  "claim_ids": [
    "indiana-count-60",
    "aws-campus-complete",
    "meta-lebanon-current-gw",
    "meta-closed-loop-zero-water",
    "hammond-facility-closed",
    "microsoft-laporte-jobs-now",
    "meta-jeffersonville-job-unit",
    "sabey-cost-allocation-generalized"
  ],
  "migration_note": "Claims live only in claims.json; the legacy public download is a generated filtered projection.",
  "claims": [
    {
      "id": "indiana-count-60",
      "record_id": null,
      "topic": "Statewide count",
      "state": "IN",
      "kind": "tested-reading",
      "claim": "Treating CAC's queue of roughly 60 proposed hyperscale projects as 60 operating physical buildings.",
      "claimant": {
        "name": null,
        "role": "common-reading",
        "said_on": null,
        "said_where": null
      },
      "unit_scope": {
        "unit": "Statewide count",
        "scope": "Indiana",
        "period": "None recorded"
      },
      "supports": "Citizens Action Coalition says approximately 60 large hyperscale data centers were proposed over two years and that only several are operating. Its public index is a useful proposal-discovery queue, including 18 entries it labels withdrawn—not a verified count of operating physical buildings. DataCenterData cites the queue but does not adopt it as a statewide facility total.",
      "unknown": "Independently reconstructed statewide operating-facility count.",
      "counterevidence": [],
      "verdict": "Contradicted",
      "confidence": {
        "level": "medium",
        "basis": "Institution; Institution"
      },
      "sources": [
        {
          "title": "Citizens Action Coalition Indiana data-center map",
          "publisher": "Citizens Action Coalition",
          "class": "Institution",
          "published": "",
          "retrieved": "2026-09-10",
          "url": "https://www.citact.org/ai-data-centers",
          "locator": "https://www.citact.org/ai-data-centers",
          "supports": "CAC presents a proposal-discovery queue of roughly 60 hyperscale entries, including withdrawn labels; not a verified operating-building census."
        }
      ],
      "last_checked": "2026-09-10",
      "next_check": {
        "trigger": "None recorded",
        "date": null
      },
      "history": [],
      "entity_ids": [],
      "href": "/claims/indiana-count-60/",
      "related_pages": [
        {
          "title": "DataCenterData Indiana coverage boundary",
          "url": "/indiana/#coverage"
        }
      ]
    },
    {
      "id": "aws-campus-complete",
      "record_id": "aws-new-carlisle",
      "topic": "Project status",
      "state": "IN",
      "kind": "tested-reading",
      "claim": "Treating AWS Project Rainier's operation as proof that the full New Carlisle campus is complete.",
      "claimant": {
        "name": null,
        "role": "common-reading",
        "said_on": null,
        "said_where": null
      },
      "unit_scope": {
        "unit": "Project status",
        "scope": "Indiana",
        "period": "None recorded"
      },
      "supports": "Amazon says its multi-site Project Rainier compute cluster is operational and identifies New Carlisle as one site. That supports an operating milestone, not completion of every planned New Carlisle building or the full announced investment scope.",
      "unknown": "The remaining New Carlisle building count, buildout schedule and full-campus completion milestone are not established in the reviewed source.",
      "counterevidence": [],
      "verdict": "Unknown",
      "confidence": {
        "level": "medium",
        "basis": "Company; Institution"
      },
      "sources": [
        {
          "title": "Amazon Project Rainier operating update",
          "publisher": "",
          "class": "Company",
          "published": "",
          "retrieved": "2026-09-12",
          "url": "https://www.aboutamazon.com/news/aws/aws-project-rainier-ai-trainium-chips-compute-cluster",
          "locator": "Opening summary and the sections “A mountain of compute” and “Sustainability at scale”",
          "supports": "Amazon describes Project Rainier as operational across multiple U.S. data centers and identifies St. Joseph County as one Project Rainier site; it does not say every planned New Carlisle building or the full campus is complete."
        }
      ],
      "last_checked": "2026-09-12",
      "next_check": {
        "trigger": "None recorded",
        "date": null
      },
      "history": [
        {
          "date": "2026-09-12",
          "kind": "verdict-changed",
          "from": "Partially supported",
          "to": "Not independently verified",
          "reason": "The operating Project Rainier milestone does not establish completion of every planned New Carlisle building or the full campus.",
          "by": "Software-assisted second check"
        },
        {
          "date": "2026-09-14",
          "kind": "verdict-changed",
          "from": "Not independently verified",
          "to": "Unknown",
          "reason": "This card tests a common inference, not an attributed outside statement. The operating milestone still does not establish completion of every planned building or the full campus.",
          "by": "Editorial classification update"
        }
      ],
      "entity_ids": [
        "aws-new-carlisle"
      ],
      "href": "/claims/aws-campus-complete/",
      "related_pages": [
        {
          "title": "DataCenterData AWS New Carlisle ledger",
          "url": "/projects/aws-new-carlisle/"
        }
      ]
    },
    {
      "id": "meta-lebanon-current-gw",
      "record_id": "meta-lebanon",
      "topic": "Power / timing",
      "state": "IN",
      "kind": "tested-reading",
      "claim": "Reading Meta Lebanon's 1 GW design as current measured grid demand.",
      "claimant": {
        "name": null,
        "role": "common-reading",
        "said_on": null,
        "said_where": null
      },
      "unit_scope": {
        "unit": "Power / timing",
        "scope": "Indiana",
        "period": "None recorded"
      },
      "supports": "Meta describes a 1 GW campus and reported a February 2026 groundbreaking. The reviewed sources do not establish current metered load, a completed buildout or a comparable utility-service commitment.",
      "unknown": "None recorded",
      "counterevidence": [],
      "verdict": "Contradicted",
      "confidence": {
        "level": "medium",
        "basis": "Company; Institution"
      },
      "sources": [
        {
          "title": "Meta Lebanon groundbreaking announcement",
          "publisher": "",
          "class": "Company",
          "published": "",
          "retrieved": "2026-09-11",
          "url": "https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/",
          "locator": "https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/",
          "supports": ""
        }
      ],
      "last_checked": "2026-09-11",
      "next_check": {
        "trigger": "None recorded",
        "date": null
      },
      "history": [],
      "entity_ids": [
        "meta-lebanon"
      ],
      "href": "/claims/meta-lebanon-current-gw/",
      "related_pages": [
        {
          "title": "DataCenterData Meta Lebanon ledger",
          "url": "/projects/meta-lebanon/"
        }
      ]
    },
    {
      "id": "meta-closed-loop-zero-water",
      "record_id": "meta-lebanon",
      "topic": "Water / cooling",
      "state": "IN",
      "kind": "tested-reading",
      "claim": "Closed-loop liquid cooling means the Meta Lebanon campus will use no water.",
      "claimant": {
        "name": null,
        "role": "common-reading",
        "said_on": null,
        "said_where": null
      },
      "unit_scope": {
        "unit": "cooling-water design versus total campus water use",
        "scope": "Meta Lebanon campus, Indiana",
        "period": "future operation; completion date not established"
      },
      "supports": "Meta says the design will recirculate cooling water and use zero water for a majority of the year. That is narrower than zero annual or total campus water use and remains a future design claim until operating measurements exist.",
      "unknown": "Actual annual withdrawal and consumption, potable and nonpotable shares, the heat-rejection architecture used in operation, and operating measurements.",
      "counterevidence": [],
      "verdict": "Unknown",
      "confidence": {
        "level": "medium",
        "basis": "Meta company design statement; no operating measurements."
      },
      "sources": [
        {
          "title": "Meta Lebanon cooling description",
          "publisher": "Meta",
          "class": "Company",
          "published": "2026-02-11",
          "retrieved": "2026-09-14",
          "url": "https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/",
          "locator": "Prioritizing Sustainability, first paragraph",
          "supports": "Meta says the future design will recirculate cooling water and use zero water for a majority of the year. It does not say zero annual campus water use."
        }
      ],
      "last_checked": "2026-09-14",
      "next_check": {
        "trigger": "Operating water withdrawal, consumption or utility records after the campus begins service",
        "date": null
      },
      "history": [
        {
          "date": "2026-09-12",
          "kind": "verdict-changed",
          "from": "Partially supported; unknowns not recorded",
          "to": "Not independently verified; operating water unknowns and the future design scope are explicit",
          "reason": "The second review found that a literal zero-water conclusion is not established by Meta's narrower future design statement.",
          "by": "Software-assisted second check"
        },
        {
          "date": "2026-09-14",
          "kind": "verdict-changed",
          "from": "Not independently verified",
          "to": "Unknown",
          "reason": "The prior label is defined for an unverified statement by a non-company party. This card tests a common inference instead; the reviewed company source does not establish annual or total campus water use.",
          "by": "Editorial classification update"
        }
      ],
      "entity_ids": [
        "meta-lebanon"
      ],
      "href": "/claims/meta-closed-loop-zero-water/",
      "review_status": "second_review_complete",
      "reviewed_at": "2026-09-14",
      "related_pages": [
        {
          "title": "DataCenterData cooling and water definitions",
          "url": "/water/"
        }
      ],
      "review_note": "Software-assisted second check; every cited source was re-read by a reviewer who did not author the record."
    },
    {
      "id": "hammond-facility-closed",
      "record_id": "digital-crossroads-hammond",
      "topic": "Entity / lifecycle",
      "state": "IN",
      "kind": "tested-reading",
      "claim": "The expiration of Hammond's CoreWeave agreement means the existing Digital Crossroad data center closed.",
      "claimant": {
        "name": null,
        "role": "common-reading",
        "said_on": null,
        "said_where": null
      },
      "unit_scope": {
        "unit": "Entity / lifecycle",
        "scope": "Indiana",
        "period": "None recorded"
      },
      "supports": "Hammond says the separate agreement for the proposed 301 Digital Crossroads expansion expired. City records identify CoreWeave as an existing tenant at the operating 100 Digital Crossroads facility. The failed expansion and existing DX-1 site are not the same lifecycle event.",
      "unknown": "None recorded",
      "counterevidence": [],
      "verdict": "Contradicted",
      "confidence": {
        "level": "medium",
        "basis": "Gov. record; Gov. record"
      },
      "sources": [
        {
          "title": "City of Hammond agreement-expiration notice",
          "publisher": "",
          "class": "Gov. record",
          "published": "",
          "retrieved": "2026-09-11",
          "url": "https://www.gohammond.com/hammond-announces-expiration-of-data-center-development-agreement/",
          "locator": "https://www.gohammond.com/hammond-announces-expiration-of-data-center-development-agreement/",
          "supports": ""
        },
        {
          "title": "Hammond Common Council minutes",
          "publisher": "",
          "class": "Gov. record",
          "published": "",
          "retrieved": "2026-09-11",
          "url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/06-09-25_minutes.pdf",
          "locator": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/06-09-25_minutes.pdf",
          "supports": ""
        }
      ],
      "last_checked": "2026-09-11",
      "next_check": {
        "trigger": "None recorded",
        "date": null
      },
      "history": [],
      "entity_ids": [
        "digital-crossroads-hammond",
        "coreweave-hammond",
        "digital-crossroad-dx1"
      ],
      "href": "/claims/hammond-facility-closed/"
    },
    {
      "id": "microsoft-laporte-jobs-now",
      "record_id": "microsoft-la-porte",
      "topic": "Jobs / timing",
      "state": "IN",
      "kind": "tested-reading",
      "claim": "Microsoft La Porte already has more than 600 permanent Microsoft jobs.",
      "claimant": {
        "name": null,
        "role": "common-reading",
        "said_on": null,
        "said_where": null
      },
      "unit_scope": {
        "unit": "Jobs / timing",
        "scope": "Indiana",
        "period": "None recorded"
      },
      "supports": "Microsoft's 2026 groundbreaking update projects more than 600 permanent jobs in the first phase but gives no due date for that forecast. Indiana's 2024 announcement separately projected up to 200 jobs by the end of 2032. Neither announcement establishes current employment, and the two scopes have not been reconciled.",
      "unknown": "Observed employment; whether the 200-by-2032 and 600+ first-phase figures describe the same scope.",
      "counterevidence": [],
      "verdict": "Contradicted",
      "confidence": {
        "level": "medium",
        "basis": "Company; Gov. record"
      },
      "sources": [
        {
          "title": "Microsoft La Porte groundbreaking update",
          "publisher": "Microsoft",
          "class": "Company",
          "published": "",
          "retrieved": "2026-09-12",
          "url": "https://local.microsoft.com/blog/microsoft-breaks-ground-on-la-porte-datacenter-project/",
          "locator": "Opening paragraph and paragraph beginning 'Beyond the thousands of construction jobs'",
          "supports": "Microsoft projects more than 600 permanent first-phase jobs; it does not report observed employment or a due date for the forecast."
        },
        {
          "title": "Indiana's 2024 Microsoft announcement",
          "publisher": "Indiana Economic Development Corporation",
          "class": "Gov. record",
          "published": "",
          "retrieved": "2026-09-12",
          "url": "https://iedc.in.gov/events/news/details/2024/06/04/gov-holcomb-announces-plans-for-new-1b-microsoft-data-center-in-northwest-indiana",
          "locator": "Body dateline June 3, 2024 and opening paragraph; URL path is dated June 4",
          "supports": "State announcement projects up to 200 jobs by the end of 2032. It is not an employment or payroll record."
        }
      ],
      "last_checked": "2026-09-12",
      "next_check": {
        "trigger": "First-phase completion notice or a payroll record",
        "date": null
      },
      "history": [
        {
          "date": "2026-09-12",
          "kind": "verdict-changed",
          "from": "Not yet due",
          "to": "Not independently verified",
          "reason": "The 600-plus first-phase forecast has no retrieved due date; the 2032 date belongs to a different 200-job scope.",
          "by": "Software-assisted second check"
        },
        {
          "date": "2026-09-14",
          "kind": "verdict-changed",
          "from": "Not independently verified",
          "to": "Contradicted",
          "reason": "The claim says the projected jobs already exist, while the cited company source still describes a forecast and the government source describes a different job scope.",
          "by": "Editorial classification update"
        }
      ],
      "entity_ids": [
        "microsoft-la-porte"
      ],
      "href": "/claims/microsoft-laporte-jobs-now/",
      "review_status": "second_review_complete",
      "reviewed_at": "2026-09-12",
      "review_note": "Software-assisted second check; every cited source was re-read by a reviewer who did not author the record."
    },
    {
      "id": "meta-jeffersonville-job-unit",
      "record_id": "meta-jeffersonville",
      "topic": "Jobs / unit",
      "state": "IN",
      "kind": "tested-reading",
      "claim": "Meta Jeffersonville's hundreds of construction jobs are hundreds of permanent operating jobs.",
      "claimant": {
        "name": null,
        "role": "common-reading",
        "said_on": null,
        "said_where": null
      },
      "unit_scope": {
        "unit": "Jobs / unit",
        "scope": "Indiana",
        "period": "None recorded"
      },
      "supports": "Indiana's project announcement separates approximately 100 operational jobs from hundreds of construction jobs. Neither category is treated as observed until employment evidence and the relevant due date are established.",
      "unknown": "None recorded",
      "counterevidence": [],
      "verdict": "Contradicted",
      "confidence": {
        "level": "medium",
        "basis": "Gov. record; Institution"
      },
      "sources": [
        {
          "title": "Indiana Meta Jeffersonville announcement",
          "publisher": "",
          "class": "Gov. record",
          "published": "",
          "retrieved": "2026-09-11",
          "url": "https://iedc.in.gov/events/news/details/2024/01/25/gov.-holcomb-announces-meta-to-build-an-800m-data-center-campus-in-indiana",
          "locator": "https://iedc.in.gov/events/news/details/2024/01/25/gov.-holcomb-announces-meta-to-build-an-800m-data-center-campus-in-indiana",
          "supports": ""
        }
      ],
      "last_checked": "2026-09-11",
      "next_check": {
        "trigger": "None recorded",
        "date": null
      },
      "history": [],
      "entity_ids": [
        "meta-jeffersonville"
      ],
      "href": "/claims/meta-jeffersonville-job-unit/",
      "related_pages": [
        {
          "title": "DataCenterData Indiana project index",
          "url": "/indiana/#projects"
        }
      ]
    },
    {
      "id": "sabey-cost-allocation-generalized",
      "record_id": "sabey-indianapolis",
      "topic": "Power / cost allocation",
      "state": "IN",
      "kind": "tested-reading",
      "claim": "One Indianapolis developer cost commitment proves no Indiana data center can affect other customers' electricity costs.",
      "claimant": {
        "name": null,
        "role": "common-reading",
        "said_on": null,
        "said_where": null
      },
      "unit_scope": {
        "unit": "Power / cost allocation",
        "scope": "Indiana",
        "period": "None recorded"
      },
      "supports": "The reviewed Indianapolis filing says Sabey will pay costs related to the project's substation, generation, transmission and distribution needs. That is meaningful site-specific evidence; it does not establish every tariff, wholesale-market effect or project in Indiana.",
      "unknown": "Effects outside the reviewed site-specific commitment, including other tariffs, projects and wholesale-market costs, are not established here.",
      "counterevidence": [],
      "verdict": "Partially supported",
      "confidence": {
        "level": "medium",
        "basis": "Gov. record; Institution"
      },
      "sources": [
        {
          "title": "Indianapolis petitioner appendix, cases 2025-CAP-856 / 2025-CVR-856",
          "publisher": "",
          "class": "Gov. record",
          "published": "",
          "retrieved": "2026-09-12",
          "url": "https://indianapolis-in.municodemeetings.com/sites/indianapolis-in.municodemeetings.com/files/fileattachments/mdc_hearing_examiner/meeting/5368/2025-cap-856_2025-cvr-856_petitioner_appendix_mdc_3-18-26_final.pdf",
          "locator": "Petitioner presentation, PDF pages 24–25, commitment concerning the proposed substation and energy needs",
          "supports": "The petitioner describes a commitment to pay costs related to the proposed substation and the site's energy needs; that site-specific statement does not establish statewide cost effects for every data center."
        }
      ],
      "last_checked": "2026-09-12",
      "next_check": {
        "trigger": "None recorded",
        "date": null
      },
      "history": [
        {
          "date": "2026-09-12",
          "kind": "verdict-changed",
          "from": "Partially supported",
          "to": "Not independently verified",
          "reason": "One site's cost commitment cannot establish the statewide claim shown.",
          "by": "Software-assisted second check"
        },
        {
          "date": "2026-09-14",
          "kind": "verdict-changed",
          "from": "Not independently verified",
          "to": "Partially supported",
          "reason": "The cited commitment supports cost allocation for one site, but it cannot establish the statewide generalization shown.",
          "by": "Editorial classification update"
        }
      ],
      "entity_ids": [
        "sabey-indianapolis"
      ],
      "href": "/claims/sabey-cost-allocation-generalized/",
      "related_pages": [
        {
          "title": "DataCenterData Indiana project index",
          "url": "/indiana/#projects"
        }
      ]
    }
  ],
  "publication": {
    "license": null,
    "reuse_scope": "reference only unless a record is explicitly rights-cleared",
    "rights_manifest": "/data/rights-manifest.json"
  }
}