval only.",
      "reason": "Added from the opened city ordinances and Georgia DRI filing. Adopted rezoning is recorded as zoning approval only.",
      "evidence_url": "https://apps.dca.ga.gov/DRI/Submissions.aspx",
      "by": "Software-assisted second check",
      "claim_id": "atl2-east-fayetteville-fayette-ga",
      "record_id": "atl2-east-fayetteville-fayette-ga",
      "topic": "publication",
      "href": "/projects/atl2-east-fayetteville-fayette-ga/",
      "id": "change-503246e91b736c79d016",
      "change_type": "record-added"
    },
    {
      "date": "2026-09-18",
      "kind": "record-added",
      "from": "Not published",
      "to": "Added from the opened Illinois EPA notice. The DCEO Northlake Microsoft incentive award is not treated as the same facility.",
      "reason": "Added from the opened Illinois EPA notice. The DCEO Northlake Microsoft incentive award is not treated as the same facility.",
      "evidence_url": "https://epa.illinois.gov/content/soi/epa/en/topics/environmental-justice/ej-notification-letters/jcr:content/responsivegrid/container/container/data_table_copy.datatablejson.json",
      "by": "Software-assisted second check",
      "claim_id": "microsoft-chicago-data-center-northlake-il",
      "record_id": "microsoft-chicago-data-center-northlake-il",
      "topic": "publication",
      "href": "/facilities/microsoft-chicago-data-center-northlake-il/",
      "id": "change-53868e1b38bf143d371b",
      "change_type": "record-added"
    },
    {
      "date": "2026-09-18",
      "kind": "record-added",
      "from": "Not published",
      "to": "Added from the opened CEQAnet notice after operator-null review; generator authority is not converted to IT capacity or current operation.",
      "reason": "Added from the opened CEQAnet notice after operator-null review; generator authority is not converted to IT capacity or current operation.",
      "evidence_url": "https://ceqanet.lci.ca.gov/2018062057/6",
      "by": "Software-assisted second check",
      "claim_id": "mclaren-data-center-santa-clara-ca",
      "record_id": "mclaren-data-center-santa-clara-ca",
      "topic": "publication",
      "href": "/projects/mclaren-data-center-santa-clara-ca/",
      "id": "change-792479aab0085ba4db3b",
      "change_type": "record-added"
    },
    {
      "date": "2026-09-18",
      "kind": "record-added",
      "from": "Not published",
      "to": "Added from the opened Illinois EPA notice after operator-null review; the applicant is not treated as a verified operator and the West Chicago address is not merged.",
      "reason": "Added from the opened Illinois EPA notice after operator-null review; the applicant is not treated as a verified operator and the West Chicago address is not merged.",
      "evidence_url": "https://epa.illinois.gov/content/soi/epa/en/topics/environmental-justice/ej-notification-letters/jcr:content/responsivegrid/container/container/data_table_copy.datatablejson.json",
      "by": "Software-assisted second check",
      "claim_id": "colovore-meridian-parkway-aurora-il",
      "record_id": "colovore-meridian-parkway-aurora-il",
      "topic": "publication",
      "href": "/projects/colovore-meridian-parkway-aurora-il/",
      "id": "change-80b1189d83e789075e61",
      "change_type": "record-added"
    },
    {
      "date": "2026-09-18",
      "kind": "record-added",
      "from": "Not published",
      "to": "Added from the opened CEQAnet and CEC records. Backup-generation capacity is recorded as proposed onsite generation, not IT load.",
      "reason": "Added from the opened CEQAnet and CEC records. Backup-generation capacity is recorded as proposed onsite generation, not IT load.",
      "evidence_url": "https://ceqanet.lci.ca.gov/2026080118",
      "by": "Software-assisted second check",
      "claim_id": "goodman-energy-park-data-center-vernon-ca",
      "record_id": "goodman-energy-park-data-center-vernon-ca",
      "topic": "publication",
      "href": "/projects/goodman-energy-park-data-center-vernon-ca/",
      "id": "change-853bdbc2ce3a535f04d2",
      "change_type": "record-added"
    },
    {
      "date": "2026-09-18",
      "kind": "record-added",
      "from": "Not published",
      "to": "Added from the opened Georgia DRI filing. A neighbouring Stonewall Tell filing sits on the opposite side of the road and is not merged.",
      "reason": "Added from the opened Georgia DRI filing. A neighbouring Stonewall Tell filing sits on the opposite side of the road and is not merged.",
      "evidence_url": "https://apps.dca.ga.gov/DRI/Submissions.aspx",
      "by": "Software-assisted second check",
      "claim_id": "atl50-union-city-fulton-ga",
      "record_id": "atl50-union-city-fulton-ga",
      "topic": "publication",
      "href": "/projects/atl50-union-city-fulton-ga/",
      "id": "change-8e855f1f61d6bbb53d85",
      "change_type": "record-added"
    },
    {
      "date": "2026-09-18",
      "kind": "record-added",
      "from": "Not published",
      "to": "Added after independent re-reading of the state index and site-specific order.",
      "reason": "Added after independent re-reading of the state index and site-specific order.",
      "evidence_url": "https://ecology.wa.gov/air-climate/air-quality/data-centers",
      "by": "Software-assisted second check",
      "claim_id": "cyrusone-quincy-data-center-wa",
      "record_id": "cyrusone-quincy-data-center-wa",
      "topic": "publication",
      "href": "/facilities/cyrusone-quincy-data-center-wa/",
      "id": "change-a7acd0c579498cc8e54f",
      "change_type": "record-added"
    },
    {
      "date": "2026-09-18",
      "kind": "record-added",
      "from": "Not published",
      "to": "Added from the opened Georgia DRI filing after operator-null review; QTS branding is not treated as a verified operator role.",
      "reason": "Added from the opened Georgia DRI filing after operator-null review; QTS branding is not treated as a verified operator role.",
      "evidence_url": "https://apps.dca.ga.gov/DRI/Submissions.aspx",
      "by": "Software-assisted second check",
      "claim_id": "qts-blakely-early-county-ga",
      "record_id": "qts-blakely-early-county-ga",
      "topic": "publication",
      "href": "/projects/qts-blakely-early-county-ga/",
      "id": "change-c727eb3ba347c2267283",
      "change_type": "record-added"
    },
    {
      "date": "2026-09-18",
      "kind": "record-added",
      "from": "Not published",
      "to": "Added from the opened Georgia DRI filing after operator-null review; Thor Equities is not stated as a parent in the cited records.",
      "reason": "Added from the opened Georgia DRI filing after operator-null review; Thor Equities is not stated as a parent in the cited records.",
      "evidence_url": "https://apps.dca.ga.gov/DRI/Submissions.aspx",
      "by": "Software-assisted second check",
      "claim_id": "kingston-technology-hub-bartow-ga",
      "record_id": "kingston-technology-hub-bartow-ga",
      "topic": "publication",
      "href": "/projects/kingston-technology-hub-bartow-ga/",
      "id": "change-cb1114764ecca7a95b2c",
      "change_type": "record-added"
    },
    {
      "date": "2026-09-17",
      "kind": "locator-changed",
      "from": "The source link used an OPSB case-summary URL that now returns 404.",
      "to": "The working source link now opens Fairfield Energy's live project page, which identifies OPSB case 26-0160-EL-BGN.",
      "reason": "The historical OPSB summary is described as preserved evidence rather than presented as a working page; the official case-summary URL returns 404 and the Docketing Information System rejected a direct case request during this check.",
      "evidence_url": "https://fairfieldenergycenter.com/home/utility-facility",
      "by": "Editorial classification update",
      "claim_id": "claim:vantage-oh2-millersport:opsb-status",
      "record_id": "vantage-oh2-millersport",
      "topic": "OPSB / generation status",
      "href": "/claims/vantage-oh2-millersport-opsb-status/",
      "id": "change-229702ffaf591710062a",
      "change_type": "locator-changed"
    },
    {
      "date": "2026-09-17",
      "kind": "locator-changed",
      "from": "The source link used an OPSB case-summary URL that now returns 404.",
      "to": "The working source link now opens Fairfield Energy's live project page, which identifies OPSB case 26-0160-EL-BGN.",
      "reason": "The historical OPSB summary is described as preserved evidence rather than presented as a working page; the official case-summary URL returns 404 and the Docketing Information System rejected a direct case request during this check.",
      "evidence_url": "https://fairfieldenergycenter.com/home/utility-facility",
      "by": "Editorial classification update",
      "claim_id": "millersport-rate-impact",
      "record_id": "vantage-oh2-millersport",
      "topic": "Power / developer claim",
      "href": "/claims/millersport-rate-impact/",
      "id": "change-a3fd655eb84c9aed69ac",
      "change_type": "locator-changed"
    },
    {
      "date": "2026-09-16",
      "kind": "wording-changed",
      "from": "Google The Dalles: Mixed evidence",
      "to": "Google says The Dalles aquifer project added more than 100 million gallons a year of stored-water capacity for the community.",
      "reason": "A source re-read replaced a generated status label with the exact company claim and separated community storage capacity from data-center water use.",
      "by": "Editorial classification update",
      "claim_id": "claim:google-the-dalles:cooling-water",
      "record_id": "google-the-dalles",
      "topic": "Cooling + water",
      "href": "/claims/google-the-dalles-cooling-water/",
      "id": "change-0c54e7ce294028b6c1f7",
      "change_type": "wording-changed"
    },
    {
      "date": "2026-09-16",
      "kind": "wording-changed",
      "from": "Meta Jeffersonville: Not verifiable",
      "to": "Meta's Jeffersonville announcement establishes the campus's cooling design and water use.",
      "reason": "A source re-read converted a generated status label into the exact inference being tested and restored a concise unit boundary.",
      "by": "Editorial classification update",
      "claim_id": "claim:meta-jeffersonville:cooling-water",
      "record_id": "meta-jeffersonville",
      "topic": "Cooling + water",
      "href": "/claims/meta-jeffersonville-cooling-water/",
      "id": "change-1af97d4bf2a9d87afb90",
      "change_type": "wording-changed"
    },
    {
      "date": "2026-09-16",
      "kind": "wording-changed",
      "from": "Microsoft Mount Pleasant: Announced",
      "to": "Microsoft says its Mount Pleasant pilot will use closed-loop chip-level cooling without evaporating water for cooling.",
      "reason": "A source re-read replaced a generated status label with the exact company claim and restored a concise unit boundary.",
      "by": "Editorial classification update",
      "claim_id": "claim:microsoft-mount-pleasant:cooling-water",
      "record_id": "microsoft-mount-pleasant",
      "topic": "Cooling + water",
      "href": "/claims/microsoft-mount-pleasant-cooling-water/",
      "id": "change-1f035815ec0761d312a1",
      "change_type": "wording-changed"
    },
    {
      "date": "2026-09-16",
      "kind": "wording-changed",
      "from": "Google Fort Wayne: Not verifiable",
      "to": "The reviewed utility order establishes Google Fort Wayne's cooling design and water use.",
      "reason": "A source re-read converted a generated status label into the exact inference being tested and restored a concise unit boundary.",
      "by": "Editorial classification update",
      "claim_id": "claim:google-fort-wayne:cooling-water",
      "record_id": "google-fort-wayne",
      "topic": "Cooling + water",
      "href": "/claims/google-fort-wayne-cooling-water/",
      "id": "change-8c550e26eb1e453ef07b",
      "change_type": "wording-changed"
    },
    {
      "date": "2026-09-16",
      "kind": "verdict-changed",
      "from": "Company claim",
      "to": "Unknown",
      "reason": "The page tests a common inference about what the announcement establishes; Meta did not make the cooling-and-water statement shown.",
      "by": "Editorial classification update",
      "claim_id": "claim:meta-jeffersonville:cooling-water",
      "record_id": "meta-jeffersonville",
      "topic": "Cooling + water",
      "href": "/claims/meta-jeffersonville-cooling-water/",
      "id": "change-fd865b8928ddea06491e",
      "change_type": "verdict-changed"
    },
    {
      "date": "2026-09-14",
      "kind": "record-added",
      "from": "Not published",
      "to": "Added as one permit-defined existing facility; current IT use, roles, scale and capacity remain unknown.",
      "reason": "Added as one permit-defined existing facility; current IT use, roles, scale and capacity remain unknown.",
      "evidence_url": "https://dnrec.delaware.gov/public-notices/title-v-synthetic-minor-permit-applications-jp-morgan/",
      "by": "Software-assisted second check",
      "claim_id": "jp-morgan-chase-cdc-1-bear-de",
      "record_id": "jp-morgan-chase-cdc-1-bear-de",
      "topic": "publication",
      "href": "/facilities/jp-morgan-chase-cdc-1-bear-de/",
      "id": "change-1c6fa55b7c5c757b1799",
      "change_type": "record-added"
    },
    {
      "date": "2026-09-14",
      "kind": "verdict-changed",
      "from": "Not independently verified",
      "to": "Partially supported",
      "reason": "The tariff supports part of the risk-allocation claim, but it does not prove that generation, transmission or wholesale-market costs can never affect household bills.",
      "by": "Editorial classification update",
      "claim_id": "aep-ratepayer-protection",
      "record_id": null,
      "topic": "Power / rates",
      "href": "/claims/aep-ratepayer-protection/",
      "id": "change-1dc68ccdb5d33601288e",
      "change_type": "verdict-changed"
    },
    {
      "date": "2026-09-14",
      "kind": "verdict-changed",
      "from": "Not independently verified",
      "to": "Supported",
      "reason": "The government announcement supports the stated term. It does not establish an executed agreement, a due date or any payment received.",
      "by": "Editorial classification update",
      "claim_id": "claim:meta-lebanon:city-impact-payment",
      "record_id": "meta-lebanon",
      "topic": "city impact payment",
      "href": "/claims/meta-lebanon-city-impact-payment/",
      "id": "change-24836c6252b44b08adaf",
      "change_type": "verdict-changed"
    },
    {
      "date": "2026-09-14",
      "kind": "record-added",
      "from": "Not published",
      "to": "Qualified as one operating campus with at least one operating data-center building; complete campus scale, roles, and capacity remain unknown.",
      "reason": "Qualified as one operating campus with at least one operating data-center building; complete campus scale, roles, and capacity remain unknown.",
      "evidence_url": "https://www.sarpy.gov/m/newsflash/home/detail/113",
      "by": "Software-assisted second check",
      "claim_id": "google-papillion-data-center-ne",
      "record_id": "google-papillion-data-center-ne",
      "topic": "publication",
      "href": "/projects/google-papillion-data-center-ne/",
      "id": "change-26cb71c9d273d4320720",
      "change_type": "record-added"
    },
    {
      "date": "2026-09-14",
      "kind": "verdict-changed",
      "from": "Not independently verified",
      "to": "Company claim",
      "reason": "The figure is a company projection; neither cited announcement is an observed payroll or employment record.",
      "by": "Editorial classification update",
      "claim_id": "claim:meta-lebanon:permanent-jobs",
      "record_id": "meta-lebanon",
      "topic": "permanent jobs",
      "href": "/claims/meta-lebanon-permanent-jobs/",
      "id": "change-3ad57a25a1fd659d46c1",
      "change_type": "verdict-changed"
    },
    {
      "date": "2026-09-14",
      "kind": "verdict-changed",
      "from": "Not independently verified",
      "to": "Partially supported",
      "reason": "The cited commitment supports cost allocation for one site, but it cannot establish the statewide generalization shown.",
      "by": "Editorial classification update",
      "claim_id": "sabey-cost-allocation-generalized",
      "record_id": "sabey-indianapolis",
      "topic": "Power / cost allocation",
      "href": "/claims/sabey-cost-allocation-generalized/",
      "id": "change-3c0c72a53f92a81d6ba3",
      "change_type": "verdict-changed"
    },
    {
      "date": "2026-09-14",
      "kind": "verdict-changed",
      "from": "Not independently verified",
      "to": "Supported",
      "reason": "The government announcement, portal fields and agreement support the carefully limited description of authorized terms. They do not prove delivery, jobs or completed investment.",
      "by": "Editorial classification update",
      "claim_id": "claim:aws-new-carlisle:state-incentives",
      "record_id": "aws-new-carlisle",
      "topic": "state incentives",
      "href": "/claims/aws-new-carlisle-state-incentives/",
      "id": "change-433cefb2db86ed37a365",
      "change_type": "verdict-changed"
    },
    {
      "date": "2026-09-14",
      "kind": "record-added",
      "from": "Not published",
      "to": "Qualified as one proposed building from dated lease and tenant records; current tenancy, occupancy and operation remain unknown.",
      "reason": "Qualified as one proposed building from dated lease and tenant records; current tenancy, occupancy and operation remain unknown.",
      "evidence_url": "https://legislature.maine.gov/doc/10592",
      "by": "Software-assisted second check",
      "claim_id": "eternal-mind-loring-data-center-me",
      "record_id": "eternal-mind-loring-data-center-me",
      "topic": "publication",
      "href": "/facilities/eternal-mind-loring-data-center-me/",
      "id": "change-44f70a66ece81bd6b88e",
      "change_type": "record-added"
    },
    {
      "date": "2026-09-14",
      "kind": "verdict-changed",
      "from": "Not independently verified",
      "to": "Unknown",
      "reason": "This card tests a common inference, not an attributed outside statement. The operating milestone still does not establish completion of every planned building or the full campus.",
      "by": "Editorial classification update",
      "claim_id": "aws-campus-complete",
      "record_id": "aws-new-carlisle",
      "topic": "Project status",
      "href": "/claims/aws-campus-complete/",
      "id": "change-60fc92c8918d9b41e532",
      "change_type": "verdict-changed"
    },
    {
      "date": "2026-09-14",
      "kind": "verdict-changed",
      "from": "Not independently verified",
      "to": "Company claim",
      "reason": "The exact investment figure is a Meta projection. The government announcement repeats it but does not establish completed or placed-in-service capital.",
      "by": "Editorial classification update",
      "claim_id": "claim:meta-lebanon:investment",
      "record_id": "meta-lebanon",
      "topic": "investment",
      "href": "/claims/meta-lebanon-investment/",
      "id": "change-6e38530742f89883a9f5",
      "change_type": "verdict-changed"
    },
    {
      "date": "2026-09-14",
      "kind": "verdict-changed",
      "from": "Not independently verified",
      "to": "Supported",
      "reason": "The government announcement supports the stated term. It does not establish the controlling agreement or exemptions actually claimed.",
      "by": "Editorial classification update",
      "claim_id": "claim:meta-lebanon:state-sales-tax-exemption",
      "record_id": "meta-lebanon",
      "topic": "state sales-tax exemption",
      "href": "/claims/meta-lebanon-state-sales-tax-exemption/",
      "id": "change-7315a8a80d0a0895b1eb",
      "change_type": "verdict-changed"
    },
    {
      "date": "2026-09-14",
      "kind": "record-added",
      "from": "Not published",
      "to": "Qualified as one proposed land-sale and due-diligence project; no later lifecycle milestone is inferred.",
      "reason": "Qualified as one proposed land-sale and due-diligence project; no later lifecycle milestone is inferred.",
      "evidence_url": "https://www.co.silverbow.mt.us/AgendaCenter/ViewFile/Agenda/_04162025-4618",
      "by": "Software-assisted second check",
      "claim_id": "sabey-montana-connections-data-center-project-mt",
      "record_id": "sabey-montana-connections-data-center-project-mt",
      "topic": "publication",
      "href": "/projects/sabey-montana-connections-data-center-project-mt/",
      "id": "change-8cfa46e2d30428a11af3",
      "change_type": "record-added"
    },
    {
      "date": "2026-09-14",
      "kind": "record-added",
      "from": "Not published",
      "to": "Qualified as one construction-stage campus; roles, capacity, exact parcel, completion, and operation remain unknown.",
      "reason": "Qualified as one construction-stage campus; roles, capacity, exact parcel, completion, and operation remain unknown.",
      "evidence_url": "https://rosemountmn.gov/m/faq?cat=20",
      "by": "Software-assisted second check",
      "claim_id": "meta-rosemount-data-center-mn",
      "record_id": "meta-rosemount-data-center-mn",
      "topic": "publication",
      "href": "/projects/meta-rosemount-data-center-mn/",
      "id": "change-8d611b1a2736f91abc4f",
      "change_type": "record-added"
    },
    {
      "date": "2026-09-14",
      "kind": "record-added",
      "from": "Not published",
      "to": "Qualified as one proposed campus; final lease action, construction, operation, roles and IT capacity remain unknown.",
      "reason": "Qualified as one proposed campus; final lease action, construction, operation, roles and IT capacity remain unknown.",
      "evidence_url": "https://notice.alaska.gov/223817",
      "by": "Software-assisted second check",
      "claim_id": "stak-energy-campus-north-slope-ak",
      "record_id": "stak-energy-campus-north-slope-ak",
      "topic": "publication",
      "href": "/projects/stak-energy-campus-north-slope-ak/",
      "id": "change-8df5edfd973f8d4c23b2",
      "change_type": "record-added"
    },
    {
      "date": "2026-09-14",
      "kind": "record-added",
      "from": "Not published",
      "to": "Added as one assessed building with dated operating evidence; current utilization and capacity remain unknown.",
      "reason": "Added as one assessed building with dated operating evidence; current utilization and capacity remain unknown.",
      "evidence_url": "https://arcgisserver.digital.mass.gov/arcgisserver/rest/services/AGOL/L3_Parcels_FeatureService_4326/FeatureServer/1/query?where=MAP_PAR_ID%3D%27020-02-003%27&outFields=MAP_PAR_ID%2CLOC_ID%2CSITE_ADDR%2CCITY%2CZIP%2COWNER1%2CUSE_CODE%2CLOT_SIZE%2CBLD_AREA%2CYEAR_BUILT%2CFY&returnGeometry=false&f=json",
      "by": "Software-assisted second check",
      "claim_id": "mghpcc-holyoke-ma",
      "record_id": "mghpcc-holyoke-ma",
      "topic": "publication",
      "href": "/facilities/mghpcc-holyoke-ma/",
      "id": "change-9c3e14c284303650a265",
      "change_type": "record-added"
    },
    {
      "date": "2026-09-14",
      "kind": "record-added",
      "from": "Not published",
      "to": "Qualified from current ETS use and procurement pages as one operating facility; roles, capacity, and scale remain unknown.",
      "reason": "Qualified from current ETS use and procurement pages as one operating facility; roles, capacity, and scale remain unknown.",
      "evidence_url": "https://ets.hawaii.gov/services-oriented-infrastructure/",
      "by": "Software-assisted second check",
      "claim_id": "drfortress-honolulu-hi",
      "record_id": "drfortress-honolulu-hi",
      "topic": "publication",
      "href": "/facilities/drfortress-honolulu-hi/",
      "id": "change-bac153787496e9e305af",
      "change_type": "record-added"
    },
    {
      "date": "2026-09-14",
      "kind": "record-added",
      "from": "Not published",
      "to": "Qualified as one agreement-backed project with current lifecycle unknown; all later milestones remain unverified.",
      "reason": "Qualified as one agreement-backed project with current lifecycle unknown; all later milestones remain unverified.",
      "evidence_url": "https://groton-ct.gov/news_detail_T8_R208.php",
      "by": "Software-assisted second check",
      "claim_id": "gotspace-groton-data-center-project-ct",
      "record_id": "gotspace-groton-data-center-project-ct",
      "topic": "publication",
      "href": "/projects/gotspace-groton-data-center-project-ct/",
      "id": "change-c3ad34bb7c0db242893b",
      "change_type": "record-added"
    },
    {
      "date": "2026-09-14",
      "kind": "record-added",
      "from": "Not published",
      "to": "Added as one rezoning and preliminary-plan-approved project; construction, end user, roles and capacity remain unknown.",
      "reason": "Added as one rezoning and preliminary-plan-approved project; construction, end user, roles and capacity remain unknown.",
      "evidence_url": "https://amv.siouxfalls.gov/OnBaseAgendaOnline/Documents/DownloadFileBytes/SUB-P-022062-2025%20-%20Gemini%20Addition%20-%20Rice%20_%20Veterans%20%28Data%20Center%29.pdf.pdf?documentType=1&isAttachment=True&isSection=False&itemId=192696&meetingId=4175&publishId=155952",
      "by": "Software-assisted second check",
      "claim_id": "gemini-addition-data-center-sioux-falls-sd",
      "record_id": "gemini-addition-data-center-sioux-falls-sd",
      "topic": "publication",
      "href": "/projects/gemini-addition-data-center-sioux-falls-sd/",
      "id": "change-d096f94341c717e1a22b",
      "change_type": "record-added"
    },
    {
      "date": "2026-09-14",
      "kind": "verdict-changed",
      "from": "Not independently verified",
      "to": "Contradicted",
      "reason": "The claim says the projected jobs already exist, while the cited company source still describes a forecast and the government source describes a different job scope.",
      "by": "Editorial classification update",
      "claim_id": "microsoft-laporte-jobs-now",
      "record_id": "microsoft-la-porte",
      "topic": "Jobs / timing",
      "href": "/claims/microsoft-laporte-jobs-now/",
      "id": "change-eb63465aff65aa3565da",
      "change_type": "verdict-changed"
    },
    {
      "date": "2026-09-14",
      "kind": "verdict-changed",
      "from": "Not independently verified",
      "to": "Company claim",
      "reason": "The peak construction-jobs figure is a company projection, not an observed workforce count or job-years measure.",
      "by": "Editorial classification update",
      "claim_id": "claim:meta-lebanon:construction-jobs",
      "record_id": "meta-lebanon",
      "topic": "construction jobs",
      "href": "/claims/meta-lebanon-construction-jobs/",
      "id": "change-eb8d3fc4f667a5a58d0a",
      "change_type": "verdict-changed"
    },
    {
      "date": "2026-09-14",
      "kind": "record-added",
      "from": "Not published",
      "to": "Qualified at approval only; current construction and applicant corporate-role crosswalk remain unresolved.",
      "reason": "Qualified at approval only; current construction and applicant corporate-role crosswalk remain unresolved.",
      "evidence_url": "https://www.vinelandcity.org/Archive/Planning%20Board/Minutes/2025/Minutes%206-26-25%20%28Special%20Meeting%29.pdf",
      "by": "Software-assisted second check",
      "claim_id": "dataone-vineland-ai-data-center-nj",
      "record_id": "dataone-vineland-ai-data-center-nj",
      "topic": "publication",
      "href": "/projects/dataone-vineland-ai-data-center-nj/",
      "id": "change-f14766f491baae1f416a",
      "change_type": "record-added"
    },
    {
      "date": "2026-09-14",
      "kind": "verdict-changed",
      "from": "Not independently verified",
      "to": "Unknown",
      "reason": "The prior label is defined for an unverified statement by a non-company party. This card tests a common inference instead; the reviewed company source does not establish annual or total campus water use.",
      "by": "Editorial classification update",
      "claim_id": "meta-closed-loop-zero-water",
      "record_id": "meta-lebanon",
      "topic": "Water / cooling",
      "href": "/claims/meta-closed-loop-zero-water/",
      "id": "change-fddc9fd242c755d738cd",
      "change_type": "verdict-changed"
    },
    {
      "date": "2026-09-13",
      "kind": "record-added",
      "from": "Not published",
      "to": "Added as a bounded under-review project after independent review of Spotsylvania County case records.",
      "reason": "Added as a bounded under-review project after independent review of Spotsylvania County case records.",
      "evidence_url": "https://www.spotsylvania.va.us/DocumentCenter/View/40486/BOS-Memo-Planning-Dept-Monthly-and-Project-Summary-Reports-March-2026",
      "by": "Software-assisted second check",
      "claim_id": "thornburg-industrial-park-2",
      "record_id": "thornburg-industrial-park-2",
      "topic": "publication",
      "href": "/projects/thornburg-industrial-park-2/",
      "id": "change-0623e1d009a162fbc63e",
      "change_type": "record-added"
    },
    {
      "date": "2026-09-13",
      "kind": "record-added",
      "from": "Not published",
      "to": "Added as a bounded construction-stage project after independent review of the City of Gilroy source.",
      "reason": "Added as a bounded construction-stage project after independent review of the City of Gilroy source.",
      "evidence_url": "https://www.cityofgilroy.org/1019/Gilroy-Data-Center-by-AWS",
      "by": "Software-assisted second check",
      "claim_id": "gilroy-data-center",
      "record_id": "gilroy-data-center",
      "topic": "publication",
      "href": "/projects/gilroy-data-center/",
      "id": "change-11275b85bffdb5e03d3f",
      "change_type": "record-added"
    },
    {
      "date": "2026-09-13",
      "kind": "record-added",
      "from": "Not published",
      "to": "Added as a zoning-approved project after a fresh review of the Town of Tyrone source; unverified Project Rita, building and capacity details were excluded.",
      "reason": "Added as a zoning-approved project after a fresh review of the Town of Tyrone source; unverified Project Rita, building and capacity details were excluded.",
      "evidence_url": "https://www.tyronega.gov/datacenter",
      "by": "Software-assisted second check",
      "claim_id": "microsoft-tyrone-data-center",
      "record_id": "microsoft-tyrone-data-center",
      "topic": "publication",
      "href": "/projects/microsoft-tyrone-data-center/",
      "id": "change-1c9e057b8aa67c3e4a2b",
      "change_type": "record-added"
    },
    {
      "date": "2026-09-13",
      "kind": "record-added",
      "from": "Not published",
      "to": "Added as one campus record; operating status remains visibly operator-attributed and regional renewable-generation figures were excluded from campus capacity.",
      "reason": "Added as one campus record; operating status remains visibly operator-attributed and regional renewable-generation figures were excluded from campus capacity.",
      "evidence_url": "https://tnecd.com/news/governor-lee-commissioner-rolfe-announce-facebook-to-build-800-million-data-center-in-gallatin/",
      "by": "Software-assisted second check",
      "claim_id": "meta-gallatin-tn",
      "record_id": "meta-gallatin-tn",
      "topic": "publication",
      "href": "/projects/meta-gallatin-tn/",
      "id": "change-1df404aec87e83109dd6",
      "change_type": "record-added"
    },
    {
      "date": "2026-09-13",
      "kind": "record-added",
      "from": "Not published",
      "to": "Added as a permit-defined proposed project after independent review of current TCEQ records.",
      "reason": "Added as a permit-defined proposed project after independent review of current TCEQ records.",
      "evidence_url": "https://www.tceq.texas.gov/downloads/permitting/air/bilingual/pending-permit-notices/183046-pls-english.pdf",
      "by": "Software-assisted second check",
      "claim_id": "nexus-data-center-hubbard",
      "record_id": "nexus-data-center-hubbard",
      "topic": "publication",
      "href": "/projects/nexus-data-center-hubbard/",
      "id": "change-2a9b0ed3fec41a3c8efd",
      "change_type": "record-added"
    },
    {
      "date": "2026-09-13",
      "kind": "record-added",
      "from": "Not published",
      "to": "Added as one dated construction-stage project; party identities, current progress, capacity and physical scale remain unknown.",
      "reason": "Added as one dated construction-stage project; party identities, current progress, capacity and physical scale remain unknown.",
      "evidence_url": "https://webstercountymo.gov/commission-data-center-update-may-21/",
      "by": "Software-assisted second check",
      "claim_id": "rifle-range-road-data-center-mo",
      "record_id": "rifle-range-road-data-center-mo",
      "topic": "publication",
      "href": "/projects/rifle-range-road-data-center-mo/",
      "id": "change-3342d2e73c7612176acb",
      "change_type": "record-added"
    },
    {
      "date": "2026-09-13",
      "kind": "record-added",
      "from": "Not published",
      "to": "Added as one construction-stage campus after a fresh review of county and state records; planned/developing buildings were not counted as operating facilities.",
      "reason": "Added as one construction-stage campus after a fresh review of county and state records; planned/developing buildings were not counted as operating facilities.",
      "evidence_url": "https://www.yorkcountysc.gov/1313/Data-Centers",
      "by": "Software-assisted second check",
      "claim_id": "qts-york-county-campus",
      "record_id": "qts-york-county-campus",
      "topic": "publication",
      "href": "/projects/qts-york-county-campus/",
      "id": "change-340ee51aab4790f472a0",
      "change_type": "record-added"
    },
    {
      "date": "2026-09-13",
      "kind": "record-added",
      "from": "Not published",
      "to": "Added as a bounded operating-facility record after independent review of current TCEQ records.",
      "reason": "Added as a bounded operating-facility record after independent review of current TCEQ records.",
      "evidence_url": "https://www.tceq.texas.gov/downloads/permitting/air/bilingual/pending-permit-notices/131651-pls-english.pdf",
      "by": "Software-assisted second check",
      "claim_id": "adc-plano",
      "record_id": "adc-plano",
      "topic": "publication",
      "href": "/facilities/adc-plano/",
      "id": "change-3efd01970081a83ec230",
      "change_type": "record-added"
    },
    {
      "date": "2026-09-13",
      "kind": "record-added",
      "from": "Not published",
      "to": "Added as one construction-stage campus; the lease-backed 200 MW was scoped to the initial two-building phase and developer, operator, owner and tenant identities remain unresolved.",
      "reason": "Added as one construction-stage campus; the lease-backed 200 MW was scoped to the initial two-building phase and developer, operator, owner and tenant identities remain unresolved.",
      "evidence_url": "https://www.sec.gov/Archives/edgar/data/1144879/000114487926000030/apld-20260228.htm",
      "by": "Software-assisted second check",
      "claim_id": "applied-digital-polaris-forge-2-harwood-nd",
      "record_id": "applied-digital-polaris-forge-2-harwood-nd",
      "topic": "publication",
      "href": "/projects/applied-digital-polaris-forge-2-harwood-nd/",
      "id": "change-45dd01847b4ce90a5121",
      "change_type": "record-added"
    },
    {
      "date": "2026-09-13",
      "kind": "record-added",
      "from": "Not published",
      "to": "Added as a bounded under-review project after independent review of Spotsylvania County case records.",
      "reason": "Added as a bounded under-review project after independent review of Spotsylvania County case records.",
      "evidence_url": "https://www.spotsylvania.va.us/DocumentCenter/View/40486/BOS-Memo-Planning-Dept-Monthly-and-Project-Summary-Reports-March-2026",
      "by": "Software-assisted second check",
      "claim_id": "pairmont-data-center-campus",
      "record_id": "pairmont-data-center-campus",
      "topic": "publication",
      "href": "/projects/pairmont-data-center-campus/",
      "id": "change-4af301987bf0978b5e99",
      "change_type": "record-added"
    },
    {
      "date": "2026-09-13",
      "kind": "record-added",
      "from": "Not published",
      "to": "Added as one permit-approved campus after a fresh review of the issued permit and MDE pages; generator ratings and broader-site relationships were not promoted.",
      "reason": "Added as one permit-approved campus after a fresh review of the issued permit and MDE pages; generator ratings and broader-site relationships were not promoted.",
      "evidence_url": "https://mde.maryland.gov/programs/permits/AirManagementPermits/Documents/Public-Review/Alt%20NSPS/Amazon%20PTC%202025.pdf",
      "by": "Software-assisted second check",
      "claim_id": "amazon-bwi150-frederick-campus",
      "record_id": "amazon-bwi150-frederick-campus",
      "topic": "publication",
      "href": "/projects/amazon-bwi150-frederick-campus/",
      "id": "change-5fa2a4be227b15df3b05",
      "change_type": "record-added"
    },
    {
      "date": "2026-09-13",
      "kind": "record-added",
      "from": "Not published",
      "to": "Added as one permit-defined existing facility; party roles, physical scale and data-center capacity remain unknown.",
      "reason": "Added as one permit-defined existing facility; party roles, physical scale and data-center capacity remain unknown.",
      "evidence_url": "https://www.iowadnr.gov/media/6245/download?inline",
      "by": "Software-assisted second check",
      "claim_id": "osmium-data-center-west-des-moines",
      "record_id": "osmium-data-center-west-des-moines",
      "topic": "publication",
      "href": "/facilities/osmium-data-center-west-des-moines/",
      "id": "change-70548bb08454f43a1b84",
      "change_type": "record-added"
    },
    {
      "date": "2026-09-13",
      "kind": "record-added",
      "from": "Not published",
      "to": "Added as one zoning-approved project; company identity, construction, acreage and capacity claims remain excluded.",
      "reason": "Added as one zoning-approved project; company identity, construction, acreage and capacity claims remain excluded.",
      "evidence_url": "https://bessemeral.org/departments/city-clerk",
      "by": "Software-assisted second check",
      "claim_id": "al-bessemer-land-data-center",
      "record_id": "al-bessemer-land-data-center",
      "topic": "publication",
      "href": "/projects/al-bessemer-land-data-center/",
      "id": "change-73f2e9d136e1ee57c6be",
      "change_type": "record-added"
    },
    {
      "date": "2026-09-13",
      "kind": "record-added",
      "from": "Not published",
      "to": "Added as one proposed project from the live application and pending register; generator ratings and a possible Google relationship were not promoted.",
      "reason": "Added as one proposed project from the live application and pending register; generator ratings and a possible Google relationship were not promoted.",
      "evidence_url": "https://apps.dep.wv.gov/Documents/DAQ/NSRPermits/079-00208/Draft/079-00208APP.pdf",
      "by": "Software-assisted second check",
      "claim_id": "cumulus-buffalo-data-center-wv",
      "record_id": "cumulus-buffalo-data-center-wv",
      "topic": "publication",
      "href": "/projects/cumulus-buffalo-data-center-wv/",
      "id": "change-777ef22bf85ba462e741",
      "change_type": "record-added"
    },
    {
      "date": "2026-09-13",
      "kind": "record-added",
      "from": "Not published",
      "to": "Added as one proposed campus; the 1.8 GW remains an announced design figure and separate generation and storage figures were excluded.",
      "reason": "Added as one proposed campus; the 1.8 GW remains an announced design figure and separate generation and storage figures were excluded.",
      "evidence_url": "https://www.energy.gov/articles/energy-department-announces-partnership-expand-reliable-affordable-energy-access-and-power",
      "by": "Software-assisted second check",
      "claim_id": "brookfield-paducah-site-ai-campus-ky",
      "record_id": "brookfield-paducah-site-ai-campus-ky",
      "topic": "publication",
      "href": "/projects/brookfield-paducah-site-ai-campus-ky/",
      "id": "change-7d27403119476d579d6c",
      "change_type": "record-added"
    },
    {
      "date": "2026-09-13",
      "kind": "record-added",
      "from": "Not published",
      "to": "Added with approved status bounded to the annexation agreement after independent review of Yorkville's project dockets.",
      "reason": "Added with approved status bounded to the annexation agreement after independent review of Yorkville's project dockets.",
      "evidence_url": "https://www.yorkville.il.us/906/Project-Cardinal-Data-Center-Campus-Anne",
      "by": "Software-assisted second check",
      "claim_id": "project-cardinal-yorkville",
      "record_id": "project-cardinal-yorkville",
      "topic": "publication",
      "href": "/projects/project-cardinal-yorkville/",
      "id": "change-86b46d085530510086af",
      "change_type": "record-added"
    },
    {
      "date": "2026-09-13",
      "kind": "record-added",
      "from": "Not published",
      "to": "Added as one construction-stage campus after separate review of current City pages; planned buildings were kept out of operating-facility counts and operator identity remains unknown.",
      "reason": "Added as one construction-stage campus after separate review of current City pages; planned buildings were kept out of operating-facility counts and operator identity remains unknown.",
      "evidence_url": "https://www.desotoks.us/496/Beale-Data-Center",
      "by": "Software-assisted second check",
      "claim_id": "beale-project-pilot-de-soto-ks",
      "record_id": "beale-project-pilot-de-soto-ks",
      "topic": "publication",
      "href": "/projects/beale-project-pilot-de-soto-ks/",
      "id": "change-99af5d68248ba79550c1",
      "change_type": "record-added"
    },
    {
      "date": "2026-09-13",
      "kind": "record-added",
      "from": "Not published",
      "to": "Added as one land-use-approved reuse project; construction, operation, capacity and operator remain unproven.",
      "reason": "Added as one land-use-approved reuse project; construction, operation, capacity and operator remain unproven.",
      "evidence_url": "https://www.weld.gov/Newsroom/2026-News/Weld-County-Commissioners-approve-Global-AI-data-center-permit",
      "by": "Software-assisted second check",
      "claim_id": "global-ai-weld-county-co",
      "record_id": "global-ai-weld-county-co",
      "topic": "publication",
      "href": "/projects/global-ai-weld-county-co/",
      "id": "change-9a38466d5a4ba2cb498f",
      "change_type": "record-added"
    },
    {
      "date": "2026-09-13",
      "kind": "record-added",
      "from": "Not published",
      "to": "Added as one approved building after separate review of City permit and planning records; non-official capacity and construction claims were excluded.",
      "reason": "Added as one approved building after separate review of City permit and planning records; non-official capacity and construction claims were excluded.",
      "evidence_url": "https://www.cityofnampa.us/DocumentCenter/View/20607/Monthly-Activity-Report---April-2026",
      "by": "Software-assisted second check",
      "claim_id": "project-bedrock-nampa-id",
      "record_id": "project-bedrock-nampa-id",
      "topic": "publication",
      "href": "/facilities/project-bedrock-nampa-id/",
      "id": "change-9a4ccd145194f83c5d91",
      "change_type": "record-added"
    },
    {
      "date": "2026-09-13",
      "kind": "record-added",
      "from": "Not published",
      "to": "Added as a bounded operating-facility record after independent review of the cited Wise County source.",
      "reason": "Added as a bounded operating-facility record after independent review of the cited Wise County source.",
      "evidence_url": "https://elevatewisecounty.com/top-industries/data-centers/",
      "by": "Software-assisted second check",
      "claim_id": "mineral-gap-data-center",
      "record_id": "mineral-gap-data-center",
      "topic": "publication",
      "href": "/facilities/mineral-gap-data-center/",
      "id": "change-9f5b577e42e65281454f",
      "change_type": "record-added"
    },
    {
      "date": "2026-09-13",
      "kind": "record-added",
      "from": "Not published",
      "to": "Added as a bounded proposed-stage project after independent review of the cited Wythe County record.",
      "reason": "Added as a bounded proposed-stage project after independent review of the cited Wythe County record.",
      "evidence_url": "https://www.wytheco.org/418/Solis-Arx",
      "by": "Software-assisted second check",
      "claim_id": "solis-arx-fluidstack-progress-park",
      "record_id": "solis-arx-fluidstack-progress-park",
      "topic": "publication",
      "href": "/projects/solis-arx-fluidstack-progress-park/",
      "id": "change-a187fb1acbd319bb8e2d",
      "change_type": "record-added"
    },
    {
      "date": "2026-09-13",
      "kind": "record-added",
      "from": "Not published",
      "to": "Added as one operating campus at Maiden/Catawba precision after separate review of the County statement; directory address, date, capacity and scale details were excluded.",
      "reason": "Added as one operating campus at Maiden/Catawba precision after separate review of the County statement; directory address, date, capacity and scale details were excluded.",
      "evidence_url": "https://www.catawbacountync.gov/news/joint-statement-on-microsoft-data-center-development-in-catawba-county/",
      "by": "Software-assisted second check",
      "claim_id": "apple-maiden-nc",
      "record_id": "apple-maiden-nc",
      "topic": "publication",
      "href": "/projects/apple-maiden-nc/",
      "id": "change-a4a6f9073edfef6326a0",
      "change_type": "record-added"
    },
    {
      "date": "2026-09-13",
      "kind": "record-added",
      "from": "Not published",
      "to": "Added as a bounded proposed-stage project after independent review of the cited Louisa County record.",
      "reason": "Added as a bounded proposed-stage project after independent review of the cited Louisa County record.",
      "evidence_url": "https://www.louisacounty.gov/CivicAlerts.aspx?AID=470",
      "by": "Software-assisted second check",
      "claim_id": "edgecore-shannon-hill",
      "record_id": "edgecore-shannon-hill",
      "topic": "publication",
      "href": "/projects/edgecore-shannon-hill/",
      "id": "change-ac20e5c967db835dbbe8",
      "change_type": "record-added"
    },
    {
      "date": "2026-09-13",
      "kind": "record-added",
      "from": "Not published",
      "to": "Added as one construction-stage building after fresh review of the municipal packet and meeting page; directory naming, capacity and opening claims were excluded.",
      "reason": "Added as one construction-stage building after fresh review of the municipal packet and meeting page; directory naming, capacity and opening claims were excluded.",
      "evidence_url": "https://mccmeetings.blob.core.usgovcloudapi.net/eatnvllefl-pubu/MEET-Packet-18ea706721f246eeb06a4e6f326d1ce9.pdf",
      "by": "Software-assisted second check",
      "claim_id": "hostdime-eatonville-fl",
      "record_id": "hostdime-eatonville-fl",
      "topic": "publication",
      "href": "/facilities/hostdime-eatonville-fl/",
      "id": "change-b197a086aff80f8cd958",
      "change_type": "record-added"
    },
    {
      "date": "2026-09-13",
      "kind": "record-added",
      "from": "Not published",
      "to": "Added as a proposed data-center project after a second review of the Commission source; the separate generation-certificate approval is preserved without promoting the project lifecycle.",
      "reason": "Added as a proposed data-center project after a second review of the Commission source; the separate generation-certificate approval is preserved without promoting the project lifecycle.",
      "evidence_url": "https://www.azcc.gov/news/home/2026/02/06/february-4--2026-open-meeting-highlights",
      "by": "Software-assisted second check",
      "claim_id": "project-baccara",
      "record_id": "project-baccara",
      "topic": "publication",
      "href": "/projects/project-baccara/",
      "id": "change-b4e3fbccc4be605322a5",
      "change_type": "record-added"
    },
    {
      "date": "2026-09-13",
      "kind": "record-added",
      "from": "Not published",
      "to": "Added as one construction-stage campus after fresh review of state, utility-commission and utility sources; unverified building, parcel and capacity details were excluded.",
      "reason": "Added as one construction-stage campus after fresh review of state, utility-commission and utility sources; unverified building, parcel and capacity details were excluded.",
      "evidence_url": "https://www.arkansasedc.com/news-events/newsroom/detail/2025/10/02/google-locating-new-data-center-in-west-memphis--arkansas-with-multi-billion-dollar-investment",
      "by": "Software-assisted second check",
      "claim_id": "google-west-memphis-campus",
      "record_id": "google-west-memphis-campus",
      "topic": "publication",
      "href": "/projects/google-west-memphis-campus/",
      "id": "change-c491d4e20090d6e3b4ca",
      "change_type": "record-added"
    },
    {
      "date": "2026-09-13",
      "kind": "record-added",
      "from": "Not published",
      "to": "Added as one construction-stage project; grid-energy capacity and industrial-park acreage were excluded from the data-center record.",
      "reason": "Added as one construction-stage project; grid-energy capacity and industrial-park acreage were excluded from the data-center record.",
      "evidence_url": "https://www.okcommerce.gov/meta-breaks-ground-on-data-center-in-tulsa/",
      "by": "Software-assisted second check",
      "claim_id": "meta-tulsa-ok",
      "record_id": "meta-tulsa-ok",
      "topic": "publication",
      "href": "/projects/meta-tulsa-ok/",
      "id": "change-ced445f7dc51fa623c52",
      "change_type": "record-added"
    },
    {
      "date": "2026-09-13",
      "kind": "record-added",
      "from": "Not published",
      "to": "Added as one proposed project after fresh review of current GCEDC materials; the rescinded 2025 configuration was not counted separately and 500 MW was typed only as an applicant estimate.",
      "reason": "Added as one proposed project after fresh review of current GCEDC materials; the rescinded 2025 configuration was not counted separately and 500 MW was typed only as an applicant estimate.",
      "evidence_url": "https://www.gcedc.com/projects",
      "by": "Software-assisted second check",
      "claim_id": "stream-stamp-alabama-ny",
      "record_id": "stream-stamp-alabama-ny",
      "topic": "publication",
      "href": "/projects/stream-stamp-alabama-ny/",
      "id": "change-d2e25756cf8fe5f97a69",
      "change_type": "record-added"
    },
    {
      "date": "2026-09-13",
      "kind": "record-added",
      "from": "Not published",
      "to": "Added as one state-announced proposed project; site, county, roles, approvals and capacity remain unknown.",
      "reason": "Added as one state-announced proposed project; site, county, roles, approvals and capacity remain unknown.",
      "evidence_url": "https://mississippi.org/news/amazon-continues-mississippi-expansion-announcing-plans-to-invest-a-total-of-25-billion-across-the-magnolia-state/",
      "by": "Software-assisted second check",
      "claim_id": "amazon-vicksburg-project-ms",
      "record_id": "amazon-vicksburg-project-ms",
      "topic": "publication",
      "href": "/projects/amazon-vicksburg-project-ms/",
      "id": "change-dc0808b0cecdc47b3a3c",
      "change_type": "record-added"
    },
    {
      "date": "2026-09-13",
      "kind": "record-added",
      "from": "Not published",
      "to": "Added as a permit-defined proposed project after independent review of current TCEQ records.",
      "reason": "Added as a permit-defined proposed project after independent review of current TCEQ records.",
      "evidence_url": "https://www.tceq.texas.gov/downloads/permitting/air/bilingual/pending-permit-notices/182880-pls-english.pdf",
      "by": "Software-assisted second check",
      "claim_id": "goodnight-data-center",
      "record_id": "goodnight-data-center",
      "topic": "publication",
      "href": "/projects/goodnight-data-center/",
      "id": "change-df1aa35646cd7c6734ff",
      "change_type": "record-added"
    },
    {
      "date": "2026-09-13",
      "kind": "record-added",
      "from": "Not published",
      "to": "Added as one construction-stage campus; the 302 MW and first-facility figures remain explicitly planned rather than current or operating.",
      "reason": "Added as one construction-stage campus; the 302 MW and first-facility figures remain explicitly planned rather than current or operating.",
      "evidence_url": "https://wyoleg.gov/InterimCommittee/2026/09-202606049-05WBCMaterialsPreparedforJointMinerals06052026.pdf",
      "by": "Software-assisted second check",
      "claim_id": "related-digital-cheyenne-wy",
      "record_id": "related-digital-cheyenne-wy",
      "topic": "publication",
      "href": "/projects/related-digital-cheyenne-wy/",
      "id": "change-ea6610fbc3c25ad34f28",
      "change_type": "record-added"
    },
    {
      "date": "2026-09-13",
      "kind": "record-added",
      "from": "Not published",
      "to": "Added as a bounded operating-campus record after a second review of the Nevada GOED minutes and application packet.",
      "reason": "Added as a bounded operating-campus record after a second review of the Nevada GOED minutes and application packet.",
      "evidence_url": "https://goed.nv.gov/wp-content/uploads/2024/09/3.-GOED-Board-Meeting-Minutes-July-25-2024.pdf",
      "by": "Software-assisted second check",
      "claim_id": "apple-reno-data-center",
      "record_id": "apple-reno-data-center",
      "topic": "publication",
      "href": "/projects/apple-reno-data-center/",
      "id": "change-ed6e5bbe1e27705c53f7",
      "change_type": "record-added"
    },
    {
      "date": "2026-09-13",
      "kind": "record-added",
      "from": "Not published",
      "to": "Added as one land-development-approved project; construction, operating roles and capacity remain unproven.",
      "reason": "Added as one land-development-approved project; construction, operating roles and capacity remain unproven.",
      "evidence_url": "https://www.fallstwp.com/resources/news/article/?id=10070",
      "by": "Software-assisted second check",
      "claim_id": "amazon-falls-township-data-center",
      "record_id": "amazon-falls-township-data-center",
      "topic": "publication",
      "href": "/projects/amazon-falls-township-data-center/",
      "id": "change-fb7c9f579cd32c6fbc49",
      "change_type": "record-added"
    },
    {
      "date": "2026-09-13",
      "kind": "record-added",
      "from": "Not published",
      "to": "Added as a bounded under-review project after independent review of Spotsylvania County case records.",
      "reason": "Added as a bounded under-review project after independent review of Spotsylvania County case records.",
      "evidence_url": "https://www.spotsylvania.va.us/DocumentCenter/View/40486/BOS-Memo-Planning-Dept-Monthly-and-Project-Summary-Reports-March-2026",
      "by": "Software-assisted second check",
      "claim_id": "massaponax-tech-campus",
      "record_id": "massaponax-tech-campus",
      "topic": "publication",
      "href": "/projects/massaponax-tech-campus/",
      "id": "change-fce979b406fe3b9df27a",
      "change_type": "record-added"
    },
    {
      "date": "2026-09-12",
      "kind": "verdict-changed",
      "from": "Partially supported",
      "to": "Not independently verified",
      "reason": "The operating Project Rainier milestone does not establish completion of every planned New Carlisle building or the full campus.",
      "by": "Software-assisted second check",
      "claim_id": "aws-campus-complete",
      "record_id": "aws-new-carlisle",
      "topic": "Project status",
      "href": "/claims/aws-campus-complete/",
      "id": "change-01a8b01daf6f809e60dc",
      "change_type": "verdict-changed"
    },
    {
      "date": "2026-09-12",
      "kind": "locator-changed",
      "from": "Only company descriptions of the proposed adjacent power facility were cited.",
      "to": "The preserved official OPSB case summary is cited separately from the developer's differing generation and storage figures.",
      "reason": "Primary-record follow-up confirmed the proposal and hearing date while preserving the unresolved MW discrepancy and outcome hold.",
      "evidence_url": "https://fairfieldenergycenter.com/home/utility-facility",
      "by": "Software-assisted second check",
      "claim_id": "millersport-rate-impact",
      "record_id": "vantage-oh2-millersport",
      "topic": "Power / developer claim",
      "href": "/claims/millersport-rate-impact/",
      "id": "change-04ba170b42eafac3c180",
      "change_type": "locator-changed"
    },
    {
      "date": "2026-09-12",
      "kind": "verdict-changed",
      "from": "Partially supported",
      "to": "Contradicted",
      "reason": "The reviewed statute remains in force, and the reported pause concerns new requests rather than repeal or cancellation of existing agreements.",
      "by": "Software-assisted second check",
      "claim_id": "ohio-exemption-pause",
      "record_id": null,
      "topic": "Taxes / incentives",
      "href": "/claims/ohio-exemption-pause/",
      "id": "change-071628bae1001b5d169f",
      "change_type": "verdict-changed"
    },
    {
      "date": "2026-09-12",
      "kind": "locator-changed",
      "from": "The direct Ohio EPA decision notice had not been retrieved.",
      "to": "The preserved official Ohio EPA Community Notice is cited with its dated heading and exact page location.",
      "reason": "Primary-record follow-up recovered the agency's own notice, and the second review re-read it; a later live recheck was unavailable and is not treated as a retraction.",
      "evidence_url": "https://epa.ohio.gov/divisions-and-offices/surface-water/permitting/npdes-general-permits",
      "by": "Software-assisted second check",
      "claim_id": "ohio-water-permit",
      "record_id": null,
      "topic": "Water / permits",
      "href": "/claims/ohio-water-permit/",
      "id": "change-0fed43b408ebf5cb7df8",
      "change_type": "locator-changed"
    },
    {
      "date": "2026-09-12",
      "kind": "locator-changed",
      "from": "The evidence link opened the report landing page and described the unit as million US gallons.",
      "to": "The evidence link opens the report PDF, cites the exact p. 97 table, and uses its printed unit, million gallons.",
      "reason": "Independent re-extraction confirmed the three Google-reported Ohio rows without turning company reporting into municipal measurement.",
      "evidence_url": "https://sustainability.google/files/google-2026-environmental-report.pdf",
      "by": "Software-assisted second check",
      "claim_id": "claim:google-ohio:2025-campus-water",
      "record_id": null,
      "topic": "Water",
      "href": "/claims/google-ohio-2025-campus-water/",
      "id": "change-25a5d7e4250b018325c7",
      "change_type": "locator-changed"
    },
    {
      "date": "2026-09-12",
      "kind": "locator-changed",
      "from": "The contract split was held because no independent retrieval was recorded.",
      "to": "Five Project 424567 portal instruments and the DATA agreement are cited with exact fields and contract locators.",
      "reason": "The second review reproduced the portal records while preserving the difference between authorized terms, portal fields, and observed outcomes.",
      "evidence_url": "https://transparencyportal.iedc.in.gov/viewtaxgrantloancontract/8c0f68149feaee11904d001dd8306d4e",
      "by": "Software-assisted second check",
      "claim_id": "claim:aws-new-carlisle:state-incentives",
      "record_id": "aws-new-carlisle",
      "topic": "state incentives",
      "href": "/claims/aws-new-carlisle-state-incentives/",
      "id": "change-2c5ed2fc1aa96c753369",
      "change_type": "locator-changed"
    },
    {
      "date": "2026-09-12",
      "kind": "correction",
      "from": "Previous value",
      "to": "IEDC Project 424567 portal instruments and the DATA agreement were independently retrieved and separated by program, status, field name and contractual condition.",
      "reason": "IEDC Project 424567 portal instruments and the DATA agreement were independently retrieved and separated by program, status, field name and contractual condition.",
      "by": "DataCenterData review",
      "claim_id": "aws-new-carlisle",
      "record_id": "aws-new-carlisle",
      "topic": "incentives_commitments",
      "href": "/indiana/#record-aws-new-carlisle",
      "id": "change-39fc8c5ee659f82f3b14",
      "change_type": "correction"
    },
    {
      "date": "2026-09-12",
      "kind": "verdict-changed",
      "from": "Partially supported",
      "to": "Contradicted",
      "reason": "The statute authorizes a complete or partial equipment sales-and-use-tax exemption; it does not establish that a qualifying project pays no taxes.",
      "by": "Software-assisted second check",
      "claim_id": "ohio-data-centers-no-taxes",
      "record_id": null,
      "topic": "Taxes / incentives",
      "href": "/claims/ohio-data-centers-no-taxes/",
      "id": "change-4bb0b36a27df6a412a5a",
      "change_type": "verdict-changed"
    },
    {
      "date": "2026-09-12",
      "kind": "record-added",
      "from": "Not published",
      "to": "Added as a bounded construction-stage campus record after a second review of the cited Eagle Mountain City sources.",
      "reason": "Added as a bounded construction-stage campus record after a second review of the cited Eagle Mountain City sources.",
      "evidence_url": "https://eaglemountain.gov/eagle-mountain-city-celebrates-major-milestone-with-qts-topping-out-ceremony/",
      "by": "Software-assisted second check",
      "claim_id": "qts-eagle-mountain-campus",
      "record_id": "qts-eagle-mountain-campus",
      "topic": "publication",
      "href": "/projects/qts-eagle-mountain-campus/",
      "id": "change-5ad33d915448c21fe4d3",
      "change_type": "record-added"
    },
    {
      "date": "2026-09-12",
      "kind": "verdict-changed",
      "from": "Partially supported; unknowns not recorded",
      "to": "Not independently verified; operating water unknowns and the future design scope are explicit",
      "reason": "The second review found that a literal zero-water conclusion is not established by Meta's narrower future design statement.",
      "by": "Software-assisted second check",
      "claim_id": "meta-closed-loop-zero-water",
      "record_id": "meta-lebanon",
      "topic": "Water / cooling",
      "href": "/claims/meta-closed-loop-zero-water/",
      "id": "change-6dcfa40392d245554a27",
      "change_type": "verdict-changed"
    },
    {
      "date": "2026-09-12",
      "kind": "wording-changed",
      "from": "Microsoft Quincy: Supported as delivered; combined measures and a 2021-2022 observation window",
      "to": "EPA documents an operating reuse system; distinct estimates and dated observations are separated",
      "reason": "The second review separated estimated savings, canal makeup and potable makeup share and removed an unsupported original-publication year.",
      "by": "Software-assisted second check",
      "claim_id": "claim:microsoft-quincy:cooling-water",
      "record_id": "microsoft-quincy",
      "topic": "Cooling + water",
      "href": "/claims/microsoft-quincy-cooling-water/",
      "id": "change-6e2b3c56853a84813211",
      "change_type": "wording-changed"
    },
    {
      "date": "2026-09-12",
      "kind": "correction",
      "from": "The tested opening proposition was attributed directly to Vantage Data Centers.",
      "to": "The proposition is labeled as a common reading; Vantage is cited only for its December 2025 opening target.",
      "reason": "The operator page states a forecast and does not claim that the first building opened or is operating.",
      "evidence_url": "https://vantage-dc.com/data-center-locations/north-america/new-albany-ohio",
      "by": "Software-assisted second check",
      "claim_id": "claim:vantage-oh1-new-albany:opening",
      "record_id": "vantage-oh1-new-albany",
      "topic": "Opening status",
      "href": "/claims/vantage-oh1-new-albany-opening/",
      "id": "change-806a7d7e5c2cc3137a6d",
      "change_type": "correction"
    },
    {
      "date": "2026-09-12",
      "kind": "correction",
      "from": "Previous value",
      "to": "Corrected operating to construction. The prior basis itself said operation was not established; city records support an active building project and groundbreaking, not operation.",
      "reason": "Corrected operating to construction. The prior basis itself said operation was not established; city records support an active building project and groundbreaking, not operation.",
      "by": "DataCenterData review",
      "claim_id": "edgeconnex-new-albany-oh",
      "record_id": "edgeconnex-new-albany-oh",
      "topic": "lifecycle_status",
      "href": "/ohio/#record-edgeconnex-new-albany-oh",
      "id": "change-8123df1c3daa7d5aea25",
      "change_type": "correction"
    },
    {
      "date": "2026-09-12",
      "kind": "wording-changed",
      "from": "Statewide tax/jobs scope; underlying operator not specified",
      "to": "One unnamed New Albany hyperscaler, tax year 2024 payable 2025; city-reported comparison",
      "reason": "The second review narrowed the place, taxpayer and time scope and made the missing underlying records explicit.",
      "by": "Software-assisted second check",
      "claim_id": "new-albany-payroll-equivalent",
      "record_id": null,
      "topic": "Taxes / jobs",
      "href": "/claims/new-albany-payroll-equivalent/",
      "id": "change-93fe05935b077f0caebe",
      "change_type": "wording-changed"
    },
    {
      "date": "2026-09-12",
      "kind": "record-added",
      "from": "Not published",
      "to": "Added as a bounded construction-stage campus record after a second review of the cited Wisconsin DNR sources.",
      "reason": "Added as a bounded construction-stage campus record after a second review of the cited Wisconsin DNR sources.",
      "evidence_url": "https://dnr.wisconsin.gov/topic/EIA/Portwashington.html",
      "by": "Software-assisted second check",
      "claim_id": "vantage-lighthouse-port-washington",
      "record_id": "vantage-lighthouse-port-washington",
      "topic": "publication",
      "href": "/projects/vantage-lighthouse-port-washington/",
      "id": "change-a2065cdcd3eafac9a120",
      "change_type": "record-added"
    },
    {
      "date": "2026-09-12",
      "kind": "correction",
      "from": "Previous value",
      "to": "Changed from construction to approved. The commission record establishes approval subject to commitments, but no reviewed primary source establishes that construction began.",
      "reason": "Changed from construction to approved. The commission record establishes approval subject to commitments, but no reviewed primary source establishes that construction began.",
      "by": "DataCenterData review",
      "claim_id": "sabey-indianapolis",
      "record_id": "sabey-indianapolis",
      "topic": "lifecycle_status",
      "href": "/indiana/#record-sabey-indianapolis",
      "id": "change-b1957c3965fbde0d609b",
      "change_type": "correction"
    },
    {
      "date": "2026-09-12",
      "kind": "wording-changed",
      "from": "The directory denominator can include buildings, suites and campuses; March 2026 PDF",
      "to": "The directory unit and deduplication are unreconciled; retained March-path PDF differs from the live page's current May-path target",
      "reason": "The second review removed an unsupported description of the directory denominator and distinguished URL-path timing from publication date.",
      "by": "Software-assisted second check",
      "claim_id": "ohio-count-200",
      "record_id": null,
      "topic": "Statewide count",
      "href": "/claims/ohio-count-200/",
      "id": "change-c99ac7fd5c69ad3d8c08",
      "change_type": "wording-changed"
    },
    {
      "date": "2026-09-12",
      "kind": "verdict-changed",
      "from": "Partially supported",
      "to": "Not independently verified",
      "reason": "One site's cost commitment cannot establish the statewide claim shown.",
      "by": "Software-assisted second check",
      "claim_id": "sabey-cost-allocation-generalized",
      "record_id": "sabey-indianapolis",
      "topic": "Power / cost allocation",
      "href": "/claims/sabey-cost-allocation-generalized/",
      "id": "change-dbb676bf19cd4fd68ef3",
      "change_type": "verdict-changed"
    },
    {
      "date": "2026-09-12",
      "kind": "locator-changed",
      "from": "The claim cited only Fairfield Energy's application description.",
      "to": "The claim now separates the preserved OPSB summary's 1,300/1,000 MW figures from Fairfield Energy's 1,350/1,040 MW figures.",
      "reason": "The official and company summaries disagree; neither is converted to data-center IT capacity and the underlying filing remains unavailable.",
      "evidence_url": "https://fairfieldenergycenter.com/home/utility-facility",
      "by": "Software-assisted second check",
      "claim_id": "claim:vantage-oh2-millersport:opsb-status",
      "record_id": "vantage-oh2-millersport",
      "topic": "OPSB / generation status",
      "href": "/claims/vantage-oh2-millersport-opsb-status/",
      "id": "change-f1f2857351ef245b667c",
      "change_type": "locator-changed"
    },
    {
      "date": "2026-09-12",
      "kind": "verdict-changed",
      "from": "Not yet due",
      "to": "Not independently verified",
      "reason": "The 600-plus first-phase forecast has no retrieved due date; the 2032 date belongs to a different 200-job scope.",
      "by": "Software-assisted second check",
      "claim_id": "microsoft-laporte-jobs-now",
      "record_id": "microsoft-la-porte",
      "topic": "Jobs / timing",
      "href": "/claims/microsoft-laporte-jobs-now/",
      "id": "change-f52f0cfdd8c3ac627547",
      "change_type": "verdict-changed"
    },
    {
      "date": "2026-09-12",
      "kind": "verdict-changed",
      "from": "Partially supported; framed as stranded distribution investment",
      "to": "Not independently verified; scope narrowed to AEP Ohio and infrastructure/transmission risk",
      "reason": "The second review found that the tariff supports risk allocation but not the absolute household-bill conclusion, and PUCO's own description is not limited to distribution.",
      "by": "Software-assisted second check",
      "claim_id": "aep-ratepayer-protection",
      "record_id": null,
      "topic": "Power / rates",
      "href": "/claims/aep-ratepayer-protection/",
      "id": "change-fa5e9cbc08ce480d613a",
      "change_type": "verdict-changed"
    },
    {
      "date": "2026-09-11",
      "kind": "correction",
      "from": "The PUCO-approved AEP Ohio tariff allocates substantial underuse and cancellation risk to new loads over 25 MW. That is real protection against stranded distribution investment; it is not proof that generation, transmission or wholesale-market costs can never affect household bills.",
      "to": "Added how the 85% minimum-demand term works by contract size and AEP's count of pre-tariff contracted load. Verdict unchanged. The 72.5% and 82.5% shares are DataCenterData arithmetic from AEP's published formula (15,000 kW plus 85% above 25,000 kW up to 75,000 kW; 57,500 kW plus 100% above 75,000 kW; capped at 85% of contract capacity).",
      "reason": "Added how the 85% minimum-demand term works by contract size and AEP's count of pre-tariff contracted load. Verdict unchanged. The 72.5% and 82.5% shares are DataCenterData arithmetic from AEP's published formula (15,000 kW plus 85% above 25,000 kW up to 75,000 kW; 57,500 kW plus 100% above 75,000 kW; capped at 85% of contract capacity).",
      "evidence_url": "https://www.aepohio.com/company/about/rates/data-center-tariff/",
      "by": "DataCenterData review",
      "evidence": [
        {
          "title": "AEP Ohio Data Center Tariff (minimum demand charges)",
          "url": "https://www.aepohio.com/company/about/rates/data-center-tariff/",
          "locator": "minimum demand formula: 'the minimum demand cannot exceed 85% of the total contract capacity'"
        },
        {
          "title": "AEP Ohio Updates PUCO on Data Center Load: Figures Show Tariff is Working (2026-02-13)",
          "url": "https://www.aepohio.com/company/news/view?releaseID=10753",
          "locator": "'in addition to 12,219 MW of data center contracts signed before the tariff went into effect'; 'AEP Ohio now has 17,861 MW of contracted data center projects'"
        }
      ],
      "claim_id": "aep-ratepayer-protection",
      "record_id": null,
      "topic": "Power / rates",
      "href": "/claims/aep-ratepayer-protection/",
      "id": "change-05524386df025f4b1bcf",
      "change_type": "correction"
    },
    {
      "date": "2026-09-11",
      "kind": "correction",
      "from": "At least 1,000 baseline; AWS's own July 2026 account says nearly 1,000 operations staff hired; an undated Chamber project page says 1,056 full-time AWS employees",
      "to": "2026-09-11: status was 'supported-as-delivered' with value 'At least 1,000 baseline; 1,056 full-time AWS employees later reported'. The company-linked counts sit on either side of the baseline (AWS op-ed: 'We have also hired nearly 1,000 operations staff so far'; Chamber page: '1,056 full-time AWS employees', undated), so the reviewed record does not support a delivery conclusion. Evidence level unchanged.",
      "reason": "2026-09-11: status was 'supported-as-delivered' with value 'At least 1,000 baseline; 1,056 full-time AWS employees later reported'. The company-linked counts sit on either side of the baseline (AWS op-ed: 'We have also hired nearly 1,000 operations staff so far'; Chamber page: '1,056 full-time AWS employees', undated), so the reviewed record does not support a delivery conclusion. Evidence level unchanged.",
      "evidence_url": "https://iedc.in.gov/events/news/details/2024/04/25/gov.-holcomb-announces-amazon-web-services-plans-to-invest-11b-to-create-a-new-data-center-campus-in-northern-indiana",
      "by": "DataCenterData review",
      "claim_id": "claim:aws-new-carlisle:permanent-jobs",
      "record_id": "aws-new-carlisle",
      "topic": "permanent jobs",
      "href": "/claims/aws-new-carlisle-permanent-jobs/",
      "id": "change-176bc62659d59a64aa80",
      "change_type": "correction"
    },
    {
      "date": "2026-09-11",
      "kind": "correction",
      "from": "Previous value",
      "to": "County resolved from Licking County parcel records. County is a typed field and may not hold a sentence.",
      "reason": "County resolved from Licking County parcel records. County is a typed field and may not hold a sentence.",
      "by": "DataCenterData review",
      "claim_id": "google-new-albany-oh",
      "record_id": "google-new-albany-oh",
      "topic": "county",
      "href": "/ohio/#record-google-new-albany-oh",
      "id": "change-19781c4c6cb90a4c07b5",
      "change_type": "correction"
    },
    {
      "date": "2026-09-11",
      "kind": "correction",
      "from": "Draft Ohio data-center general NPDES permit treated as if it were a final, measured water authorization.",
      "to": "Ohio EPA said on July 21, 2026 that it would not finalize draft OHD000001 and would continue with individual NPDES permits. A permit is not measured discharge.",
      "reason": "Correction chronology uses the recorded date, not the 21 July agency-event date.",
      "evidence_url": "https://www.clermontsun.com/2026/07/22/ohio-epa-will-not-finalize-proposed-data-center-general-permit",
      "by": "DataCenterData review",
      "claim_id": "ohio-water-permit",
      "record_id": null,
      "topic": "Water / permits",
      "href": "/claims/ohio-water-permit/",
      "id": "change-265670158917605fa4df",
      "change_type": "correction"
    },
    {
      "date": "2026-09-11",
      "kind": "correction",
      "from": "35-year state sales-tax exemption for at least $1B eligible capital, with possible extensions; local and NIPSCO incentives referenced but not yet reconciled.",
      "to": "Minutes record unanimous adoption of R-3-2026 under a title describing rescission of the 2024 taxpayer agreement and termination of its tax abatement; adopted resolution text not obtained; IEDC DATA exemption pending.",
      "reason": "Correction chronology uses the recorded date 2026-09-11; the source event date remains 2026-03-02.",
      "evidence_url": "https://www.cityoflaporte.com/uploads/minutes/m_1932_Council-Mar.2-2026-Minutes.docx",
      "by": "DataCenterData review",
      "claim_id": "claim:microsoft-la-porte:incentives",
      "record_id": "microsoft-la-porte",
      "topic": "Incentives",
      "href": "/claims/microsoft-la-porte-incentives/",
      "id": "change-2a1ecc7fbca62cde89f8",
      "change_type": "correction"
    },
    {
      "date": "2026-09-11",
      "kind": "correction",
      "from": "Previous value",
      "to": "County resolved from Licking County parcel records. County is a typed field and may not hold a sentence.",
      "reason": "County resolved from Licking County parcel records. County is a typed field and may not hold a sentence.",
      "by": "DataCenterData review",
      "claim_id": "meta-new-albany-oh",
      "record_id": "meta-new-albany-oh",
      "topic": "county",
      "href": "/ohio/#record-meta-new-albany-oh",
      "id": "change-34e696b3ede4555ec63c",
      "change_type": "correction"
    },
    {
      "date": "2026-09-11",
      "kind": "locator-changed",
      "from": "Previous locator",
      "to": "pp. 1–4 ($80 million community-payment total p. 1; $25 million announced p. 2; 'Right now it's not part of it' p. 4); extension resolution at p. 10",
      "reason": "2026-09-11: previously 'pp. 1–2; extension resolution at p. 10'.",
      "evidence_url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/12-22-25_minutes.pdf",
      "by": "DataCenterData review",
      "claim_id": "claim:coreweave-hammond:additional-payment",
      "record_id": "coreweave-hammond",
      "topic": "additional payment",
      "href": "/claims/coreweave-hammond-additional-payment/",
      "id": "change-3659344022f7a20e086e",
      "change_type": "locator-changed"
    },
    {
      "date": "2026-09-11",
      "kind": "correction",
      "from": "Previous value",
      "to": "previously '35-year state sales-tax exemption for at least $800M eligible capital, with extensions tied to additional eligible investment up to 50 years.' The $800M figure is the announcement's wording; the executed agreement (Exhibit A, section 2.A, page 13 of 18) says $845,000,000. The IEDC portal's separate 'expected qualified investment' field ($830M) is a different field and is not used here.",
      "reason": "previously '35-year state sales-tax exemption for at least $800M eligible capital, with extensions tied to additional eligible investment up to 50 years.' The $800M figure is the announcement's wording; the executed agreement (Exhibit A, section 2.A, page 13 of 18) says $845,000,000. The IEDC portal's separate 'expected qualified investment' field ($830M) is a different field and is not used here.",
      "by": "DataCenterData review",
      "claim_id": "google-fort-wayne",
      "record_id": "google-fort-wayne",
      "topic": "record",
      "href": "/indiana/#record-google-fort-wayne",
      "id": "change-3b3203c9b6fcdfdd13f3",
      "change_type": "correction"
    },
    {
      "date": "2026-09-11",
      "kind": "correction",
      "from": "Previous wording",
      "to": "2026-09-11: suite and ZIP added from the cited DataBank page ('1255 Euclid Ave Suite #200 - Cleveland, OH 44115'); CLE1 is a suite in a multi-tenant building, so the building should be counted once if other providers there are added.",
      "reason": "2026-09-11: suite and ZIP added from the cited DataBank page ('1255 Euclid Ave Suite #200 - Cleveland, OH 44115'); CLE1 is a suite in a multi-tenant building, so the building should be counted once if other providers there are added.",
      "by": "DataCenterData review",
      "claim_id": "databank-cle1",
      "record_id": "databank-cle1",
      "topic": "facility location",
      "href": "/ohio/#record-databank-cle1",
      "id": "change-5f4f050032fe2c08969e",
      "change_type": "correction"
    },
    {
      "date": "2026-09-11",
      "kind": "correction",
      "from": "Previous value",
      "to": "The Common Council minutes record 'Motion/Vote – Adopt Resolution R-3-2026' and say the motion was unanimously carried. The LEAP director states that the resolution refers to the taxpayer agreement approved in 2024 with Microsoft.",
      "reason": "The Common Council minutes record 'Motion/Vote – Adopt Resolution R-3-2026' and say the motion was unanimously carried. The LEAP director states that the resolution refers to the taxpayer agreement approved in 2024 with Microsoft.",
      "by": "DataCenterData review",
      "claim_id": "microsoft-la-porte",
      "record_id": "microsoft-la-porte",
      "topic": "record",
      "href": "/indiana/#record-microsoft-la-porte",
      "id": "change-6077c68dc6f89b491cb4",
      "change_type": "correction"
    },
    {
      "date": "2026-09-11",
      "kind": "correction",
      "from": "Previous wording",
      "to": "2026-09-11: publisher was 'Indianapolis Metropolitan Development Commission filing' and kind 'municipal case record containing an existing Indianapolis facility list'.",
      "reason": "2026-09-11: publisher was 'Indianapolis Metropolitan Development Commission filing' and kind 'municipal case record containing an existing Indianapolis facility list'.",
      "by": "DataCenterData review",
      "claim_id": "indiana-census-appendix",
      "record_id": null,
      "topic": "indianapolis_appendix",
      "href": "/indiana/",
      "id": "change-7eff65ee3022c3655717",
      "change_type": "correction"
    },
    {
      "date": "2026-09-11",
      "kind": "locator-changed",
      "from": "Previous locator",
      "to": "pp. 3–11 (resolution 25R-16 introduced p. 3; lease, jobs, tax terms and community impact payment p. 4; NIPSCO contingency p. 6)",
      "reason": "2026-09-11: previously 'pp. 3–4'.",
      "evidence_url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/06-09-25_minutes.pdf",
      "by": "DataCenterData review",
      "claim_id": "claim:coreweave-hammond:incentives",
      "record_id": "coreweave-hammond",
      "topic": "incentives",
      "href": "/claims/coreweave-hammond-incentives/",
      "id": "change-8301c185d4c6c47912d9",
      "change_type": "locator-changed"
    },
    {
      "date": "2026-09-11",
      "kind": "correction",
      "from": "Previous wording",
      "to": "2026-09-11: previously 'Thousands of construction jobs and hundreds of full-time positions; company projection'. Quantified figures are from the FAQ answer 'How many jobs will this project create?' on https://q.com/data-centers/van-wert/.",
      "reason": "2026-09-11: previously 'Thousands of construction jobs and hundreds of full-time positions; company projection'. Quantified figures are from the FAQ answer 'How many jobs will this project create?' on https://q.com/data-centers/van-wert/.",
      "by": "DataCenterData review",
      "claim_id": "qts-van-wert-oh",
      "record_id": "qts-van-wert-oh",
      "topic": "jobs",
      "href": "/ohio/#record-qts-van-wert-oh",
      "id": "change-9322c5657a16c600fca0",
      "change_type": "correction"
    },
    {
      "date": "2026-09-11",
      "kind": "correction",
      "from": "Ohio's consumer advocate repeats a commercial directory count. It is useful as a market signal, but the underlying unit can include buildings, suites and campuses and is not a state census. DataCenterData does not adopt 200+ as its own count.",
      "to": "Added the wording difference between OCC's web fact sheet and its PDF fact sheet. Verdict unchanged.",
      "reason": "Added the wording difference between OCC's web fact sheet and its PDF fact sheet. Verdict unchanged.",
      "evidence_url": "https://occ.ohio.gov/factsheet/quick-facts-data-centers-ohio",
      "by": "DataCenterData review",
      "evidence": [
        {
          "title": "Quick Facts: Data Centers in Ohio (web page)",
          "url": "https://occ.ohio.gov/factsheet/quick-facts-data-centers-ohio",
          "locator": "'Ohio has more than 200 data centers, making it the fifth-highest state in the country.'"
        },
        {
          "title": "Data Centers in Ohio (OCC fact sheet PDF, March 2026)",
          "url": "https://occ.ohio.gov/sites/default/files/2026-03/OCC-Data-Centers-in-Ohio.pdf",
          "locator": "'Ohio has about 200 data centers, making it the fifth highest state in the country.'"
        }
      ],
      "claim_id": "ohio-count-200",
      "record_id": null,
      "topic": "Statewide count",
      "href": "/claims/ohio-count-200/",
      "id": "change-9cb8072b4f8fa1f13ee7",
      "change_type": "correction"
    },
    {
      "date": "2026-09-11",
      "kind": "locator-changed",
      "from": "Previous locator",
      "to": "pp. 1–4 ($80 million community-payment total p. 1; $25 million announced p. 2; 'Right now it's not part of it' p. 4); extension resolution at p. 10",
      "reason": "2026-09-11: previously 'pp. 1–2; extension resolution at p. 10'.",
      "evidence_url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/12-22-25_minutes.pdf",
      "by": "DataCenterData review",
      "claim_id": "claim:coreweave-hammond:power-agreement",
      "record_id": "coreweave-hammond",
      "topic": "power agreement",
      "href": "/claims/coreweave-hammond-power-agreement/",
      "id": "change-a34c342fcc4782e667d4",
      "change_type": "locator-changed"
    },
    {
      "date": "2026-09-11",
      "kind": "correction",
      "from": "Previous value",
      "to": "County resolved from Licking County parcel records. County is a typed field and may not hold a sentence.",
      "reason": "County resolved from Licking County parcel records. County is a typed field and may not hold a sentence.",
      "by": "DataCenterData review",
      "claim_id": "vantage-oh1-new-albany",
      "record_id": "vantage-oh1-new-albany",
      "topic": "county",
      "href": "/ohio/#record-vantage-oh1-new-albany",
      "id": "change-a7d0bf497d14485a4439",
      "change_type": "correction"
    },
    {
      "date": "2026-09-11",
      "kind": "locator-changed",
      "from": "Previous locator",
      "to": "pp. 1–4 ($80 million community-payment total p. 1; $25 million announced p. 2; 'Right now it's not part of it' p. 4); extension resolution at p. 10",
      "reason": "2026-09-11: previously 'pp. 1–2; extension resolution at p. 10'.",
      "evidence_url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/12-22-25_minutes.pdf",
      "by": "DataCenterData review",
      "claim_id": "claim:coreweave-hammond:incentives",
      "record_id": "coreweave-hammond",
      "topic": "incentives",
      "href": "/claims/coreweave-hammond-incentives/",
      "id": "change-af15e2db628d7df6e99e",
      "change_type": "locator-changed"
    },
    {
      "date": "2026-09-11",
      "kind": "locator-changed",
      "from": "Previous locator",
      "to": "pp. 3–11 (resolution 25R-16 introduced p. 3; lease, jobs, tax terms and community impact payment p. 4; NIPSCO contingency p. 6)",
      "reason": "2026-09-11: previously 'pp. 3–4'.",
      "evidence_url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/06-09-25_minutes.pdf",
      "by": "DataCenterData review",
      "claim_id": "claim:coreweave-hammond:power-agreement",
      "record_id": "coreweave-hammond",
      "topic": "power agreement",
      "href": "/claims/coreweave-hammond-power-agreement/",
      "id": "change-b4bc19b4a03e8b4299c6",
      "change_type": "locator-changed"
    },
    {
      "date": "2026-09-11",
      "kind": "correction",
      "from": "Previous value",
      "to": "status was 'supported-as-delivered' with value 'At least 1,000 baseline; 1,056 full-time AWS employees later reported'. The company-linked counts sit on either side of the baseline, so the reviewed record does not support a delivery conclusion.",
      "reason": "status was 'supported-as-delivered' with value 'At least 1,000 baseline; 1,056 full-time AWS employees later reported'. The company-linked counts sit on either side of the baseline, so the reviewed record does not support a delivery conclusion.",
      "by": "DataCenterData review",
      "claim_id": "aws-new-carlisle",
      "record_id": "aws-new-carlisle",
      "topic": "permanent_jobs",
      "href": "/indiana/#record-aws-new-carlisle",
      "id": "change-bc78270a14bbe9841eed",
      "change_type": "correction"
    },
    {
      "date": "2026-09-11",
      "kind": "locator-changed",
      "from": "Previous locator",
      "to": "pp. 3–11 (resolution 25R-16 introduced p. 3; lease, jobs, tax terms and community impact payment p. 4; NIPSCO contingency p. 6)",
      "reason": "2026-09-11: previously 'pp. 3–4'.",
      "evidence_url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/06-09-25_minutes.pdf",
      "by": "DataCenterData review",
      "claim_id": "claim:coreweave-hammond:expansion-design",
      "record_id": "coreweave-hammond",
      "topic": "expansion design",
      "href": "/claims/coreweave-hammond-expansion-design/",
      "id": "change-c4b13648014d657c8069",
      "change_type": "locator-changed"
    },
    {
      "date": "2026-09-11",
      "kind": "locator-changed",
      "from": "Previous locator",
      "to": "pp. 3–11 (resolution 25R-16 introduced p. 3; lease, jobs, tax terms and community impact payment p. 4; NIPSCO contingency p. 6)",
      "reason": "2026-09-11: previously 'pp. 3–4'.",
      "evidence_url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/06-09-25_minutes.pdf",
      "by": "DataCenterData review",
      "claim_id": "claim:coreweave-hammond:community-impact-payments",
      "record_id": "coreweave-hammond",
      "topic": "community impact payments",
      "href": "/claims/coreweave-hammond-community-impact-payments/",
      "id": "change-c8a5e7588a21d28932f0",
      "change_type": "locator-changed"
    },
    {
      "date": "2026-09-11",
      "kind": "locator-changed",
      "from": "Previous locator",
      "to": "pp. 1–4 ($80 million community-payment total p. 1; $25 million announced p. 2; 'Right now it's not part of it' p. 4); extension resolution at p. 10",
      "reason": "2026-09-11: previously 'pp. 1–2; extension resolution at p. 10'.",
      "evidence_url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/12-22-25_minutes.pdf",
      "by": "DataCenterData review",
      "claim_id": "claim:coreweave-hammond:community-impact-payments",
      "record_id": "coreweave-hammond",
      "topic": "community impact payments",
      "href": "/claims/coreweave-hammond-community-impact-payments/",
      "id": "change-d4b0a3a81c6e4cc7b54f",
      "change_type": "locator-changed"
    },
    {
      "date": "2026-09-11",
      "kind": "correction",
      "from": "Previous value",
      "to": "status was 'Approved; construction not verified' while the only linked source was the petitioner's appendix, which shows a request rather than a decision. The verification source is now the commission's hearing results. Prior verification_url: https://indianapolis-in.municodemeetings.com/sites/indianapolis-in.municodemeetings.com/files/fileattachments/mdc_hearing_examiner/meeting/5368/2025-cap-856_2025-cvr-856_petitioner_appendix_mdc_3-18-26_final.pdf; prior verified_fields: local filing, cooling claim, cost commitment.",
      "reason": "status was 'Approved; construction not verified' while the only linked source was the petitioner's appendix, which shows a request rather than a decision. The verification source is now the commission's hearing results. Prior verification_url: https://indianapolis-in.municodemeetings.com/sites/indianapolis-in.municodemeetings.com/files/fileattachments/mdc_hearing_examiner/meeting/5368/2025-cap-856_2025-cvr-856_petitioner_appendix_mdc_3-18-26_final.pdf; prior verified_fields: local filing, cooling claim, cost commitment.",
      "by": "DataCenterData review",
      "claim_id": "sabey-indianapolis",
      "record_id": "sabey-indianapolis",
      "topic": "record",
      "href": "/indiana/#record-sabey-indianapolis",
      "id": "change-db9f224022507202340c",
      "change_type": "correction"
    },
    {
      "date": "2026-09-11",
      "kind": "locator-changed",
      "from": "Previous locator",
      "to": "pp. 3–11 (resolution 25R-16 introduced p. 3; lease, jobs, tax terms and community impact payment p. 4; NIPSCO contingency p. 6)",
      "reason": "2026-09-11: previously 'pp. 3–4'.",
      "evidence_url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/06-09-25_minutes.pdf",
      "by": "DataCenterData review",
      "claim_id": "claim:coreweave-hammond:permanent-jobs",
      "record_id": "coreweave-hammond",
      "topic": "permanent jobs",
      "href": "/claims/coreweave-hammond-permanent-jobs/",
      "id": "change-e537c045ae58b657894b",
      "change_type": "locator-changed"
    },
    {
      "date": "2026-09-11",
      "kind": "correction",
      "from": "35-year state sales-tax exemption for at least $1B eligible capital, with possible extensions; local and NIPSCO incentives referenced but not yet reconciled.",
      "to": "The 2 March 2026 council minutes record unanimous adoption of Resolution R-3-2026, whose agenda title describes rescission of the 2024 Microsoft taxpayer agreement, including termination of the tax abatement. DataCenterData has not obtained the adopted resolution text and therefore does not independently state its full legal effect. IEDC showed the state DATA exemption as a pending accepted offer when checked.",
      "reason": "Primary municipal minutes record introduction and unanimous adoption of R-3-2026.",
      "evidence_url": "https://www.cityoflaporte.com/uploads/minutes/m_1932_Council-Mar.2-2026-Minutes.docx",
      "by": "DataCenterData review",
      "claim_id": "in-microsoft-la-porte-r-3-2026",
      "record_id": "microsoft-la-porte",
      "topic": "incentives_commitments",
      "href": "/indiana/#record-microsoft-la-porte",
      "source": {
        "title": "La Porte Common Council minutes, March 2, 2026",
        "url": "https://www.cityoflaporte.com/uploads/minutes/m_1932_Council-Mar.2-2026-Minutes.docx"
      },
      "id": "in-microsoft-la-porte-r-3-2026",
      "change_type": "correction"
    },
    {
      "date": "2026-09-11",
      "kind": "correction",
      "from": "Two Indiana project registers with different IDs for the same projects (microsoft-la-porte-1 vs microsoft-la-porte; digital-crossroads-hammond vs coreweave-hammond counted as parallel eights).",
      "to": "One Indiana project file. microsoft-la-porte is canonical (alias microsoft-la-porte-1). Digital Crossroads Hammond is the campus; CoreWeave Hammond is the child expansion project; DX-1 remains the operating facility.",
      "reason": "Remove the duplicate Indiana project authority before any further state expansion.",
      "evidence_url": "/data/registry.json",
      "by": "DataCenterData review",
      "claim_id": "in-project-register-reconciliation",
      "record_id": "microsoft-la-porte",
      "topic": "stable_id",
      "href": "/indiana/#record-microsoft-la-porte",
      "source": {
        "title": "DataCenterData coherent-core registry",
        "url": "/data/registry.json"
      },
      "id": "in-project-register-reconciliation",
      "change_type": "correction"
    },
    {
      "date": "2026-09-11",
      "kind": "correction",
      "from": "Draft Ohio data-center general NPDES permit treated as if it were a final, measured water authorization.",
      "to": "Ohio EPA said on July 21 it would not finalize draft OHD000001 and would continue with individual NPDES permits. A draft permit is not measured discharge.",
      "reason": "Stable public citation for the agency's July 21 notice.",
      "evidence_url": "https://www.clermontsun.com/2026/07/22/ohio-epa-will-not-finalize-proposed-data-center-general-permit",
      "by": "DataCenterData review",
      "claim_id": "ohio-water-permit",
      "record_id": null,
      "topic": "ohio-claim-checks.json:ohio-water-permit",
      "href": "/changes/",
      "source": {
        "title": "Ohio EPA will not finalize proposed data-center general permit (agency notice republished by The Clermont Sun)",
        "url": "https://www.clermontsun.com/2026/07/22/ohio-epa-will-not-finalize-proposed-data-center-general-permit"
      },
      "id": "oh-epa-general-permit-withdrawal",
      "change_type": "correction"
    },
    {
      "date": "2026-09-11",
      "kind": "correction",
      "from": "Unknown pending parcel resolution",
      "to": "Licking",
      "reason": "County GIS parcels resolve the three campus counties. County is a typed field and may not hold a sentence.",
      "evidence_url": "https://gis.lickingcounty.gov/server/rest/services/Auditor/ParcelsSearch/FeatureServer/0",
      "by": "DataCenterData review",
      "claim_id": "oh-new-albany-campus-counties",
      "record_id": "google-new-albany-oh",
      "topic": "county",
      "href": "/ohio/#record-google-new-albany-oh",
      "source": {
        "title": "Licking County parcel records for Google, Meta and Vantage OH1 New Albany campuses",
        "url": "https://gis.lickingcounty.gov/server/rest/services/Auditor/ParcelsSearch/FeatureServer/0"
      },
      "id": "oh-new-albany-campus-counties",
      "change_type": "correction"
    },
    {
      "id": "in-hammond-expansion-expired-2026-06-30",
      "state": "IN",
      "stable_entity": "coreweave-hammond",
      "event_type": "agreement expired",
      "effective_date": "2026-06-30",
      "published_date": "2026-07-01",
      "finding": "Hammond says required milestones were not satisfied and the expansion agreement expired after two extensions. The existing DX-1 facility remains a separate operating record.",
      "confidence": "high",
      "source": {
        "title": "Hammond agreement-expiration notice",
        "url": "https://www.gohammond.com/hammond-announces-expiration-of-data-center-development-agreement/",
        "type": "municipal outcome record"
      },
      "stable_id": "in-hammond-expansion-expired-2026-06-30",
      "record_unit": "lifecycle_event",
      "date": "2026-06-30",
      "change_type": "lifecycle-event",
      "by": "DataCenterData review"
    },
    {
      "id": "in-microsoft-laporte-groundbreaking-2026-06",
      "state": "IN",
      "stable_entity": "microsoft-la-porte",
      "event_type": "groundbreaking",
      "effective_date": "2026-06",
      "finding": "Microsoft reported groundbreaking in La Porte. Its job and cooling statements remain projections or design claims rather than observed outcomes.",
      "confidence": "high",
      "source": {
        "title": "Microsoft La Porte groundbreaking update",
        "url": "https://local.microsoft.com/blog/microsoft-breaks-ground-on-la-porte-datacenter-project/",
        "type": "company status update"
      },
      "stable_id": "in-microsoft-laporte-groundbreaking-2026-06",
      "record_unit": "lifecycle_event",
      "date": "2026-06",
      "change_type": "lifecycle-event",
      "by": "DataCenterData review"
    },
    {
      "id": "in-meta-lebanon-groundbreaking-2026-02-11",
      "state": "IN",
      "stable_entity": "meta-lebanon",
      "event_type": "groundbreaking",
      "effective_date": "2026-02-11",
      "finding": "Meta and Indiana reported the Lebanon campus groundbreaking. Operation and promised outcomes are not yet due or established by this event.",
      "confidence": "high",
      "source": {
        "title": "Indiana Meta Lebanon groundbreaking release",
        "url": "https://iedc.in.gov/events/news/details/2026/02/11/gov.-braun-breaks-ground-on-10b-meta-data-center-campus-at-leap-district",
        "type": "government announcement"
      },
      "stable_id": "in-meta-lebanon-groundbreaking-2026-02-11",
      "record_unit": "lifecycle_event",
      "date": "2026-02-11",
      "change_type": "lifecycle-event",
      "by": "DataCenterData review"
    },
    {
      "id": "in-hammond-expansion-approved-2025-06-09",
      "state": "IN",
      "stable_entity": "coreweave-hammond",
      "event_type": "development agreement approved",
      "effective_date": "2025-06-09",
      "finding": "Hammond approved a development agreement for a proposed CoreWeave-occupied expansion at 301 Digital Crossroads.",
      "confidence": "high",
      "source": {
        "title": "Hammond Common Council minutes",
        "url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/06-09-25_minutes.pdf",
        "type": "municipal meeting record"
      },
      "stable_id": "in-hammond-expansion-approved-2025-06-09",
      "record_unit": "lifecycle_event",
      "date": "2025-06-09",
      "change_type": "lifecycle-event",
      "by": "DataCenterData review"
    },
    {
      "id": "in-aws-project-rainier-operating-2025",
      "state": "IN",
      "stable_entity": "aws-new-carlisle",
      "event_type": "partial operation",
      "effective_date": "2025",
      "finding": "Amazon says the multi-site Project Rainier compute cluster is operational and identifies New Carlisle as one site. Full New Carlisle campus completion is not established.",
      "confidence": "medium",
      "source": {
        "title": "Amazon Project Rainier update",
        "url": "https://www.aboutamazon.com/news/aws/aws-project-rainier-ai-trainium-chips-compute-cluster",
        "type": "company operating claim"
      },
      "stable_id": "in-aws-project-rainier-operating-2025",
      "record_unit": "lifecycle_event",
      "date": "2025",
      "change_type": "lifecycle-event",
      "by": "DataCenterData review"
    },
    {
      "id": "in-google-fort-wayne-energized-2024-11",
      "state": "IN",
      "stable_entity": "google-fort-wayne",
      "event_type": "energization",
      "effective_date": "2024-11",
      "finding": "Indiana Michigan Power told the IURC that the site was energized in November 2024. The same 2026 order says Google had begun operation while construction continued, but it does not date the start of operation to November 2024.",
      "confidence": "high",
      "source": {
        "title": "IURC final order, Cause No. 46276",
        "url": "https://www.in.gov/iurc/files/ord_46276_042926.pdf",
        "type": "utility commission final order"
      },
      "stable_id": "in-google-fort-wayne-energized-2024-11",
      "record_unit": "lifecycle_event",
      "date": "2024-11",
      "change_type": "lifecycle-event",
      "by": "DataCenterData review"
    },
    {
      "id": "oh-expedient-cmh3-addition-2024",
      "state": "OH",
      "stable_entity": "expedient-cmh3",
      "event_type": "operator portfolio addition",
      "effective_date": "2024",
      "finding": "Expedient announced that it added the former Nationwide facility to its portfolio in 2024. Nationwide remained the landlord while Expedient took operational control.",
      "confidence": "medium",
      "source": {
        "title": "Expedient adds fifth Ohio data center",
        "url": "https://expedient.com/about/press/2024-02-13-expedient-expands-again-adds-fifth-ohio-data-center/",
        "type": "dated operator announcement"
      },
      "stable_id": "oh-expedient-cmh3-addition-2024",
      "record_unit": "lifecycle_event",
      "date": "2024",
      "change_type": "lifecycle-event",
      "by": "DataCenterData review"
    },
    {
      "id": "oh-stack-new-albany-acquisition-2019",
      "state": "OH",
      "stable_entity": "stack-nal01-oh",
      "event_type": "acquisition",
      "effective_date": "2019",
      "finding": "STACK announced acquisition of a New Albany campus containing an existing purpose-built Tier III data center. The reviewed record does not establish whether that building is today's NAL01A or NAL01B.",
      "confidence": "medium",
      "source": {
        "title": "STACK New Albany acquisition announcement",
        "url": "https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-continues-growth-establishing-a-presence-in-new-albany-ohio/",
        "type": "company acquisition announcement"
      },
      "stable_id": "oh-stack-new-albany-acquisition-2019",
      "record_unit": "lifecycle_event",
      "date": "2019",
      "change_type": "lifecycle-event",
      "by": "DataCenterData review"
    },
    {
      "id": "oh-databank-cle1-acquisition-2017",
      "state": "OH",
      "stable_entity": "databank-cle1",
      "event_type": "acquisition",
      "effective_date": "2017",
      "finding": "DataBank says it acquired the Cleveland facility from 365 Data Centers in 2017. The former operator is history, not a second facility.",
      "confidence": "medium",
      "source": {
        "title": "DataBank CLE1 facility page",
        "url": "https://www.databank.com/data-centers/cleveland/1255-euclid-ave/",
        "type": "current operator disclosure"
      },
      "stable_id": "oh-databank-cle1-acquisition-2017",
      "record_unit": "lifecycle_event",
      "date": "2017",
      "change_type": "lifecycle-event",
      "by": "DataCenterData review"
    }
  ]
}