{
  "schema_version": "0.5",
  "record_count": 65,
  "corrections": [
    {
      "date": "2026-09-17",
      "kind": "locator-changed",
      "from": "The source link used an OPSB case-summary URL that now returns 404.",
      "to": "The working source link now opens Fairfield Energy's live project page, which identifies OPSB case 26-0160-EL-BGN.",
      "reason": "The historical OPSB summary is described as preserved evidence rather than presented as a working page; the official case-summary URL returns 404 and the Docketing Information System rejected a direct case request during this check.",
      "evidence_url": "https://fairfieldenergycenter.com/home/utility-facility",
      "by": "Editorial classification update",
      "claim_id": "claim:vantage-oh2-millersport:opsb-status",
      "record_id": "vantage-oh2-millersport",
      "topic": "OPSB / generation status",
      "href": "/claims/vantage-oh2-millersport-opsb-status/",
      "id": "change-229702ffaf591710062a"
    },
    {
      "date": "2026-09-17",
      "kind": "locator-changed",
      "from": "The source link used an OPSB case-summary URL that now returns 404.",
      "to": "The working source link now opens Fairfield Energy's live project page, which identifies OPSB case 26-0160-EL-BGN.",
      "reason": "The historical OPSB summary is described as preserved evidence rather than presented as a working page; the official case-summary URL returns 404 and the Docketing Information System rejected a direct case request during this check.",
      "evidence_url": "https://fairfieldenergycenter.com/home/utility-facility",
      "by": "Editorial classification update",
      "claim_id": "millersport-rate-impact",
      "record_id": "vantage-oh2-millersport",
      "topic": "Power / developer claim",
      "href": "/claims/millersport-rate-impact/",
      "id": "change-a3fd655eb84c9aed69ac"
    },
    {
      "date": "2026-09-16",
      "kind": "wording-changed",
      "from": "Google The Dalles: Mixed evidence",
      "to": "Google says The Dalles aquifer project added more than 100 million gallons a year of stored-water capacity for the community.",
      "reason": "A source re-read replaced a generated status label with the exact company claim and separated community storage capacity from data-center water use.",
      "by": "Editorial classification update",
      "claim_id": "claim:google-the-dalles:cooling-water",
      "record_id": "google-the-dalles",
      "topic": "Cooling + water",
      "href": "/claims/google-the-dalles-cooling-water/",
      "id": "change-0c54e7ce294028b6c1f7"
    },
    {
      "date": "2026-09-16",
      "kind": "wording-changed",
      "from": "Meta Jeffersonville: Not verifiable",
      "to": "Meta's Jeffersonville announcement establishes the campus's cooling design and water use.",
      "reason": "A source re-read converted a generated status label into the exact inference being tested and restored a concise unit boundary.",
      "by": "Editorial classification update",
      "claim_id": "claim:meta-jeffersonville:cooling-water",
      "record_id": "meta-jeffersonville",
      "topic": "Cooling + water",
      "href": "/claims/meta-jeffersonville-cooling-water/",
      "id": "change-1af97d4bf2a9d87afb90"
    },
    {
      "date": "2026-09-16",
      "kind": "wording-changed",
      "from": "Microsoft Mount Pleasant: Announced",
      "to": "Microsoft says its Mount Pleasant pilot will use closed-loop chip-level cooling without evaporating water for cooling.",
      "reason": "A source re-read replaced a generated status label with the exact company claim and restored a concise unit boundary.",
      "by": "Editorial classification update",
      "claim_id": "claim:microsoft-mount-pleasant:cooling-water",
      "record_id": "microsoft-mount-pleasant",
      "topic": "Cooling + water",
      "href": "/claims/microsoft-mount-pleasant-cooling-water/",
      "id": "change-1f035815ec0761d312a1"
    },
    {
      "date": "2026-09-16",
      "kind": "wording-changed",
      "from": "Google Fort Wayne: Not verifiable",
      "to": "The reviewed utility order establishes Google Fort Wayne's cooling design and water use.",
      "reason": "A source re-read converted a generated status label into the exact inference being tested and restored a concise unit boundary.",
      "by": "Editorial classification update",
      "claim_id": "claim:google-fort-wayne:cooling-water",
      "record_id": "google-fort-wayne",
      "topic": "Cooling + water",
      "href": "/claims/google-fort-wayne-cooling-water/",
      "id": "change-8c550e26eb1e453ef07b"
    },
    {
      "date": "2026-09-16",
      "kind": "verdict-changed",
      "from": "Company claim",
      "to": "Unknown",
      "reason": "The page tests a common inference about what the announcement establishes; Meta did not make the cooling-and-water statement shown.",
      "by": "Editorial classification update",
      "claim_id": "claim:meta-jeffersonville:cooling-water",
      "record_id": "meta-jeffersonville",
      "topic": "Cooling + water",
      "href": "/claims/meta-jeffersonville-cooling-water/",
      "id": "change-fd865b8928ddea06491e"
    },
    {
      "date": "2026-09-14",
      "kind": "verdict-changed",
      "from": "Not independently verified",
      "to": "Partially supported",
      "reason": "The tariff supports part of the risk-allocation claim, but it does not prove that generation, transmission or wholesale-market costs can never affect household bills.",
      "by": "Editorial classification update",
      "claim_id": "aep-ratepayer-protection",
      "record_id": null,
      "topic": "Power / rates",
      "href": "/claims/aep-ratepayer-protection/",
      "id": "change-1dc68ccdb5d33601288e"
    },
    {
      "date": "2026-09-14",
      "kind": "verdict-changed",
      "from": "Not independently verified",
      "to": "Supported",
      "reason": "The government announcement supports the stated term. It does not establish an executed agreement, a due date or any payment received.",
      "by": "Editorial classification update",
      "claim_id": "claim:meta-lebanon:city-impact-payment",
      "record_id": "meta-lebanon",
      "topic": "city impact payment",
      "href": "/claims/meta-lebanon-city-impact-payment/",
      "id": "change-24836c6252b44b08adaf"
    },
    {
      "date": "2026-09-14",
      "kind": "verdict-changed",
      "from": "Not independently verified",
      "to": "Company claim",
      "reason": "The figure is a company projection; neither cited announcement is an observed payroll or employment record.",
      "by": "Editorial classification update",
      "claim_id": "claim:meta-lebanon:permanent-jobs",
      "record_id": "meta-lebanon",
      "topic": "permanent jobs",
      "href": "/claims/meta-lebanon-permanent-jobs/",
      "id": "change-3ad57a25a1fd659d46c1"
    },
    {
      "date": "2026-09-14",
      "kind": "verdict-changed",
      "from": "Not independently verified",
      "to": "Partially supported",
      "reason": "The cited commitment supports cost allocation for one site, but it cannot establish the statewide generalization shown.",
      "by": "Editorial classification update",
      "claim_id": "sabey-cost-allocation-generalized",
      "record_id": "sabey-indianapolis",
      "topic": "Power / cost allocation",
      "href": "/claims/sabey-cost-allocation-generalized/",
      "id": "change-3c0c72a53f92a81d6ba3"
    },
    {
      "date": "2026-09-14",
      "kind": "verdict-changed",
      "from": "Not independently verified",
      "to": "Supported",
      "reason": "The government announcement, portal fields and agreement support the carefully limited description of authorized terms. They do not prove delivery, jobs or completed investment.",
      "by": "Editorial classification update",
      "claim_id": "claim:aws-new-carlisle:state-incentives",
      "record_id": "aws-new-carlisle",
      "topic": "state incentives",
      "href": "/claims/aws-new-carlisle-state-incentives/",
      "id": "change-433cefb2db86ed37a365"
    },
    {
      "date": "2026-09-14",
      "kind": "verdict-changed",
      "from": "Not independently verified",
      "to": "Unknown",
      "reason": "This card tests a common inference, not an attributed outside statement. The operating milestone still does not establish completion of every planned building or the full campus.",
      "by": "Editorial classification update",
      "claim_id": "aws-campus-complete",
      "record_id": "aws-new-carlisle",
      "topic": "Project status",
      "href": "/claims/aws-campus-complete/",
      "id": "change-60fc92c8918d9b41e532"
    },
    {
      "date": "2026-09-14",
      "kind": "verdict-changed",
      "from": "Not independently verified",
      "to": "Company claim",
      "reason": "The exact investment figure is a Meta projection. The government announcement repeats it but does not establish completed or placed-in-service capital.",
      "by": "Editorial classification update",
      "claim_id": "claim:meta-lebanon:investment",
      "record_id": "meta-lebanon",
      "topic": "investment",
      "href": "/claims/meta-lebanon-investment/",
      "id": "change-6e38530742f89883a9f5"
    },
    {
      "date": "2026-09-14",
      "kind": "verdict-changed",
      "from": "Not independently verified",
      "to": "Supported",
      "reason": "The government announcement supports the stated term. It does not establish the controlling agreement or exemptions actually claimed.",
      "by": "Editorial classification update",
      "claim_id": "claim:meta-lebanon:state-sales-tax-exemption",
      "record_id": "meta-lebanon",
      "topic": "state sales-tax exemption",
      "href": "/claims/meta-lebanon-state-sales-tax-exemption/",
      "id": "change-7315a8a80d0a0895b1eb"
    },
    {
      "date": "2026-09-14",
      "kind": "verdict-changed",
      "from": "Not independently verified",
      "to": "Contradicted",
      "reason": "The claim says the projected jobs already exist, while the cited company source still describes a forecast and the government source describes a different job scope.",
      "by": "Editorial classification update",
      "claim_id": "microsoft-laporte-jobs-now",
      "record_id": "microsoft-la-porte",
      "topic": "Jobs / timing",
      "href": "/claims/microsoft-laporte-jobs-now/",
      "id": "change-eb63465aff65aa3565da"
    },
    {
      "date": "2026-09-14",
      "kind": "verdict-changed",
      "from": "Not independently verified",
      "to": "Company claim",
      "reason": "The peak construction-jobs figure is a company projection, not an observed workforce count or job-years measure.",
      "by": "Editorial classification update",
      "claim_id": "claim:meta-lebanon:construction-jobs",
      "record_id": "meta-lebanon",
      "topic": "construction jobs",
      "href": "/claims/meta-lebanon-construction-jobs/",
      "id": "change-eb8d3fc4f667a5a58d0a"
    },
    {
      "date": "2026-09-14",
      "kind": "verdict-changed",
      "from": "Not independently verified",
      "to": "Unknown",
      "reason": "The prior label is defined for an unverified statement by a non-company party. This card tests a common inference instead; the reviewed company source does not establish annual or total campus water use.",
      "by": "Editorial classification update",
      "claim_id": "meta-closed-loop-zero-water",
      "record_id": "meta-lebanon",
      "topic": "Water / cooling",
      "href": "/claims/meta-closed-loop-zero-water/",
      "id": "change-fddc9fd242c755d738cd"
    },
    {
      "date": "2026-09-12",
      "kind": "verdict-changed",
      "from": "Partially supported",
      "to": "Not independently verified",
      "reason": "The operating Project Rainier milestone does not establish completion of every planned New Carlisle building or the full campus.",
      "by": "Software-assisted second check",
      "claim_id": "aws-campus-complete",
      "record_id": "aws-new-carlisle",
      "topic": "Project status",
      "href": "/claims/aws-campus-complete/",
      "id": "change-01a8b01daf6f809e60dc"
    },
    {
      "date": "2026-09-12",
      "kind": "locator-changed",
      "from": "Only company descriptions of the proposed adjacent power facility were cited.",
      "to": "The preserved official OPSB case summary is cited separately from the developer's differing generation and storage figures.",
      "reason": "Primary-record follow-up confirmed the proposal and hearing date while preserving the unresolved MW discrepancy and outcome hold.",
      "evidence_url": "https://fairfieldenergycenter.com/home/utility-facility",
      "by": "Software-assisted second check",
      "claim_id": "millersport-rate-impact",
      "record_id": "vantage-oh2-millersport",
      "topic": "Power / developer claim",
      "href": "/claims/millersport-rate-impact/",
      "id": "change-04ba170b42eafac3c180"
    },
    {
      "date": "2026-09-12",
      "kind": "verdict-changed",
      "from": "Partially supported",
      "to": "Contradicted",
      "reason": "The reviewed statute remains in force, and the reported pause concerns new requests rather than repeal or cancellation of existing agreements.",
      "by": "Software-assisted second check",
      "claim_id": "ohio-exemption-pause",
      "record_id": null,
      "topic": "Taxes / incentives",
      "href": "/claims/ohio-exemption-pause/",
      "id": "change-071628bae1001b5d169f"
    },
    {
      "date": "2026-09-12",
      "kind": "locator-changed",
      "from": "The direct Ohio EPA decision notice had not been retrieved.",
      "to": "The preserved official Ohio EPA Community Notice is cited with its dated heading and exact page location.",
      "reason": "Primary-record follow-up recovered the agency's own notice, and the second review re-read it; a later live recheck was unavailable and is not treated as a retraction.",
      "evidence_url": "https://epa.ohio.gov/divisions-and-offices/surface-water/permitting/npdes-general-permits",
      "by": "Software-assisted second check",
      "claim_id": "ohio-water-permit",
      "record_id": null,
      "topic": "Water / permits",
      "href": "/claims/ohio-water-permit/",
      "id": "change-0fed43b408ebf5cb7df8"
    },
    {
      "date": "2026-09-12",
      "kind": "locator-changed",
      "from": "The evidence link opened the report landing page and described the unit as million US gallons.",
      "to": "The evidence link opens the report PDF, cites the exact p. 97 table, and uses its printed unit, million gallons.",
      "reason": "Independent re-extraction confirmed the three Google-reported Ohio rows without turning company reporting into municipal measurement.",
      "evidence_url": "https://sustainability.google/files/google-2026-environmental-report.pdf",
      "by": "Software-assisted second check",
      "claim_id": "claim:google-ohio:2025-campus-water",
      "record_id": null,
      "topic": "Water",
      "href": "/claims/google-ohio-2025-campus-water/",
      "id": "change-25a5d7e4250b018325c7"
    },
    {
      "date": "2026-09-12",
      "kind": "locator-changed",
      "from": "The contract split was held because no independent retrieval was recorded.",
      "to": "Five Project 424567 portal instruments and the DATA agreement are cited with exact fields and contract locators.",
      "reason": "The second review reproduced the portal records while preserving the difference between authorized terms, portal fields, and observed outcomes.",
      "evidence_url": "https://transparencyportal.iedc.in.gov/viewtaxgrantloancontract/8c0f68149feaee11904d001dd8306d4e",
      "by": "Software-assisted second check",
      "claim_id": "claim:aws-new-carlisle:state-incentives",
      "record_id": "aws-new-carlisle",
      "topic": "state incentives",
      "href": "/claims/aws-new-carlisle-state-incentives/",
      "id": "change-2c5ed2fc1aa96c753369"
    },
    {
      "date": "2026-09-12",
      "kind": "correction",
      "from": "Previous value",
      "to": "IEDC Project 424567 portal instruments and the DATA agreement were independently retrieved and separated by program, status, field name and contractual condition.",
      "reason": "IEDC Project 424567 portal instruments and the DATA agreement were independently retrieved and separated by program, status, field name and contractual condition.",
      "by": "DataCenterData review",
      "claim_id": "aws-new-carlisle",
      "record_id": "aws-new-carlisle",
      "topic": "incentives_commitments",
      "href": "/indiana/#record-aws-new-carlisle",
      "id": "change-39fc8c5ee659f82f3b14"
    },
    {
      "date": "2026-09-12",
      "kind": "verdict-changed",
      "from": "Partially supported",
      "to": "Contradicted",
      "reason": "The statute authorizes a complete or partial equipment sales-and-use-tax exemption; it does not establish that a qualifying project pays no taxes.",
      "by": "Software-assisted second check",
      "claim_id": "ohio-data-centers-no-taxes",
      "record_id": null,
      "topic": "Taxes / incentives",
      "href": "/claims/ohio-data-centers-no-taxes/",
      "id": "change-4bb0b36a27df6a412a5a"
    },
    {
      "date": "2026-09-12",
      "kind": "verdict-changed",
      "from": "Partially supported; unknowns not recorded",
      "to": "Not independently verified; operating water unknowns and the future design scope are explicit",
      "reason": "The second review found that a literal zero-water conclusion is not established by Meta's narrower future design statement.",
      "by": "Software-assisted second check",
      "claim_id": "meta-closed-loop-zero-water",
      "record_id": "meta-lebanon",
      "topic": "Water / cooling",
      "href": "/claims/meta-closed-loop-zero-water/",
      "id": "change-6dcfa40392d245554a27"
    },
    {
      "date": "2026-09-12",
      "kind": "wording-changed",
      "from": "Microsoft Quincy: Supported as delivered; combined measures and a 2021-2022 observation window",
      "to": "EPA documents an operating reuse system; distinct estimates and dated observations are separated",
      "reason": "The second review separated estimated savings, canal makeup and potable makeup share and removed an unsupported original-publication year.",
      "by": "Software-assisted second check",
      "claim_id": "claim:microsoft-quincy:cooling-water",
      "record_id": "microsoft-quincy",
      "topic": "Cooling + water",
      "href": "/claims/microsoft-quincy-cooling-water/",
      "id": "change-6e2b3c56853a84813211"
    },
    {
      "date": "2026-09-12",
      "kind": "correction",
      "from": "The tested opening proposition was attributed directly to Vantage Data Centers.",
      "to": "The proposition is labeled as a common reading; Vantage is cited only for its December 2025 opening target.",
      "reason": "The operator page states a forecast and does not claim that the first building opened or is operating.",
      "evidence_url": "https://vantage-dc.com/data-center-locations/north-america/new-albany-ohio",
      "by": "Software-assisted second check",
      "claim_id": "claim:vantage-oh1-new-albany:opening",
      "record_id": "vantage-oh1-new-albany",
      "topic": "Opening status",
      "href": "/claims/vantage-oh1-new-albany-opening/",
      "id": "change-806a7d7e5c2cc3137a6d"
    },
    {
      "date": "2026-09-12",
      "kind": "correction",
      "from": "Previous value",
      "to": "Corrected operating to construction. The prior basis itself said operation was not established; city records support an active building project and groundbreaking, not operation.",
      "reason": "Corrected operating to construction. The prior basis itself said operation was not established; city records support an active building project and groundbreaking, not operation.",
      "by": "DataCenterData review",
      "claim_id": "edgeconnex-new-albany-oh",
      "record_id": "edgeconnex-new-albany-oh",
      "topic": "lifecycle_status",
      "href": "/ohio/#record-edgeconnex-new-albany-oh",
      "id": "change-8123df1c3daa7d5aea25"
    },
    {
      "date": "2026-09-12",
      "kind": "wording-changed",
      "from": "Statewide tax/jobs scope; underlying operator not specified",
      "to": "One unnamed New Albany hyperscaler, tax year 2024 payable 2025; city-reported comparison",
      "reason": "The second review narrowed the place, taxpayer and time scope and made the missing underlying records explicit.",
      "by": "Software-assisted second check",
      "claim_id": "new-albany-payroll-equivalent",
      "record_id": null,
      "topic": "Taxes / jobs",
      "href": "/claims/new-albany-payroll-equivalent/",
      "id": "change-93fe05935b077f0caebe"
    },
    {
      "date": "2026-09-12",
      "kind": "correction",
      "from": "Previous value",
      "to": "Changed from construction to approved. The commission record establishes approval subject to commitments, but no reviewed primary source establishes that construction began.",
      "reason": "Changed from construction to approved. The commission record establishes approval subject to commitments, but no reviewed primary source establishes that construction began.",
      "by": "DataCenterData review",
      "claim_id": "sabey-indianapolis",
      "record_id": "sabey-indianapolis",
      "topic": "lifecycle_status",
      "href": "/indiana/#record-sabey-indianapolis",
      "id": "change-b1957c3965fbde0d609b"
    },
    {
      "date": "2026-09-12",
      "kind": "wording-changed",
      "from": "The directory denominator can include buildings, suites and campuses; March 2026 PDF",
      "to": "The directory unit and deduplication are unreconciled; retained March-path PDF differs from the live page's current May-path target",
      "reason": "The second review removed an unsupported description of the directory denominator and distinguished URL-path timing from publication date.",
      "by": "Software-assisted second check",
      "claim_id": "ohio-count-200",
      "record_id": null,
      "topic": "Statewide count",
      "href": "/claims/ohio-count-200/",
      "id": "change-c99ac7fd5c69ad3d8c08"
    },
    {
      "date": "2026-09-12",
      "kind": "verdict-changed",
      "from": "Partially supported",
      "to": "Not independently verified",
      "reason": "One site's cost commitment cannot establish the statewide claim shown.",
      "by": "Software-assisted second check",
      "claim_id": "sabey-cost-allocation-generalized",
      "record_id": "sabey-indianapolis",
      "topic": "Power / cost allocation",
      "href": "/claims/sabey-cost-allocation-generalized/",
      "id": "change-dbb676bf19cd4fd68ef3"
    },
    {
      "date": "2026-09-12",
      "kind": "locator-changed",
      "from": "The claim cited only Fairfield Energy's application description.",
      "to": "The claim now separates the preserved OPSB summary's 1,300/1,000 MW figures from Fairfield Energy's 1,350/1,040 MW figures.",
      "reason": "The official and company summaries disagree; neither is converted to data-center IT capacity and the underlying filing remains unavailable.",
      "evidence_url": "https://fairfieldenergycenter.com/home/utility-facility",
      "by": "Software-assisted second check",
      "claim_id": "claim:vantage-oh2-millersport:opsb-status",
      "record_id": "vantage-oh2-millersport",
      "topic": "OPSB / generation status",
      "href": "/claims/vantage-oh2-millersport-opsb-status/",
      "id": "change-f1f2857351ef245b667c"
    },
    {
      "date": "2026-09-12",
      "kind": "verdict-changed",
      "from": "Not yet due",
      "to": "Not independently verified",
      "reason": "The 600-plus first-phase forecast has no retrieved due date; the 2032 date belongs to a different 200-job scope.",
      "by": "Software-assisted second check",
      "claim_id": "microsoft-laporte-jobs-now",
      "record_id": "microsoft-la-porte",
      "topic": "Jobs / timing",
      "href": "/claims/microsoft-laporte-jobs-now/",
      "id": "change-f52f0cfdd8c3ac627547"
    },
    {
      "date": "2026-09-12",
      "kind": "verdict-changed",
      "from": "Partially supported; framed as stranded distribution investment",
      "to": "Not independently verified; scope narrowed to AEP Ohio and infrastructure/transmission risk",
      "reason": "The second review found that the tariff supports risk allocation but not the absolute household-bill conclusion, and PUCO's own description is not limited to distribution.",
      "by": "Software-assisted second check",
      "claim_id": "aep-ratepayer-protection",
      "record_id": null,
      "topic": "Power / rates",
      "href": "/claims/aep-ratepayer-protection/",
      "id": "change-fa5e9cbc08ce480d613a"
    },
    {
      "date": "2026-09-11",
      "kind": "correction",
      "from": "The PUCO-approved AEP Ohio tariff allocates substantial underuse and cancellation risk to new loads over 25 MW. That is real protection against stranded distribution investment; it is not proof that generation, transmission or wholesale-market costs can never affect household bills.",
      "to": "Added how the 85% minimum-demand term works by contract size and AEP's count of pre-tariff contracted load. Verdict unchanged. The 72.5% and 82.5% shares are DataCenterData arithmetic from AEP's published formula (15,000 kW plus 85% above 25,000 kW up to 75,000 kW; 57,500 kW plus 100% above 75,000 kW; capped at 85% of contract capacity).",
      "reason": "Added how the 85% minimum-demand term works by contract size and AEP's count of pre-tariff contracted load. Verdict unchanged. The 72.5% and 82.5% shares are DataCenterData arithmetic from AEP's published formula (15,000 kW plus 85% above 25,000 kW up to 75,000 kW; 57,500 kW plus 100% above 75,000 kW; capped at 85% of contract capacity).",
      "evidence_url": "https://www.aepohio.com/company/about/rates/data-center-tariff/",
      "by": "DataCenterData review",
      "evidence": [
        {
          "title": "AEP Ohio Data Center Tariff (minimum demand charges)",
          "url": "https://www.aepohio.com/company/about/rates/data-center-tariff/",
          "locator": "minimum demand formula: 'the minimum demand cannot exceed 85% of the total contract capacity'"
        },
        {
          "title": "AEP Ohio Updates PUCO on Data Center Load: Figures Show Tariff is Working (2026-02-13)",
          "url": "https://www.aepohio.com/company/news/view?releaseID=10753",
          "locator": "'in addition to 12,219 MW of data center contracts signed before the tariff went into effect'; 'AEP Ohio now has 17,861 MW of contracted data center projects'"
        }
      ],
      "claim_id": "aep-ratepayer-protection",
      "record_id": null,
      "topic": "Power / rates",
      "href": "/claims/aep-ratepayer-protection/",
      "id": "change-05524386df025f4b1bcf"
    },
    {
      "date": "2026-09-11",
      "kind": "correction",
      "from": "At least 1,000 baseline; AWS's own July 2026 account says nearly 1,000 operations staff hired; an undated Chamber project page says 1,056 full-time AWS employees",
      "to": "2026-09-11: status was 'supported-as-delivered' with value 'At least 1,000 baseline; 1,056 full-time AWS employees later reported'. The company-linked counts sit on either side of the baseline (AWS op-ed: 'We have also hired nearly 1,000 operations staff so far'; Chamber page: '1,056 full-time AWS employees', undated), so the reviewed record does not support a delivery conclusion. Evidence level unchanged.",
      "reason": "2026-09-11: status was 'supported-as-delivered' with value 'At least 1,000 baseline; 1,056 full-time AWS employees later reported'. The company-linked counts sit on either side of the baseline (AWS op-ed: 'We have also hired nearly 1,000 operations staff so far'; Chamber page: '1,056 full-time AWS employees', undated), so the reviewed record does not support a delivery conclusion. Evidence level unchanged.",
      "evidence_url": "https://iedc.in.gov/events/news/details/2024/04/25/gov.-holcomb-announces-amazon-web-services-plans-to-invest-11b-to-create-a-new-data-center-campus-in-northern-indiana",
      "by": "DataCenterData review",
      "claim_id": "claim:aws-new-carlisle:permanent-jobs",
      "record_id": "aws-new-carlisle",
      "topic": "permanent jobs",
      "href": "/claims/aws-new-carlisle-permanent-jobs/",
      "id": "change-176bc62659d59a64aa80"
    },
    {
      "date": "2026-09-11",
      "kind": "correction",
      "from": "Previous value",
      "to": "County resolved from Licking County parcel records. County is a typed field and may not hold a sentence.",
      "reason": "County resolved from Licking County parcel records. County is a typed field and may not hold a sentence.",
      "by": "DataCenterData review",
      "claim_id": "google-new-albany-oh",
      "record_id": "google-new-albany-oh",
      "topic": "county",
      "href": "/ohio/#record-google-new-albany-oh",
      "id": "change-19781c4c6cb90a4c07b5"
    },
    {
      "date": "2026-09-11",
      "kind": "correction",
      "from": "Draft Ohio data-center general NPDES permit treated as if it were a final, measured water authorization.",
      "to": "Ohio EPA said on July 21, 2026 that it would not finalize draft OHD000001 and would continue with individual NPDES permits. A permit is not measured discharge.",
      "reason": "Correction chronology uses the recorded date, not the 21 July agency-event date.",
      "evidence_url": "https://www.clermontsun.com/2026/07/22/ohio-epa-will-not-finalize-proposed-data-center-general-permit",
      "by": "DataCenterData review",
      "claim_id": "ohio-water-permit",
      "record_id": null,
      "topic": "Water / permits",
      "href": "/claims/ohio-water-permit/",
      "id": "change-265670158917605fa4df"
    },
    {
      "date": "2026-09-11",
      "kind": "correction",
      "from": "35-year state sales-tax exemption for at least $1B eligible capital, with possible extensions; local and NIPSCO incentives referenced but not yet reconciled.",
      "to": "Minutes record unanimous adoption of R-3-2026 under a title describing rescission of the 2024 taxpayer agreement and termination of its tax abatement; adopted resolution text not obtained; IEDC DATA exemption pending.",
      "reason": "Correction chronology uses the recorded date 2026-09-11; the source event date remains 2026-03-02.",
      "evidence_url": "https://www.cityoflaporte.com/uploads/minutes/m_1932_Council-Mar.2-2026-Minutes.docx",
      "by": "DataCenterData review",
      "claim_id": "claim:microsoft-la-porte:incentives",
      "record_id": "microsoft-la-porte",
      "topic": "Incentives",
      "href": "/claims/microsoft-la-porte-incentives/",
      "id": "change-2a1ecc7fbca62cde89f8"
    },
    {
      "date": "2026-09-11",
      "kind": "correction",
      "from": "Previous value",
      "to": "County resolved from Licking County parcel records. County is a typed field and may not hold a sentence.",
      "reason": "County resolved from Licking County parcel records. County is a typed field and may not hold a sentence.",
      "by": "DataCenterData review",
      "claim_id": "meta-new-albany-oh",
      "record_id": "meta-new-albany-oh",
      "topic": "county",
      "href": "/ohio/#record-meta-new-albany-oh",
      "id": "change-34e696b3ede4555ec63c"
    },
    {
      "date": "2026-09-11",
      "kind": "locator-changed",
      "from": "Previous locator",
      "to": "pp. 1–4 ($80 million community-payment total p. 1; $25 million announced p. 2; 'Right now it's not part of it' p. 4); extension resolution at p. 10",
      "reason": "2026-09-11: previously 'pp. 1–2; extension resolution at p. 10'.",
      "evidence_url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/12-22-25_minutes.pdf",
      "by": "DataCenterData review",
      "claim_id": "claim:coreweave-hammond:additional-payment",
      "record_id": "coreweave-hammond",
      "topic": "additional payment",
      "href": "/claims/coreweave-hammond-additional-payment/",
      "id": "change-3659344022f7a20e086e"
    },
    {
      "date": "2026-09-11",
      "kind": "correction",
      "from": "Previous value",
      "to": "previously '35-year state sales-tax exemption for at least $800M eligible capital, with extensions tied to additional eligible investment up to 50 years.' The $800M figure is the announcement's wording; the executed agreement (Exhibit A, section 2.A, page 13 of 18) says $845,000,000. The IEDC portal's separate 'expected qualified investment' field ($830M) is a different field and is not used here.",
      "reason": "previously '35-year state sales-tax exemption for at least $800M eligible capital, with extensions tied to additional eligible investment up to 50 years.' The $800M figure is the announcement's wording; the executed agreement (Exhibit A, section 2.A, page 13 of 18) says $845,000,000. The IEDC portal's separate 'expected qualified investment' field ($830M) is a different field and is not used here.",
      "by": "DataCenterData review",
      "claim_id": "google-fort-wayne",
      "record_id": "google-fort-wayne",
      "topic": "record",
      "href": "/indiana/#record-google-fort-wayne",
      "id": "change-3b3203c9b6fcdfdd13f3"
    },
    {
      "date": "2026-09-11",
      "kind": "correction",
      "from": "Previous wording",
      "to": "2026-09-11: suite and ZIP added from the cited DataBank page ('1255 Euclid Ave Suite #200 - Cleveland, OH 44115'); CLE1 is a suite in a multi-tenant building, so the building should be counted once if other providers there are added.",
      "reason": "2026-09-11: suite and ZIP added from the cited DataBank page ('1255 Euclid Ave Suite #200 - Cleveland, OH 44115'); CLE1 is a suite in a multi-tenant building, so the building should be counted once if other providers there are added.",
      "by": "DataCenterData review",
      "claim_id": "databank-cle1",
      "record_id": "databank-cle1",
      "topic": "facility location",
      "href": "/ohio/#record-databank-cle1",
      "id": "change-5f4f050032fe2c08969e"
    },
    {
      "date": "2026-09-11",
      "kind": "correction",
      "from": "Previous value",
      "to": "The Common Council minutes record 'Motion/Vote – Adopt Resolution R-3-2026' and say the motion was unanimously carried. The LEAP director states that the resolution refers to the taxpayer agreement approved in 2024 with Microsoft.",
      "reason": "The Common Council minutes record 'Motion/Vote – Adopt Resolution R-3-2026' and say the motion was unanimously carried. The LEAP director states that the resolution refers to the taxpayer agreement approved in 2024 with Microsoft.",
      "by": "DataCenterData review",
      "claim_id": "microsoft-la-porte",
      "record_id": "microsoft-la-porte",
      "topic": "record",
      "href": "/indiana/#record-microsoft-la-porte",
      "id": "change-6077c68dc6f89b491cb4"
    },
    {
      "date": "2026-09-11",
      "kind": "correction",
      "from": "Previous wording",
      "to": "2026-09-11: publisher was 'Indianapolis Metropolitan Development Commission filing' and kind 'municipal case record containing an existing Indianapolis facility list'.",
      "reason": "2026-09-11: publisher was 'Indianapolis Metropolitan Development Commission filing' and kind 'municipal case record containing an existing Indianapolis facility list'.",
      "by": "DataCenterData review",
      "claim_id": "indiana-census-appendix",
      "record_id": null,
      "topic": "indianapolis_appendix",
      "href": "/indiana/",
      "id": "change-7eff65ee3022c3655717"
    },
    {
      "date": "2026-09-11",
      "kind": "locator-changed",
      "from": "Previous locator",
      "to": "pp. 3–11 (resolution 25R-16 introduced p. 3; lease, jobs, tax terms and community impact payment p. 4; NIPSCO contingency p. 6)",
      "reason": "2026-09-11: previously 'pp. 3–4'.",
      "evidence_url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/06-09-25_minutes.pdf",
      "by": "DataCenterData review",
      "claim_id": "claim:coreweave-hammond:incentives",
      "record_id": "coreweave-hammond",
      "topic": "incentives",
      "href": "/claims/coreweave-hammond-incentives/",
      "id": "change-8301c185d4c6c47912d9"
    },
    {
      "date": "2026-09-11",
      "kind": "correction",
      "from": "Previous wording",
      "to": "2026-09-11: previously 'Thousands of construction jobs and hundreds of full-time positions; company projection'. Quantified figures are from the FAQ answer 'How many jobs will this project create?' on https://q.com/data-centers/van-wert/.",
      "reason": "2026-09-11: previously 'Thousands of construction jobs and hundreds of full-time positions; company projection'. Quantified figures are from the FAQ answer 'How many jobs will this project create?' on https://q.com/data-centers/van-wert/.",
      "by": "DataCenterData review",
      "claim_id": "qts-van-wert-oh",
      "record_id": "qts-van-wert-oh",
      "topic": "jobs",
      "href": "/ohio/#record-qts-van-wert-oh",
      "id": "change-9322c5657a16c600fca0"
    },
    {
      "date": "2026-09-11",
      "kind": "correction",
      "from": "Ohio's consumer advocate repeats a commercial directory count. It is useful as a market signal, but the underlying unit can include buildings, suites and campuses and is not a state census. DataCenterData does not adopt 200+ as its own count.",
      "to": "Added the wording difference between OCC's web fact sheet and its PDF fact sheet. Verdict unchanged.",
      "reason": "Added the wording difference between OCC's web fact sheet and its PDF fact sheet. Verdict unchanged.",
      "evidence_url": "https://occ.ohio.gov/factsheet/quick-facts-data-centers-ohio",
      "by": "DataCenterData review",
      "evidence": [
        {
          "title": "Quick Facts: Data Centers in Ohio (web page)",
          "url": "https://occ.ohio.gov/factsheet/quick-facts-data-centers-ohio",
          "locator": "'Ohio has more than 200 data centers, making it the fifth-highest state in the country.'"
        },
        {
          "title": "Data Centers in Ohio (OCC fact sheet PDF, March 2026)",
          "url": "https://occ.ohio.gov/sites/default/files/2026-03/OCC-Data-Centers-in-Ohio.pdf",
          "locator": "'Ohio has about 200 data centers, making it the fifth highest state in the country.'"
        }
      ],
      "claim_id": "ohio-count-200",
      "record_id": null,
      "topic": "Statewide count",
      "href": "/claims/ohio-count-200/",
      "id": "change-9cb8072b4f8fa1f13ee7"
    },
    {
      "date": "2026-09-11",
      "kind": "locator-changed",
      "from": "Previous locator",
      "to": "pp. 1–4 ($80 million community-payment total p. 1; $25 million announced p. 2; 'Right now it's not part of it' p. 4); extension resolution at p. 10",
      "reason": "2026-09-11: previously 'pp. 1–2; extension resolution at p. 10'.",
      "evidence_url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/12-22-25_minutes.pdf",
      "by": "DataCenterData review",
      "claim_id": "claim:coreweave-hammond:power-agreement",
      "record_id": "coreweave-hammond",
      "topic": "power agreement",
      "href": "/claims/coreweave-hammond-power-agreement/",
      "id": "change-a34c342fcc4782e667d4"
    },
    {
      "date": "2026-09-11",
      "kind": "correction",
      "from": "Previous value",
      "to": "County resolved from Licking County parcel records. County is a typed field and may not hold a sentence.",
      "reason": "County resolved from Licking County parcel records. County is a typed field and may not hold a sentence.",
      "by": "DataCenterData review",
      "claim_id": "vantage-oh1-new-albany",
      "record_id": "vantage-oh1-new-albany",
      "topic": "county",
      "href": "/ohio/#record-vantage-oh1-new-albany",
      "id": "change-a7d0bf497d14485a4439"
    },
    {
      "date": "2026-09-11",
      "kind": "locator-changed",
      "from": "Previous locator",
      "to": "pp. 1–4 ($80 million community-payment total p. 1; $25 million announced p. 2; 'Right now it's not part of it' p. 4); extension resolution at p. 10",
      "reason": "2026-09-11: previously 'pp. 1–2; extension resolution at p. 10'.",
      "evidence_url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/12-22-25_minutes.pdf",
      "by": "DataCenterData review",
      "claim_id": "claim:coreweave-hammond:incentives",
      "record_id": "coreweave-hammond",
      "topic": "incentives",
      "href": "/claims/coreweave-hammond-incentives/",
      "id": "change-af15e2db628d7df6e99e"
    },
    {
      "date": "2026-09-11",
      "kind": "locator-changed",
      "from": "Previous locator",
      "to": "pp. 3–11 (resolution 25R-16 introduced p. 3; lease, jobs, tax terms and community impact payment p. 4; NIPSCO contingency p. 6)",
      "reason": "2026-09-11: previously 'pp. 3–4'.",
      "evidence_url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/06-09-25_minutes.pdf",
      "by": "DataCenterData review",
      "claim_id": "claim:coreweave-hammond:power-agreement",
      "record_id": "coreweave-hammond",
      "topic": "power agreement",
      "href": "/claims/coreweave-hammond-power-agreement/",
      "id": "change-b4bc19b4a03e8b4299c6"
    },
    {
      "date": "2026-09-11",
      "kind": "correction",
      "from": "Previous value",
      "to": "status was 'supported-as-delivered' with value 'At least 1,000 baseline; 1,056 full-time AWS employees later reported'. The company-linked counts sit on either side of the baseline, so the reviewed record does not support a delivery conclusion.",
      "reason": "status was 'supported-as-delivered' with value 'At least 1,000 baseline; 1,056 full-time AWS employees later reported'. The company-linked counts sit on either side of the baseline, so the reviewed record does not support a delivery conclusion.",
      "by": "DataCenterData review",
      "claim_id": "aws-new-carlisle",
      "record_id": "aws-new-carlisle",
      "topic": "permanent_jobs",
      "href": "/indiana/#record-aws-new-carlisle",
      "id": "change-bc78270a14bbe9841eed"
    },
    {
      "date": "2026-09-11",
      "kind": "locator-changed",
      "from": "Previous locator",
      "to": "pp. 3–11 (resolution 25R-16 introduced p. 3; lease, jobs, tax terms and community impact payment p. 4; NIPSCO contingency p. 6)",
      "reason": "2026-09-11: previously 'pp. 3–4'.",
      "evidence_url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/06-09-25_minutes.pdf",
      "by": "DataCenterData review",
      "claim_id": "claim:coreweave-hammond:expansion-design",
      "record_id": "coreweave-hammond",
      "topic": "expansion design",
      "href": "/claims/coreweave-hammond-expansion-design/",
      "id": "change-c4b13648014d657c8069"
    },
    {
      "date": "2026-09-11",
      "kind": "locator-changed",
      "from": "Previous locator",
      "to": "pp. 3–11 (resolution 25R-16 introduced p. 3; lease, jobs, tax terms and community impact payment p. 4; NIPSCO contingency p. 6)",
      "reason": "2026-09-11: previously 'pp. 3–4'.",
      "evidence_url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/06-09-25_minutes.pdf",
      "by": "DataCenterData review",
      "claim_id": "claim:coreweave-hammond:community-impact-payments",
      "record_id": "coreweave-hammond",
      "topic": "community impact payments",
      "href": "/claims/coreweave-hammond-community-impact-payments/",
      "id": "change-c8a5e7588a21d28932f0"
    },
    {
      "date": "2026-09-11",
      "kind": "locator-changed",
      "from": "Previous locator",
      "to": "pp. 1–4 ($80 million community-payment total p. 1; $25 million announced p. 2; 'Right now it's not part of it' p. 4); extension resolution at p. 10",
      "reason": "2026-09-11: previously 'pp. 1–2; extension resolution at p. 10'.",
      "evidence_url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/12-22-25_minutes.pdf",
      "by": "DataCenterData review",
      "claim_id": "claim:coreweave-hammond:community-impact-payments",
      "record_id": "coreweave-hammond",
      "topic": "community impact payments",
      "href": "/claims/coreweave-hammond-community-impact-payments/",
      "id": "change-d4b0a3a81c6e4cc7b54f"
    },
    {
      "date": "2026-09-11",
      "kind": "correction",
      "from": "Previous value",
      "to": "status was 'Approved; construction not verified' while the only linked source was the petitioner's appendix, which shows a request rather than a decision. The verification source is now the commission's hearing results. Prior verification_url: https://indianapolis-in.municodemeetings.com/sites/indianapolis-in.municodemeetings.com/files/fileattachments/mdc_hearing_examiner/meeting/5368/2025-cap-856_2025-cvr-856_petitioner_appendix_mdc_3-18-26_final.pdf; prior verified_fields: local filing, cooling claim, cost commitment.",
      "reason": "status was 'Approved; construction not verified' while the only linked source was the petitioner's appendix, which shows a request rather than a decision. The verification source is now the commission's hearing results. Prior verification_url: https://indianapolis-in.municodemeetings.com/sites/indianapolis-in.municodemeetings.com/files/fileattachments/mdc_hearing_examiner/meeting/5368/2025-cap-856_2025-cvr-856_petitioner_appendix_mdc_3-18-26_final.pdf; prior verified_fields: local filing, cooling claim, cost commitment.",
      "by": "DataCenterData review",
      "claim_id": "sabey-indianapolis",
      "record_id": "sabey-indianapolis",
      "topic": "record",
      "href": "/indiana/#record-sabey-indianapolis",
      "id": "change-db9f224022507202340c"
    },
    {
      "date": "2026-09-11",
      "kind": "locator-changed",
      "from": "Previous locator",
      "to": "pp. 3–11 (resolution 25R-16 introduced p. 3; lease, jobs, tax terms and community impact payment p. 4; NIPSCO contingency p. 6)",
      "reason": "2026-09-11: previously 'pp. 3–4'.",
      "evidence_url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/06-09-25_minutes.pdf",
      "by": "DataCenterData review",
      "claim_id": "claim:coreweave-hammond:permanent-jobs",
      "record_id": "coreweave-hammond",
      "topic": "permanent jobs",
      "href": "/claims/coreweave-hammond-permanent-jobs/",
      "id": "change-e537c045ae58b657894b"
    },
    {
      "date": "2026-09-11",
      "kind": "correction",
      "from": "35-year state sales-tax exemption for at least $1B eligible capital, with possible extensions; local and NIPSCO incentives referenced but not yet reconciled.",
      "to": "The 2 March 2026 council minutes record unanimous adoption of Resolution R-3-2026, whose agenda title describes rescission of the 2024 Microsoft taxpayer agreement, including termination of the tax abatement. DataCenterData has not obtained the adopted resolution text and therefore does not independently state its full legal effect. IEDC showed the state DATA exemption as a pending accepted offer when checked.",
      "reason": "Primary municipal minutes record introduction and unanimous adoption of R-3-2026.",
      "evidence_url": "https://www.cityoflaporte.com/uploads/minutes/m_1932_Council-Mar.2-2026-Minutes.docx",
      "by": "DataCenterData review",
      "claim_id": "in-microsoft-la-porte-r-3-2026",
      "record_id": "microsoft-la-porte",
      "topic": "incentives_commitments",
      "href": "/indiana/#record-microsoft-la-porte",
      "source": {
        "title": "La Porte Common Council minutes, March 2, 2026",
        "url": "https://www.cityoflaporte.com/uploads/minutes/m_1932_Council-Mar.2-2026-Minutes.docx"
      },
      "id": "in-microsoft-la-porte-r-3-2026"
    },
    {
      "date": "2026-09-11",
      "kind": "correction",
      "from": "Two Indiana project registers with different IDs for the same projects (microsoft-la-porte-1 vs microsoft-la-porte; digital-crossroads-hammond vs coreweave-hammond counted as parallel eights).",
      "to": "One Indiana project file. microsoft-la-porte is canonical (alias microsoft-la-porte-1). Digital Crossroads Hammond is the campus; CoreWeave Hammond is the child expansion project; DX-1 remains the operating facility.",
      "reason": "Remove the duplicate Indiana project authority before any further state expansion.",
      "evidence_url": "/data/registry.json",
      "by": "DataCenterData review",
      "claim_id": "in-project-register-reconciliation",
      "record_id": "microsoft-la-porte",
      "topic": "stable_id",
      "href": "/indiana/#record-microsoft-la-porte",
      "source": {
        "title": "DataCenterData coherent-core registry",
        "url": "/data/registry.json"
      },
      "id": "in-project-register-reconciliation"
    },
    {
      "date": "2026-09-11",
      "kind": "correction",
      "from": "Draft Ohio data-center general NPDES permit treated as if it were a final, measured water authorization.",
      "to": "Ohio EPA said on July 21 it would not finalize draft OHD000001 and would continue with individual NPDES permits. A draft permit is not measured discharge.",
      "reason": "Stable public citation for the agency's July 21 notice.",
      "evidence_url": "https://www.clermontsun.com/2026/07/22/ohio-epa-will-not-finalize-proposed-data-center-general-permit",
      "by": "DataCenterData review",
      "claim_id": "ohio-water-permit",
      "record_id": null,
      "topic": "ohio-claim-checks.json:ohio-water-permit",
      "href": "/changes/",
      "source": {
        "title": "Ohio EPA will not finalize proposed data-center general permit (agency notice republished by The Clermont Sun)",
        "url": "https://www.clermontsun.com/2026/07/22/ohio-epa-will-not-finalize-proposed-data-center-general-permit"
      },
      "id": "oh-epa-general-permit-withdrawal"
    },
    {
      "date": "2026-09-11",
      "kind": "correction",
      "from": "Unknown pending parcel resolution",
      "to": "Licking",
      "reason": "County GIS parcels resolve the three campus counties. County is a typed field and may not hold a sentence.",
      "evidence_url": "https://gis.lickingcounty.gov/server/rest/services/Auditor/ParcelsSearch/FeatureServer/0",
      "by": "DataCenterData review",
      "claim_id": "oh-new-albany-campus-counties",
      "record_id": "google-new-albany-oh",
      "topic": "county",
      "href": "/ohio/#record-google-new-albany-oh",
      "source": {
        "title": "Licking County parcel records for Google, Meta and Vantage OH1 New Albany campuses",
        "url": "https://gis.lickingcounty.gov/server/rest/services/Auditor/ParcelsSearch/FeatureServer/0"
      },
      "id": "oh-new-albany-campus-counties"
    }
  ],
  "publication": {
    "license": null,
    "reuse_scope": "reference only unless a record is explicitly rights-cleared",
    "rights_manifest": "/data/rights-manifest.json"
  }
}
