  "schema_version": "0.1",
  "last_reviewed": "2026-09-19",
  "coverage": "Bounded records selected from the national draft after a second primary-source extraction. This is not a census and does not make state coverage complete.",
  "publication": {
    "kind": "projects",
    "record_key": "projects",
    "multi_state": true,
    "license": null,
    "reuse_scope": "reference only unless a record is explicitly rights-cleared",
    "rights_manifest": "/data/rights-manifest.json"
  },
  "projects": [
    {
      "stable_id": "vantage-lighthouse-port-washington",
      "parent_id": null,
      "record_unit": "campus",
      "current_name": "Vantage Lighthouse Campus",
      "state": "WI",
      "city": "Port Washington",
      "county": "Ozaukee",
      "developer": "Vantage Data Centers",
      "operator": null,
      "lifecycle_status": "construction",
      "status_basis": "Wisconsin DNR's project page, rechecked September 13, 2026, describes the Lighthouse campus as under construction. Its June 12 air-permit issuance concerns emergency generators and does not establish campus operation.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "campus",
        "aggregation_allowed": false
      },
      "location": {
        "address": null,
        "city": "Port Washington",
        "county": "Ozaukee",
        "precision": "approximate",
        "note": "DNR facility 246185280 locates the site east of Ozaukee Trail, south of Dixie Road/County Highway P and west of I-43. No street address or parcel crosswalk is established here."
      },
      "physical_scale": "DNR describes a 672-acre construction campus. This is land area, not a building count.",
      "sources": [
        {
          "title": "Port Washington Data Center Proposal",
          "url": "https://dnr.wisconsin.gov/topic/EIA/Portwashington.html",
          "type": "state environmental project page",
          "published": null,
          "retrieved": "2026-09-13",
          "locator": "Opening paragraph; Required Permits and Approvals / Air Permit Applications",
          "supports": "Campus identity, developer, city, county, construction status and land area; June 12, 2026 permit event.",
          "source_type": "government"
        },
        {
          "title": "Wisconsin DNR permit tracking: facility 246185280 Vantage WI-1",
          "url": "https://apps.dnr.wi.gov/warp_ext/AM_PermitTracking2.aspx?id=38402",
          "type": "air-permit facility record",
          "published": null,
          "retrieved": "2026-09-13",
          "locator": "Facility Information; Site Description; permit rows 24618528A-F01 and 25-MIN-094",
          "supports": "Bounded site location and active emergency-generator permit records; no operating-campus finding.",
          "source_type": "permit"
        }
      ],
      "confidence": "high",
      "missing_evidence": [
        "street address",
        "parcel crosswalk",
        "operator",
        "critical IT capacity",
        "utility service capacity",
        "opening date",
        "relationship to Oracle E. Lake Drive tax-certification records"
      ],
      "history": [
        {
          "date": "2026-06-12",
          "summary": "DNR records issuance of construction permit 25-MIN-094 and initial operation permit 24618528A-F01 for emergency generators; campus operating status is not established."
        },
        {
          "date": "2026-09-12",
          "field": "publication",
          "summary": "Added as a bounded construction-stage campus record after a second review of the cited Wisconsin DNR sources."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "qts-eagle-mountain-campus",
      "parent_id": null,
      "record_unit": "campus",
      "current_name": "QTS Eagle Mountain Campus",
      "state": "UT",
      "city": "Eagle Mountain",
      "county": "Utah",
      "developer": "QTS",
      "operator": null,
      "lifecycle_status": "construction",
      "status_basis": "Eagle Mountain City's April 20, 2026 update documents the first building's structural topping-out on April 17 and says interior and remaining-campus construction will continue. This establishes a construction milestone, not an opening.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "campus",
        "aggregation_allowed": false
      },
      "location": {
        "address": null,
        "city": "Eagle Mountain",
        "county": "Utah",
        "precision": "approximate",
        "note": "City updates place this campus west of Meta. The 2024 RDA packet's Sweetwater #3 plan lists the historical QTS I/II parcels in Utah County; current parcel and street-address reconciliation remains open."
      },
      "physical_scale": "The April 2026 city update describes five planned first-phase buildings on approximately 193 acres; it does not establish five operating buildings.",
      "sources": [
        {
          "title": "Eagle Mountain City Celebrates Major Milestone with QTS Topping Out Ceremony",
          "url": "https://eaglemountain.gov/eagle-mountain-city-celebrates-major-milestone-with-qts-topping-out-ceremony/",
          "type": "municipal construction update",
          "published": "2026-04-20",
          "retrieved": "2026-09-13",
          "locator": "Article body, opening two paragraphs and final paragraph",
          "supports": "April 17 structural milestone, continuing construction and planned first-phase scale.",
          "source_type": "government"
        },
        {
          "title": "Construction restarts on QTS Data Center in Eagle Mountain",
          "url": "https://eaglemountain.gov/construction-restarts-on-qts-data-center-in-eagle-mountain/",
          "type": "municipal construction update",
          "published": "2025-10-29",
          "retrieved": "2026-09-13",
          "locator": "Article body, opening two paragraphs and construction-resumption paragraph",
          "supports": "QTS developer identity, campus west of Meta and resumed construction.",
          "source_type": "government"
        },
        {
          "title": "Eagle Mountain Redevelopment Agency August 20, 2024 meeting packet",
          "url": "https://www.utah.gov/pmn/files/1158232.pdf",
          "type": "municipal meeting packet containing proposed agreement and attached project-area plan",
          "published": "2024-08-15",
          "retrieved": "2026-09-12",
          "locator": "PDF p. 75 / printed p. 6, Amended Sweetwater Industrial Park CRA #3 plan, Table 1 and boundary description; packet cover posting certificate",
          "supports": "Historical QTS I/II parcel grouping, county and location context only. The packet is not proof that a proposed agreement was executed.",
          "source_type": "government"
        }
      ],
      "confidence": "high",
      "missing_evidence": [
        "current street address",
        "current parcel crosswalk",
        "operator",
        "critical IT capacity",
        "utility service capacity",
        "opening date",
        "relationship to other QTS Eagle Mountain/Fairfield and North Virtual Drive projects"
      ],
      "history": [
        {
          "date": "2025-10-29",
          "summary": "City reported that campus construction had resumed."
        },
        {
          "date": "2026-04-17",
          "summary": "City subsequently documented structural topping-out of the first building; additional construction remained."
        },
        {
          "date": "2026-09-12",
          "field": "publication",
          "summary": "Added as a bounded construction-stage campus record after a second review of the cited Eagle Mountain City sources."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "project-jupiter-santa-teresa",
      "parent_id": null,
      "record_unit": "campus",
      "current_name": "Project Jupiter",
      "state": "NM",
      "city": null,
      "county": "Doña Ana",
      "developer": "STACK Infrastructure and BorderPlex Digital Assets",
      "operator": null,
      "lifecycle_status": "construction",
      "status_basis": "Doña Ana County's April 14, 2026 update describes the data-center campus as under construction in the Santa Teresa Industrial Park. No reviewed source establishes operation.",
      "capacity": {
        "value": 2462,
        "unit": "MW",
        "kind": "onsite_generation_planned",
        "scope": "site",
        "aggregation_allowed": false,
        "note": "Requested YGI Microgrid generation in a pending air-permit application; not critical IT load, utility demand or issued capacity."
      },
      "location": {
        "address": null,
        "city": null,
        "county": "Doña Ana",
        "precision": "approximate",
        "note": "Santa Teresa Industrial Park in unincorporated Doña Ana County; no primary-source parcel or campus coordinate established."
      },
      "physical_scale": "Four anticipated data-center facilities in Ordinance 367-2025.",
      "sources": [
        {
          "title": "Doña Ana County Ordinance No. 367-2025",
          "url": "https://www.donaana.gov/Documents/About%20Us/Economic%20Development%20Projects/Ordinance%20No.%20367-2025%20IRB%20Adoption_Executed%26Recorded.pdf",
          "type": "executed and recorded industrial-revenue-bond ordinance",
          "published": "2025-09-22",
          "retrieved": "2026-09-12",
          "locator": "Recorded p. 1, lines 5-25; Instrument 2520581",
          "supports": "Project identity, county and four anticipated facilities.",
          "source_type": "government"
        },
        {
          "title": "Doña Ana County Project Jupiter update",
          "url": "https://www.donaana.gov/news_detail_T7_R102.php",
          "type": "county project update",
          "published": "2026-04-14",
          "retrieved": "2026-09-12",
          "locator": "Opening project-description paragraph",
          "supports": "Construction status and Santa Teresa Industrial Park location.",
          "source_type": "government"
        },
        {
          "title": "NMED amended hearing notice, AQB 26-57(P), NSR 10883",
          "url": "https://www.env.nm.gov/opf/wp-content/uploads/sites/13/2026/07/2026-08-12-AQB-26-57-Amended-Notice-of-Hearing-English-filed.pdf",
          "type": "pending air-permit hearing notice",
          "published": "2026-08-12",
          "retrieved": "2026-09-12",
          "locator": "p. 1, Brief Description of Permit Application",
          "supports": "Related microgrid applicant, proposed generation capacity and location; not an issued permit.",
          "source_type": "permit"
        }
      ],
      "confidence": "high",
      "missing_evidence": [
        "street address",
        "parcel",
        "owner",
        "operator",
        "critical IT capacity",
        "utility service capacity",
        "issued microgrid permit"
      ],
      "history": [
        {
          "date": "2025-09-22",
          "summary": "County recorded Ordinance 367-2025."
        },
        {
          "date": "2026-04-14",
          "summary": "County described the campus as under construction."
        },
        {
          "date": "2026-08-12",
          "summary": "NMED noticed a hearing on the pending 2,462 MW generation application."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "project-mitten-saline-township",
      "parent_id": null,
      "record_unit": "campus",
      "current_name": "Project Mitten",
      "state": "MI",
      "city": "Saline Township",
      "county": "Washtenaw",
      "developer": "RD Michigan Property Owner I LLC",
      "operator": null,
      "lifecycle_status": "construction",
      "status_basis": "Saline Township's March 18, 2026 update says Compute 1 pylons were finished and utility and foundation work was underway.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "campus",
        "aggregation_allowed": false
      },
      "location": {
        "address": null,
        "city": "Saline Township",
        "county": "Washtenaw",
        "precision": "approximate",
        "note": "Approximately 575 acres on the north side of US-12."
      },
      "physical_scale": "Consent-judgment property: approximately 575 acres; site-plan narrative describes three planned compute buildings of about 550,000 square feet each.",
      "sources": [
        {
          "title": "Consent Judgment, RD Michigan Property Owner I LLC v. Saline Township",
          "url": "https://salinetownship.org/uploads/notices/SalineDataCenterConsentJudgmentFinalExecutionCopy492124804975v1.pdf",
          "type": "court consent judgment",
          "published": "2025-10-15",
          "retrieved": "2026-09-12",
          "locator": "Findings 1(a), 1(h)-1(r); sections 2, 4-5; Exhibit B",
          "supports": "Developer, location, site acreage, planned buildings and approval history.",
          "source_type": "government"
        },
        {
          "title": "Saline Township Data Center Update",
          "url": "http://salinetownship.org/data-center-update",
          "type": "township construction update",
          "published": null,
          "retrieved": "2026-09-12",
          "locator": "March 18, 2026 Advisory Committee entry and subsequent construction entries",
          "supports": "Active foundation, utility and later water, sanitary and stormwater work.",
          "source_type": "government"
        }
      ],
      "confidence": "high",
      "missing_evidence": [
        "street address",
        "parcel crosswalk",
        "owner",
        "operator or tenant",
        "critical IT capacity",
        "utility service capacity",
        "opening date"
      ],
      "history": [
        {
          "date": "2025-09-10",
          "summary": "Township Board denied conditional rezoning."
        },
        {
          "date": "2025-10-15",
          "summary": "Consent judgment approved zoning and specified site work subject to other permits."
        },
        {
          "date": "2026-03-18",
          "summary": "Township documented active construction."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "project-cannoli-van-buren-township",
      "parent_id": null,
      "record_unit": "project",
      "current_name": "Project Cannoli",
      "state": "MI",
      "city": "Van Buren Township",
      "county": "Wayne",
      "developer": "PDC VBT, LLC",
      "operator": null,
      "lifecycle_status": "approved",
      "status_basis": "A May 19, 2026 development agreement records preliminary site-plan approvals and expressly says final site-plan approval had not yet been obtained.",
      "capacity": {
        "value": 1000,
        "unit": "MW",
        "kind": "utility_request",
        "scope": "campus",
        "aggregation_allowed": false,
        "note": "Maximum contract/load capacity in DTE testimony; not measured load, IT capacity or generation."
      },
      "location": {
        "address": null,
        "city": "Van Buren Township",
        "county": "Wayne",
        "precision": "approximate",
        "note": "East of Haggerty Road, north of the I-94 Service Drive, west of Hannan Road and south of I-275."
      },
      "physical_scale": "282.2 acres; agreement describes three planned data-center buildings, with Building 3 deferred to a future phase.",
      "sources": [
        {
          "title": "Van Buren Township Data Center FAQ — Project Cannoli",
          "url": "https://vbtmi.gov/departments/municipal_services/data_center_faq.php",
          "type": "township project page",
          "published": null,
          "retrieved": "2026-09-12",
          "locator": "Opening description; items 16 and 25",
          "supports": "Project identity, location and source-document crosswalk.",
          "source_type": "government"
        },
        {
          "title": "Development Agreement between PDC VBT, LLC and Van Buren Township",
          "url": "https://vbtmi.gov/Document_Center/Department/Municipal%20Services/Development%20Agreement%20VBT%202026.05.20%20final.pdf",
          "type": "executed development agreement",
          "published": "2026-05-19",
          "retrieved": "2026-09-12",
          "locator": "Recitals A-F; sections 1.1-1.2, 2.1.2, 2.2 and 6.2; Exhibit A",
          "supports": "Developer, project area, planned buildings, preliminary approvals and missing final approval.",
          "source_type": "government"
        },
        {
          "title": "DTE testimony, MPSC Case U-22058",
          "url": "https://mi-psc.my.site.com/sfc/servlet.shepherd/version/download/068cs00001pUwYcAAK",
          "type": "utility-commission filing",
          "published": "2026-03-17",
          "retrieved": "2026-09-12",
          "locator": "NTF-8 to NTF-9, Q15-Q17",
          "supports": "Google customer identity in the utility contract and 1,000 MW maximum load/contract capacity; not operator status.",
          "source_type": "docket"
        }
      ],
      "confidence": "high",
      "missing_evidence": [
        "street address",
        "parcel",
        "owner",
        "operator",
        "final site-plan approval",
        "construction start",
        "critical IT capacity",
        "MPSC final disposition"
      ],
      "history": [
        {
          "date": "2026-02-11",
          "summary": "First preliminary site plan approved."
        },
        {
          "date": "2026-05-13",
          "summary": "Subsequent preliminary site plan approved."
        },
        {
          "date": "2026-05-19",
          "summary": "Development agreement executed; final site-plan approval remained outstanding."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "stack-svy03a-hayward",
      "parent_id": null,
      "record_unit": "campus",
      "current_name": "STACK SVY03A Data Center Campus",
      "state": "CA",
      "city": "Hayward",
      "county": "Alameda",
      "developer": "STACK Infrastructure",
      "operator": null,
      "lifecycle_status": "construction",
      "status_basis": "Hayward lists STACK SVY03A as under construction and records Planning Commission approval of SPR-23-0036 on May 22, 2025 with no appeal.",
      "capacity": {
        "value": 76.6,
        "unit": "MW",
        "kind": "onsite_generation_planned",
        "scope": "campus",
        "aggregation_allowed": false,
        "qualifier": "up to",
        "note": "Proposed emergency backup-generation capacity in the CEC exemption record; not an issued air permit, IT capacity or utility load."
      },
      "location": {
        "address": "26203 Production Avenue, Hayward, CA",
        "city": "Hayward",
        "county": "Alameda",
        "precision": "exact",
        "note": "Parcels 461-0085-016-00 and 461-0085-052-01."
      },
      "physical_scale": "11.3 acres and two planned data-center buildings.",
      "sources": [
        {
          "title": "California Energy Commission — STACK SVY03A, Docket 23-SPPE-01",
          "url": "https://www.energy.ca.gov/powerplant/backup-generating-system/stack-svy03a-data-center-campus",
          "type": "state energy project docket page",
          "published": null,
          "retrieved": "2026-09-12",
          "locator": "Project summary and Project Description",
          "supports": "Project owner, address, planned buildings and backup-generation capacity.",
          "source_type": "docket"
        },
        {
          "title": "CEQAnet SCH 2025030999 — SVY03A",
          "url": "https://ceqanet.lci.ca.gov/2025030999",
          "type": "state environmental review record",
          "published": "2025-03-24",
          "retrieved": "2026-09-12",
          "locator": "Document Description and Location",
          "supports": "Applicant, city, county, acreage, parcels and earlier 67.2 MW generation figure.",
          "source_type": "government"
        },
        {
          "title": "City of Hayward Data Center Development Applications",
          "url": "https://www.hayward-ca.gov/business/for-developers/data-center-development-applications",
          "type": "municipal application and status page",
          "published": null,
          "retrieved": "2026-09-12",
          "locator": "FAQ: Are there currently data centers in Hayward? — STACK SVY03A",
          "supports": "Construction status, planning approval and current generation figure.",
          "source_type": "government"
        }
      ],
      "confidence": "high",
      "missing_evidence": [
        "operator or tenant",
        "critical IT capacity",
        "utility service capacity",
        "completion and energization dates"
      ],
      "history": [
        {
          "date": "2025-03-24",
          "summary": "CEQAnet described 67.2 MW of emergency generation."
        },
        {
          "date": "2025-05-22",
          "summary": "Planning Commission approved SPR-23-0036."
        },
        {
          "date": "2026-09-12",
          "summary": "Current CEC and city pages state 76.6 MW; the earlier 67.2 MW remains historical, not additive."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "willow-creek-ginger-east-west-des-moines",
      "parent_id": null,
      "record_unit": "campus",
      "current_name": "Willow Creek / Ginger East permit-defined group",
      "state": "IA",
      "city": "West Des Moines",
      "county": "Polk",
      "operator": null,
      "lifecycle_status": "operating",
      "status_basis": "Iowa DNR issued Title V Operating Permit 24-TV-005 for an existing data-processing facility grouping two named data centers and two addresses.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "campus",
        "aggregation_allowed": false,
        "note": "Permit lists individual emergency engines; no campus generation total was reconstructed."
      },
      "location": {
        "address": "550 SE White Crane Road and 1475 SE Maffitt Lake Road",
        "city": "West Des Moines",
        "county": "Polk",
        "precision": "approximate",
        "note": "Two named sites and addresses in one air permit; not a settled physical-facility count."
      },
      "sources": [
        {
          "title": "Iowa DNR Title V Operating Permit 24-TV-005",
          "url": "https://www.iowadnr.gov/media/7168/download?inline",
          "type": "issued air operating permit",
          "published": "2024-12-09",
          "retrieved": "2026-09-12",
          "locator": "Cover; p. 4 facility description; pp. 22-31 equipment tables",
          "supports": "Names, addresses, permit identity and existing facility grouping.",
          "source_type": "permit"
        }
      ],
      "confidence": "medium",
      "missing_evidence": [
        "split into physical facilities",
        "parcel crosswalk",
        "owner",
        "explicit operator",
        "critical IT capacity",
        "utility service capacity",
        "opening dates"
      ],
      "history": [
        {
          "date": "2024-12-09",
          "summary": "Iowa DNR issued operating permit 24-TV-005."
        }
      ],
      "inventory_layer": "unresolved",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "meta-richland-parish",
      "parent_id": null,
      "record_unit": "campus",
      "current_name": "Meta Richland Parish Data Center",
      "state": "LA",
      "city": null,
      "county": "Richland Parish",
      "operator": "Meta Platforms, Inc.",
      "lifecycle_status": "construction",
      "status_basis": "Entergy Louisiana's March 2026 sworn testimony says construction on Project Laidley continued to ramp up; a 2025 LPSC order identifies the project as Meta's data center developed through Laidley LLC.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "campus",
        "aggregation_allowed": false,
        "note": "Generic greater-than-1-GW and changing company compute-capacity statements are withheld from the counted field."
      },
      "location": {
        "address": null,
        "city": null,
        "county": "Richland Parish",
        "precision": "approximate",
        "note": "Former Franklin Farm megasite between Rayville and Delhi."
      },
      "physical_scale": "Company/government announcement describes a four-million-square-foot campus on 2,250 acres.",
      "sources": [
        {
          "title": "Louisiana PSC Order No. U-37425",
          "url": "https://lpscpubvalence.lpsc.louisiana.gov/portal/PSC/ViewFile?fileId=nDWn/juc2+A%3D",
          "type": "utility commission order",
          "published": "2025-08-29",
          "retrieved": "2026-09-12",
          "locator": "Overview and Procedural History, pp. 1-2",
          "supports": "Meta/Laidley relationship, existence and parish location.",
          "source_type": "docket"
        },
        {
          "title": "Direct Testimony of Phillip R. May",
          "url": "https://lpscpubvalence.lpsc.louisiana.gov/portal/PSC/ViewFile?fileId=tDDeNhUDZ+w%3D",
          "type": "sworn utility testimony",
          "published": "2026-03",
          "retrieved": "2026-09-12",
          "locator": "Q13, testimony p. 12",
          "supports": "Construction was continuing to ramp up.",
          "source_type": "docket"
        },
        {
          "title": "Louisiana Economic Development Meta announcement",
          "url": "https://www.opportunitylouisiana.gov/news/meta-selects-northeast-louisiana-as-site-of-10-billion-artificial-intelligence-optimized-data-center-governor-jeff-landry-calls-investment-a-new-chapter-for-state",
          "type": "state economic-development announcement",
          "published": "2024-12-04",
          "retrieved": "2026-09-12",
          "locator": "Summary bullets and announcement body",
          "supports": "Campus area, site acreage and named-site location; announced figures are not completed outcomes.",
          "source_type": "government"
        }
      ],
      "confidence": "high",
      "missing_evidence": [
        "street address",
        "parcel",
        "reconciled electrical or critical IT capacity",
        "completion and operating dates"
      ],
      "history": [
        {
          "date": "2024-12-04",
          "summary": "Campus announced."
        },
        {
          "date": "2025-08-29",
          "summary": "LPSC approved an associated generation/transmission settlement."
        },
        {
          "date": "2026-09-12",
          "event_month": "2026-03",
          "summary": "March 2026 utility testimony reported construction ramping; exact day was not established."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "sabey-intergate-quincy",
      "parent_id": null,
      "record_unit": "campus",
      "current_name": "Intergate Quincy — Sabey Data Center Properties",
      "state": "WA",
      "city": "Quincy",
      "county": "Grant",
      "operator": "Sabey Data Center Properties",
      "lifecycle_status": "operating",
      "status_basis": "Washington Ecology's April 2026 approval order calls it an existing data center and approves an expansion.",
      "capacity": {
        "value": 248.1,
        "unit": "MW",
        "kind": "backup_generation_permitted",
        "scope": "campus",
        "aggregation_allowed": false,
        "qualifier": "up to",
        "note": "Combined permitted emergency-generator capacity; not IT load or utility demand."
      },
      "location": {
        "address": "2200 M Street NE, Quincy, WA",
        "city": "Quincy",
        "county": "Grant",
        "precision": "exact",
        "note": null
      },
      "sources": [
        {
          "title": "Washington Ecology Approval Order 26AQ-E016 and technical support document",
          "url": "https://ecology.wa.gov/getattachment/af601a75-5bd5-410c-8a47-dcef65b517ca/20260406SabeyInterNOCTSD.pdf",
          "type": "issued air approval order",
          "published": "2026-04-06",
          "retrieved": "2026-09-12",
          "locator": "Approval letter and Project Summary, pp. 1-2",
          "supports": "Existing status, permittee, exact address and emergency-generator capacity.",
          "source_type": "permit"
        }
      ],
      "confidence": "high",
      "missing_evidence": [
        "critical IT capacity",
        "utility service capacity",
        "measured load",
        "parcel"
      ],
      "history": [
        {
          "date": "2026-04-06",
          "summary": "Ecology issued Approval Order 26AQ-E016 for an expansion."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "amazon-attalia-walla-walla",
      "parent_id": null,
      "record_unit": "campus",
      "current_name": "Amazon Attalia Data Center Campus",
      "state": "WA",
      "city": null,
      "county": "Walla Walla",
      "operator": null,
      "lifecycle_status": "proposed",
      "status_basis": "Walla Walla County deemed the land-use and SEPA applications complete on August 24, 2026 and explicitly said no final decision had been made.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "campus",
        "aggregation_allowed": false
      },
      "location": {
        "address": null,
        "city": null,
        "county": "Walla Walla",
        "precision": "approximate",
        "note": "Parcel 310835410003; generally along Sundance Road between Dodd and Worden Roads."
      },
      "physical_scale": "134-acre application parcel with three proposed data-center buildings of about 220,000 square feet each; the separate 554-acre Port sale is not campus acreage.",
      "sources": [
        {
          "title": "Determination of Completeness — SDP26-01, SEPA26-05",
          "url": "https://www.wwcowa.gov/document_center/commdev/Projects/Amazon/SDP26-01%20SEPA26-05%20Determination%20of%20Completness%202026.08.24.pdf?t=202608241730540",
          "type": "county land-use completeness determination",
          "published": "2026-08-24",
          "retrieved": "2026-09-12",
          "locator": "pp. 1-2",
          "supports": "Applicant/property owner, project name, parcel, 134 acres, three buildings and proposed status; not approval.",
          "source_type": "permit"
        }
      ],
      "confidence": "high",
      "missing_evidence": [
        "final land-use and SEPA decisions",
        "critical IT and utility capacity",
        "operator",
        "construction and operating dates"
      ],
      "history": [
        {
          "date": "2026-08-24",
          "summary": "County deemed the application complete; final decision remained pending."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "meta-prineville",
      "parent_id": null,
      "record_unit": "campus",
      "current_name": "Meta Prineville Data Center",
      "state": "OR",
      "city": "Prineville",
      "county": "Crook",
      "operator": "Meta Platforms, Inc.",
      "lifecycle_status": "operating",
      "status_basis": "Business Oregon's 2019 table reports ongoing jobs at business operations, and 2023 material says Facebook facilities in Prineville were then receiving rural enterprise-zone abatements.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "campus",
        "aggregation_allowed": false
      },
      "location": {
        "address": null,
        "city": "Prineville",
        "county": "Crook",
        "precision": "place_centroid",
        "note": null
      },
      "sources": [
        {
          "title": "Business Oregon currently tax-exempt energy projects and data centers",
          "url": "https://www.oregonlegislature.gov/committees/slb/WorkgroupDocuments/Arthur%20Fish,%20Business%20Oregon%20(project%20list%20-%209-25-19%20meeting).pdf",
          "type": "state incentive table",
          "published": "2019-09-25",
          "retrieved": "2026-09-12",
          "locator": "Currently tax-exempt table, Facebook Data Centers (Vitesse LLC) row",
          "supports": "Existence, Vitesse entity, Crook County and ongoing business operations.",
          "source_type": "government"
        },
        {
          "title": "Business Oregon Commission agenda item — data-center update",
          "url": "https://www.oregon.gov/biz/Publications/Boards/Business%20Oregon%20Commission/2023/AmazonSIPAgendaItem.pdf",
          "type": "state program record",
          "published": "2023-06-02",
          "retrieved": "2026-09-12",
          "locator": "Update on Data Centers in Oregon; LRZ program section",
          "supports": "Facebook data-center incentive facilities in Prineville; counts are incentive units, not verified buildings.",
          "source_type": "government"
        }
      ],
      "confidence": "high",
      "missing_evidence": [
        "street address",
        "parcel",
        "critical IT and utility capacity",
        "verified current building count"
      ],
      "history": [
        {
          "date": "2019-09-25",
          "summary": "State record reported ongoing operations."
        },
        {
          "date": "2023-06-02",
          "summary": "State record reported active Prineville abatements."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "google-botetourt-greenfield",
      "parent_id": null,
      "record_unit": "campus",
      "current_name": "Google Data Center Campus — Botetourt Center at Greenfield",
      "state": "VA",
      "city": null,
      "county": "Botetourt",
      "developer": "Google; exact legal entity not stated",
      "operator": null,
      "lifecycle_status": "approved",
      "status_basis": "Botetourt County says grading plans and a land-disturbance permit were issued in August 2026. Actual grading or building construction was not established.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "campus",
        "aggregation_allowed": false
      },
      "location": {
        "address": null,
        "city": null,
        "county": "Botetourt",
        "precision": "approximate",
        "note": "Botetourt Center at Greenfield; county reports a 312-acre purchase."
      },
      "sources": [
        {
          "title": "Botetourt County Google Data Center project page",
          "url": "https://www.botetourtva.gov/1021/Google-Data-Center",
          "type": "county project and permit-status page",
          "published": null,
          "retrieved": "2026-09-12",
          "locator": "Project Timeline; Public Engagement and Approval Timeline; Land Purchase",
          "supports": "Google identity, named-site location, 312-acre purchase, agreement approvals and issued grading/land-disturbance permit.",
          "source_type": "government"
        }
      ],
      "confidence": "high",
      "missing_evidence": [
        "exact legal entity",
        "street address",
        "parcel",
        "building count",
        "critical IT and utility capacity",
        "evidence grading began"
      ],
      "history": [
        {
          "date": "2025-06-20",
          "summary": "Economic Development Authority approved the performance agreement."
        },
        {
          "date": "2026-09-12",
          "event_month": "2026-08",
          "summary": "County says grading plans and a land-disturbance permit were issued in August 2026; exact day was not established and grading remained projected."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "edgecore-shannon-hill",
      "parent_id": null,
      "record_unit": "project",
      "current_name": "EdgeCore Shannon Hill Data Center Project",
      "state": "VA",
      "city": null,
      "county": "Louisa",
      "developer": "EdgeCore Digital Infrastructure",
      "operator": null,
      "lifecycle_status": "proposed",
      "status_basis": "Louisa County's June 24, 2025 release documents the sale of the 697-acre Shannon Hill Regional Business Park to EdgeCore for data-center development. No reviewed record establishes construction or operation.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "site",
        "aggregation_allowed": false
      },
      "location": {
        "address": null,
        "city": null,
        "county": "Louisa",
        "precision": "approximate",
        "note": "Shannon Hill Regional Business Park off I-64; not a parcel or building coordinate."
      },
      "physical_scale": "The county identifies a 697-acre park sale. This is land area, not a building count or operating footprint.",
      "sources": [
        {
          "title": "Louisa County Sale of Shannon Hill Regional Business Park",
          "url": "https://www.louisacounty.gov/CivicAlerts.aspx?AID=470",
          "type": "county property-sale announcement",
          "published": "2025-06-24",
          "retrieved": "2026-09-13",
          "locator": "Press Release, paragraphs 1 and 4-6",
          "supports": "EdgeCore buyer/developer identity, 697-acre park, data-center development purpose and location off I-64. Water-performance statements are not adopted as independent findings.",
          "source_type": "government"
        }
      ],
      "confidence": "high",
      "missing_evidence": [
        "street address",
        "parcel crosswalk",
        "operator",
        "critical IT and utility capacity",
        "building count",
        "construction evidence"
      ],
      "history": [
        {
          "date": "2026-09-13",
          "field": "publication",
          "summary": "Added as a bounded proposed-stage project after independent review of the cited Louisa County record."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "solis-arx-fluidstack-progress-park",
      "parent_id": null,
      "record_unit": "project",
      "current_name": "Solis Arx / Fluidstack Progress Park Project",
      "state": "VA",
      "city": null,
      "county": "Wythe",
      "developer": "Solis Arx; acquired by Fluidstack according to Wythe County",
      "operator": null,
      "lifecycle_status": "proposed",
      "status_basis": "Wythe County describes a 99-acre AI-computing campus announced December 5, 2025 and a June 9, 2026 Fluidstack presentation about its acquisition of Solis Arx. No reviewed record establishes construction or operation.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "site",
        "aggregation_allowed": false
      },
      "location": {
        "address": null,
        "city": null,
        "county": "Wythe",
        "precision": "approximate",
        "note": "A 99-acre tract in Progress Park; no street address or parcel crosswalk established."
      },
      "physical_scale": "County project page describes a 99-acre tract. It does not establish a completed building count.",
      "sources": [
        {
          "title": "Solis Arx/Fluidstack — Progress Park project page",
          "url": "https://www.wytheco.org/418/Solis-Arx",
          "type": "county project page",
          "published": null,
          "retrieved": "2026-09-13",
          "locator": "Opening project description; About the Project; June 9, 2026 acquisition note",
          "supports": "Project name, Solis Arx developer role, Fluidstack acquisition statement, Wythe County location, 99-acre tract and proposed multi-phase scope.",
          "source_type": "government"
        }
      ],
      "confidence": "high",
      "missing_evidence": [
        "street address",
        "parcel crosswalk",
        "operator",
        "critical IT and utility capacity",
        "construction evidence",
        "opening date"
      ],
      "history": [
        {
          "date": "2026-09-13",
          "field": "publication",
          "summary": "Added as a bounded proposed-stage project after independent review of the cited Wythe County record."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "pairmont-data-center-campus",
      "parent_id": null,
      "record_unit": "project",
      "current_name": "Pairmont Data Center Campus",
      "state": "VA",
      "city": null,
      "county": "Spotsylvania",
      "developer": null,
      "operator": null,
      "lifecycle_status": "proposed",
      "status_basis": "Spotsylvania County's March 25, 2026 status report names Eagle Rock Partners LLC as the applicant for rezoning case R25-0014 and lists the case as under review. Applicant identity does not by itself establish the developer or owner, and proposed acreage and floor area are not existing buildings.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "site",
        "aggregation_allowed": false
      },
      "location": {
        "address": null,
        "city": null,
        "county": "Spotsylvania",
        "precision": "approximate",
        "note": "Parcels 51-A-29 and 51-A-30; access proposed through Caroline County."
      },
      "physical_scale": "County status report describes a proposal for approximately 900,000 square feet on approximately 99 acres.",
      "sources": [
        {
          "title": "Spotsylvania County Planning Department March 2026 status report",
          "url": "https://www.spotsylvania.va.us/DocumentCenter/View/40486/BOS-Memo-Planning-Dept-Monthly-and-Project-Summary-Reports-March-2026",
          "type": "county planning status report",
          "published": "2026-03-25",
          "retrieved": "2026-09-13",
          "locator": "PDF p. 4, case R25-0014",
          "supports": "Applicant, project name, parcel IDs, approximately 99-acre rezoning area, proposed 900,000 square feet and under-review status as of March 25, 2026.",
          "source_type": "government"
        },
        {
          "title": "R25-0014 Pairmont Data Center Campus case page",
          "url": "https://www.spotsylvania.va.us/3137/R25-0014-Pairmont-Data-Center-Campus",
          "type": "county planning case page",
          "published": null,
          "retrieved": "2026-09-13",
          "locator": "Case heading and third-submission document list",
          "supports": "Current county case identity and continuing document docket.",
          "source_type": "government"
        }
      ],
      "confidence": "high",
      "missing_evidence": [
        "street address",
        "coordinates",
        "developer or owner",
        "operator",
        "critical IT and utility capacity",
        "approval outcome",
        "construction evidence"
      ],
      "history": [
        {
          "date": "2026-09-13",
          "field": "publication",
          "summary": "Added as a bounded under-review project after independent review of Spotsylvania County case records."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "massaponax-tech-campus",
      "parent_id": null,
      "record_unit": "project",
      "current_name": "Massaponax Tech Campus",
      "state": "VA",
      "city": null,
      "county": "Spotsylvania",
      "developer": null,
      "operator": null,
      "lifecycle_status": "proposed",
      "status_basis": "Spotsylvania County's March 25, 2026 status report names Lavue Lane Owner LLC as the applicant for rezoning case R25-0004 and lists the case as under review. Applicant identity does not by itself establish the developer or owner, and proposed buildout is not an operating or construction finding.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "site",
        "aggregation_allowed": false
      },
      "location": {
        "address": null,
        "city": null,
        "county": "Spotsylvania",
        "precision": "approximate",
        "note": "Twelve county parcel IDs around Massaponax Church Road, Summit Crossing Road and Mills Drive are listed in the cited status report."
      },
      "physical_scale": "County status report describes a proposal for approximately 6 million square feet of data-center buildings on approximately 588 acres.",
      "sources": [
        {
          "title": "Spotsylvania County Planning Department March 2026 status report",
          "url": "https://www.spotsylvania.va.us/DocumentCenter/View/40486/BOS-Memo-Planning-Dept-Monthly-and-Project-Summary-Reports-March-2026",
          "type": "county planning status report",
          "published": "2026-03-25",
          "retrieved": "2026-09-13",
          "locator": "PDF p. 3, case R25-0004",
          "supports": "Applicant, project name, listed parcels, approximately 588-acre rezoning area, proposed 6 million square feet and under-review status as of March 25, 2026.",
          "source_type": "government"
        },
        {
          "title": "R25-0004 Massaponax Tech Campus case page",
          "url": "https://www.spotsylvania.va.us/3138/R25-0004-Massaponax-Tech-Campus",
          "type": "county planning case page",
          "published": null,
          "retrieved": "2026-09-13",
          "locator": "Case heading and fourth-submission document list",
          "supports": "Current county case identity and continuing document docket.",
          "source_type": "government"
        }
      ],
      "confidence": "high",
      "missing_evidence": [
        "street address",
        "coordinates",
        "developer or owner",
        "operator",
        "critical IT and utility capacity",
        "approval outcome",
        "construction evidence"
      ],
      "history": [
        {
          "date": "2026-09-13",
          "field": "publication",
          "summary": "Added as a bounded under-review project after independent review of Spotsylvania County case records."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "thornburg-industrial-park-2",
      "parent_id": null,
      "record_unit": "project",
      "current_name": "Thornburg Industrial Park 2",
      "state": "VA",
      "city": null,
      "county": "Spotsylvania",
      "developer": null,
      "operator": null,
      "lifecycle_status": "proposed",
      "status_basis": "Spotsylvania County's March 25, 2026 status report names South Roxbury Mill LLC as the applicant for case R25-0011 and lists the case as under review. Applicant identity does not by itself establish the developer or owner. The record distinguishes a 49-acre rezoning from a proffer amendment affecting 124 acres.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "site",
        "aggregation_allowed": false
      },
      "location": {
        "address": "0 S Roxbury Mill Rd",
        "city": null,
        "county": "Spotsylvania",
        "precision": "approximate",
        "note": "Parcels 63-5-C1 and 63-5-C; the address is the county case's zero-address label, not an occupied street address."
      },
      "physical_scale": "A 49-acre rezoning plus a proffer amendment affecting 124 acres. The 124 acres are not presented as a campus footprint.",
      "sources": [
        {
          "title": "Spotsylvania County Planning Department March 2026 status report",
          "url": "https://www.spotsylvania.va.us/DocumentCenter/View/40486/BOS-Memo-Planning-Dept-Monthly-and-Project-Summary-Reports-March-2026",
          "type": "county planning status report",
          "published": "2026-03-25",
          "retrieved": "2026-09-13",
          "locator": "PDF p. 4, case R25-0011",
          "supports": "Applicant, project name, parcel IDs, 49-acre rezoning, separate 124-acre proffer-amendment scope and under-review status as of March 25, 2026.",
          "source_type": "government"
        },
        {
          "title": "Spotsylvania County rezoning cases index",
          "url": "https://www.spotsylvania.va.us/799/Rezoning-Cases",
          "type": "county planning case index",
          "published": null,
          "retrieved": "2026-09-13",
          "locator": "Active rezoning cases, R25-0011",
          "supports": "Current case identity in the county's active-case index.",
          "source_type": "government"
        }
      ],
      "confidence": "high",
      "missing_evidence": [
        "occupied street address",
        "coordinates",
        "developer or owner",
        "operator",
        "critical IT and utility capacity",
        "approval outcome",
        "construction evidence"
      ],
      "history": [
        {
          "date": "2026-09-13",
          "field": "publication",
          "summary": "Added as a bounded under-review project after independent review of Spotsylvania County case records."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "mineral-gap-data-center",
      "parent_id": null,
      "record_unit": "operating_facility",
      "current_name": "Mineral Gap Data Center",
      "state": "VA",
      "city": "Wise",
      "county": "Wise",
      "developer": null,
      "operator": null,
      "lifecycle_status": "operating",
      "status_basis": "Wise County Economic Development says Mineral Gap was established in 2017 and serves government and private clients at Lonesome Pine Business & Technology Park. The county page supports operation but does not identify the current operator.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "building",
        "aggregation_allowed": false
      },
      "location": {
        "address": null,
        "city": "Wise",
        "county": "Wise",
        "precision": "approximate",
        "note": "Lonesome Pine Business & Technology Park; no street address or parcel crosswalk established."
      },
      "sources": [
        {
          "title": "Data Centers — Wise County Economic Development",
          "url": "https://elevatewisecounty.com/top-industries/data-centers/",
          "type": "county economic-development page",
          "published": null,
          "retrieved": "2026-09-13",
          "locator": "Mineral Gap: A Proven Model",
          "supports": "Facility name, Lonesome Pine park location, 2017 establishment and current operating description. The 3.6 MW solar array is generation, not facility IT capacity.",
          "source_type": "government"
        }
      ],
      "confidence": "medium",
      "missing_evidence": [
        "current operator",
        "street address",
        "parcel crosswalk",
        "critical IT and utility capacity",
        "current building scale"
      ],
      "history": [
        {
          "date": "2026-09-13",
          "field": "publication",
          "summary": "Added as a bounded operating-facility record after independent review of the cited Wise County source."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "goodnight-data-center",
      "parent_id": null,
      "record_unit": "project",
      "current_name": "Goodnight Data Center",
      "state": "TX",
      "city": "Claude",
      "county": "Armstrong",
      "developer": null,
      "operator": null,
      "lifecycle_status": "proposed",
      "status_basis": "TCEQ names Crusoe Energy Systems LLC as the applicant for pending air-permit application 182880. The index records January 30, 2026 as the received date and links an administratively complete application; it does not establish a publication or completion date, approval, construction or operation.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "site",
        "aggregation_allowed": false
      },
      "location": {
        "address": null,
        "city": "Claude",
        "county": "Armstrong",
        "precision": "approximate",
        "lat": 35.01752,
        "lon": -101.31175,
        "note": "TCEQ's stated point for proposed electricity generation; not a parcel survey or building centroid."
      },
      "sources": [
        {
          "title": "TCEQ Plain Language Summary — permit 182880",
          "url": "https://www.tceq.texas.gov/downloads/permitting/air/bilingual/pending-permit-notices/182880-pls-english.pdf",
          "type": "pending air-permit filing",
          "published": null,
          "retrieved": "2026-09-13",
          "locator": "PDF p. 1, lines naming applicant, facility, coordinates and proposed equipment",
          "supports": "Crusoe applicant identity, Goodnight facility name, Claude and Armstrong County location, coordinates and proposed power-generation equipment for data-center buildings. Applicant identity does not establish the developer, owner or operator.",
          "source_type": "permit"
        },
        {
          "title": "TCEQ Pending Applications: New Source Review Permits",
          "url": "https://www.tceq.texas.gov/assets/public/permitting/air/reports/applications/nsr-pending-permits.html",
          "type": "state pending-permit index",
          "published": null,
          "retrieved": "2026-09-13",
          "locator": "Crusoe Energy Systems LLC — Goodnight Data Center — permits 182880, GHGPSDTX268 and PSDTX1698",
          "supports": "Pending application identity, January 30, 2026 received date and link to the administratively complete application. The index does not give a publication or completion date.",
          "source_type": "permit"
        }
      ],
      "confidence": "high",
      "missing_evidence": [
        "street address",
        "parcel",
        "developer or owner crosswalk",
        "operator or tenant",
        "critical IT and utility capacity",
        "generation capacity",
        "construction evidence"
      ],
      "history": [
        {
          "date": "2026-09-13",
          "field": "publication",
          "summary": "Added as a permit-defined proposed project after independent review of current TCEQ records."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "nexus-data-center-hubbard",
      "parent_id": null,
      "record_unit": "project",
      "current_name": "Nexus Data Center Hubbard",
      "state": "TX",
      "city": "Hubbard",
      "county": "Hill",
      "developer": null,
      "operator": null,
      "lifecycle_status": "proposed",
      "status_basis": "TCEQ names Nexus Hubbard Power, LLC as the applicant for pending applications 183046, GHGPSDTX269 and PSDTX1700. The index records February 17, 2026 as the received date and links an administratively complete application; it does not establish a publication or completion date, approval, construction or operation.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "site",
        "aggregation_allowed": false
      },
      "location": {
        "address": "880 State Highway 171",
        "city": "Hubbard",
        "county": "Hill",
        "precision": "exact",
        "note": "Address printed in the TCEQ plain-language summary; no parcel crosswalk established."
      },
      "sources": [
        {
          "title": "TCEQ Plain Language Summary — permits 183046, GHGPSDTX269 and PSDTX1700",
          "url": "https://www.tceq.texas.gov/downloads/permitting/air/bilingual/pending-permit-notices/183046-pls-english.pdf",
          "type": "pending air-permit filing",
          "published": null,
          "retrieved": "2026-09-13",
          "locator": "PDF p. 1, lines naming applicant, facility, address and proposed power-generation purpose",
          "supports": "Nexus Hubbard Power applicant identity, Nexus Data Center Hubbard name and Hubbard address. Applicant identity does not establish the developer, owner or operator. The filing concerns generation supporting the data center, not critical IT load or measured demand.",
          "source_type": "permit"
        },
        {
          "title": "TCEQ Pending Applications: New Source Review Permits",
          "url": "https://www.tceq.texas.gov/assets/public/permitting/air/reports/applications/nsr-pending-permits.html",
          "type": "state pending-permit index",
          "published": null,
          "retrieved": "2026-09-13",
          "locator": "Nexus Hubbard Power, LLC — Nexus Data Center Hubbard — permits 183046, GHGPSDTX269 and PSDTX1700",
          "supports": "Pending application identity, February 17, 2026 received date and link to the administratively complete application. The index does not give a publication or completion date.",
          "source_type": "permit"
        }
      ],
      "confidence": "high",
      "missing_evidence": [
        "parcel",
        "coordinates",
        "developer, owner, operator or tenant",
        "critical IT and utility capacity",
        "generation capacity",
        "construction evidence"
      ],
      "history": [
        {
          "date": "2026-09-13",
          "field": "publication",
          "summary": "Added as a permit-defined proposed project after independent review of current TCEQ records."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "adc-plano",
      "parent_id": null,
      "record_unit": "operating_facility",
      "current_name": "ADC Plano",
      "state": "TX",
      "city": "Plano",
      "county": "Collin",
      "developer": null,
      "operator": null,
      "lifecycle_status": "operating",
      "status_basis": "TCEQ's pending renewal summary names Aligned Data Centers REIT LLC as the applicant for ADC Plano and says the application would authorize continued operation of 20 diesel generators and five tanks. The index records March 30, 2026 as the received date and does not establish a publication or completion date. This supports operation of the permitted facility equipment, not the applicant's current operator role or an IT-capacity figure.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "building",
        "aggregation_allowed": false
      },
      "location": {
        "address": "2800 Summit Avenue",
        "city": "Plano",
        "county": "Collin",
        "precision": "exact",
        "note": "Address printed in the TCEQ renewal summary; building-to-campus relationship remains unresolved."
      },
      "sources": [
        {
          "title": "TCEQ Plain Language Summary — renewal permit 131651",
          "url": "https://www.tceq.texas.gov/downloads/permitting/air/bilingual/pending-permit-notices/131651-pls-english.pdf",
          "type": "air-permit renewal filing",
          "published": null,
          "retrieved": "2026-09-13",
          "locator": "PDF p. 1, renewal summary and continued-operation statement",
          "supports": "Aligned applicant identity, ADC Plano facility name, address, county and continued operation of permitted backup equipment. Applicant identity does not establish the current operator, and generator count is not IT capacity.",
          "source_type": "permit"
        },
        {
          "title": "TCEQ Pending Applications: New Source Review Permits",
          "url": "https://www.tceq.texas.gov/assets/public/permitting/air/reports/applications/nsr-pending-permits.html",
          "type": "state pending-permit index",
          "published": null,
          "retrieved": "2026-09-13",
          "locator": "Aligned Data Centers REIT LLC — ADC Plano — permit 131651",
          "supports": "March 30, 2026 received date and link to the technically complete renewal application. The index does not give a publication or completion date.",
          "source_type": "permit"
        }
      ],
      "confidence": "high",
      "missing_evidence": [
        "parcel",
        "coordinates",
        "building-to-campus crosswalk",
        "current operator",
        "critical IT and utility capacity"
      ],
      "history": [
        {
          "date": "2026-09-13",
          "field": "publication",
          "summary": "Added as a bounded operating-facility record after independent review of current TCEQ records."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "gilroy-data-center",
      "parent_id": null,
      "record_unit": "project",
      "current_name": "Gilroy Data Center",
      "state": "CA",
      "city": "Gilroy",
      "county": "Santa Clara",
      "developer": null,
      "operator": null,
      "lifecycle_status": "construction",
      "status_basis": "The City of Gilroy lists project AS 20-23 as under construction and records entitlement approval on July 3, 2025, a grading and underground-utility permit on December 11, 2025, and a building permit on March 19, 2026. The city identifies Amazon Web Services as the applicant; applicant does not by itself establish developer, owner or operator.",
      "capacity": {
        "value": 49,
        "unit": "MW",
        "kind": "utility_request",
        "scope": "phase",
        "aggregation_allowed": false,
        "note": "City-stated Phase I connection requirement to PG&E; not critical IT capacity, campus design capacity or measured load."
      },
      "location": {
        "address": "8050 Camino Arroyo",
        "city": "Gilroy",
        "county": "Santa Clara",
        "precision": "exact",
        "note": "City project page identifies APN 841-69-044. No parcel geometry or building centroid is published here."
      },
      "physical_scale": "A 56-acre site with two planned data-center buildings and one security building, about 438,500 square feet in total. Phase I is one planned 218,000-square-foot data-center building; planned buildings are not operating buildings.",
      "sources": [
        {
          "title": "Gilroy Data Center by AWS — AS 20-23",
          "url": "https://www.cityofgilroy.org/1019/Gilroy-Data-Center-by-AWS",
          "type": "municipal project and permit page",
          "published": null,
          "retrieved": "2026-09-13",
          "locator": "Project Background and Information; Project Description",
          "supports": "Project number, applicant role, status, permit dates, address, parcel, Phase I utility-request scope and planned physical scale.",
          "source_type": "government"
        }
      ],
      "confidence": "high",
      "missing_evidence": [
        "developer",
        "owner",
        "operator",
        "critical IT capacity",
        "campus design capacity",
        "measured load",
        "opening or completion date"
      ],
      "history": [
        {
          "date": "2025-07-03",
          "summary": "City records entitlement approval for Site and Architectural Application AS 20-23."
        },
        {
          "date": "2025-08-18",
          "summary": "City records withdrawal of an appeal filed July 21, 2025."
        },
        {
          "date": "2025-12-11",
          "summary": "City records issuance of a grading and underground-utility permit."
        },
        {
          "date": "2026-03-19",
          "summary": "City records issuance of a building permit."
        },
        {
          "date": "2026-09-13",
          "field": "publication",
          "summary": "Added as a bounded construction-stage project after independent review of the City of Gilroy source."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "project-cardinal-yorkville",
      "parent_id": null,
      "record_unit": "project",
      "current_name": "Project Cardinal Data Center Campus",
      "state": "IL",
      "city": "Yorkville",
      "county": "Kendall",
      "developer": null,
      "operator": null,
      "lifecycle_status": "approved",
      "status_basis": "Yorkville's amendment page says the Project Cardinal annexation agreement was approved November 10, 2025 via Ordinance 2025-78. This is approval of that agreement, not proof that every rezoning, PUD, permit or construction step is complete. The same page describes a later deadline amendment request and undeveloped farmland; no construction record was reviewed. Pioneer Development is identified as petitioner and contract purchaser, not treated here as a verified developer or operator.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "site",
        "aggregation_allowed": false,
        "note": "No primary-source critical IT, utility-service or measured-load figure was established."
      },
      "location": {
        "address": null,
        "city": "Yorkville",
        "county": "Kendall",
        "precision": "approximate",
        "note": "Generally northwest of Illinois Route 47 and Galena Road, south of Baseline Road and east of Ashe Road. No parcel identifiers or occupied street address are published here."
      },
      "physical_scale": "The original application describes 14 planned data-center buildings totaling more than 17 million square feet across approximately 1,037 acres and 20 parcels. A separate 2026 annexation-agreement amendment concerns seven parcels totaling about 305 acres; that subset is not added to the original acreage.",
      "sources": [
        {
          "title": "Project Cardinal Data Center Campus — annexation, rezoning and PUD",
          "url": "https://www.yorkville.il.us/906/Project-Cardinal-Data-Center-Campus-Anne",
          "type": "municipal project docket",
          "published": null,
          "retrieved": "2026-09-13",
          "locator": "Proposed Project; Documents; Public Meeting Schedule",
          "supports": "Petitioner and contract-purchaser role, owners named in the application, approximate original site scope, planned buildings and location.",
          "source_type": "government"
        },
        {
          "title": "Project Cardinal Data Center Campus — annexation agreement amendment",
          "url": "https://www.yorkville.il.us/941/Project-Cardinal-Data-Center-Campus-Anne",
          "type": "municipal amendment docket",
          "published": null,
          "retrieved": "2026-09-13",
          "locator": "Proposed Project; Public Meeting Schedule",
          "supports": "November 10, 2025 annexation-agreement approval via Ordinance 2025-78, the later amendment request, undeveloped condition and non-additive 305-acre amendment scope.",
          "source_type": "government"
        }
      ],
      "confidence": "high",
      "missing_evidence": [
        "street address",
        "parcel identifiers",
        "owner after closing",
        "developer",
        "operator",
        "critical IT capacity",
        "utility service capacity",
        "construction evidence",
        "final disposition of the 2026 amendment request"
      ],
      "history": [
        {
          "date": "2025-11-10",
          "summary": "Yorkville records approval of the annexation agreement via Ordinance 2025-78."
        },
        {
          "date": "2026-09-13",
          "field": "publication",
          "summary": "Added with approved status bounded to the annexation agreement after independent review of Yorkville's project dockets."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "project-baccara",
      "parent_id": null,
      "record_unit": "project",
      "current_name": "Project Baccara",
      "state": "AZ",
      "city": null,
      "county": "Maricopa",
      "developer": "Takanock, LLC",
      "operator": null,
      "lifecycle_status": "proposed",
      "status_basis": "The data-center project remains proposed. The Arizona Corporation Commission voted on February 4, 2026 to approve a Certificate of Environmental Compatibility for Baccara Power, LLC's planned generation and interconnection, but expressly said this was not approval of the data center; Maricopa County and Luke Air Force Base approvals were still pending. No construction record was reviewed.",
      "capacity": {
        "value": 700,
        "unit": "MW",
        "kind": "onsite_generation_planned",
        "scope": "site",
        "aggregation_allowed": false,
        "note": "Approximately 700 MW of planned natural-gas generation for the data center and regional grid; not critical IT capacity, utility demand or measured load."
      },
      "location": {
        "address": null,
        "city": null,
        "county": "Maricopa",
        "precision": "approximate",
        "note": "Arizona Corporation Commission describes an industrial area north of Luke Air Force Base near Olive Avenue and the Bullard Avenue alignment. No reconciled parcel or occupied street address is published here."
      },
      "physical_scale": "Two planned data-center buildings. Planned buildings are not operating buildings.",
      "sources": [
        {
          "title": "Arizona Corporation Commission February 4, 2026 Open Meeting Highlights",
          "url": "https://www.azcc.gov/news/home/2026/02/06/february-4--2026-open-meeting-highlights",
          "type": "state utility-commission meeting summary",
          "published": "2026-02-06",
          "retrieved": "2026-09-13",
          "locator": "Utilities section, Baccara Power, LLC",
          "supports": "Project identity, developer, county, generation-certificate approval, planned building count, generation scope and outstanding approval boundary.",
          "source_type": "government"
        }
      ],
      "confidence": "high",
      "missing_evidence": [
        "street address",
        "parcel identifiers",
        "owner",
        "operator",
        "critical IT capacity",
        "utility service capacity",
        "construction evidence",
        "Maricopa County approval",
        "Luke Air Force Base approval"
      ],
      "history": [
        {
          "date": "2026-02-04",
          "summary": "Arizona Corporation Commission approved the generation and interconnection Certificate of Environmental Compatibility; it did not approve the data center itself."
        },
        {
          "date": "2026-09-13",
          "field": "publication",
          "summary": "Added as a proposed data-center project after a second review of the Commission source; the separate generation-certificate approval is preserved without promoting the project lifecycle."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "apple-reno-data-center",
      "parent_id": null,
      "record_unit": "campus",
      "current_name": "Apple Reno Data Center",
      "state": "NV",
      "city": "Sparks",
      "county": "Washoe",
      "developer": null,
      "operator": "Apple",
      "lifecycle_status": "operating",
      "status_basis": "Nevada Governor's Office of Economic Development minutes describe an expansion of Apple's existing Washoe County data-center operations, state that the data center opened in December 2012, and identify Apple campus representatives. This is a state incentive record containing both agency action and company statements; it is not a measured-load or building-level operating census.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "campus",
        "aggregation_allowed": false,
        "note": "No primary-source critical IT capacity, utility-service capacity or measured-load figure was established."
      },
      "location": {
        "address": "21505 Reno Technology Parkway W",
        "city": "Sparks",
        "county": "Washoe",
        "precision": "exact",
        "note": "The 2024 GOED application packet identifies this as the proposed/actual Nevada facility address. No parcel identifier or independently reconciled building centroid is published here."
      },
      "physical_scale": "No independently reconciled building count, parcel acreage or occupied-building denominator is published here.",
      "sources": [
        {
          "title": "Nevada GOED Board Meeting Minutes — July 25, 2024",
          "url": "https://goed.nv.gov/wp-content/uploads/2024/09/3.-GOED-Board-Meeting-Minutes-July-25-2024.pdf",
          "type": "state economic-development board minutes",
          "published": "2024-07-25",
          "retrieved": "2026-09-13",
          "locator": "PDF pp. 8–9, item 7.B Apple Inc.",
          "supports": "Existing Washoe County operation, December 2012 opening statement, expansion proceeding and approval of the data-center sales-tax abatement.",
          "source_type": "government"
        },
        {
          "title": "Nevada GOED Apple Inc. Board Packet",
          "url": "https://goed.nv.gov/wp-content/uploads/2024/07/7-B.-Apple-Inc.-Board-Packet.pdf",
          "type": "state incentive application packet",
          "published": "2024-07-25",
          "retrieved": "2026-09-13",
          "locator": "PDF p. 1 application facts; physical p. 6, Section 2",
          "supports": "Apple entity, expansion type, Washoe County and the 21505 Reno Technology Parkway W facility address.",
          "source_type": "government"
        }
      ],
      "confidence": "high",
      "missing_evidence": [
        "parcel identifiers",
        "owner",
        "developer",
        "critical IT capacity",
        "utility service capacity",
        "measured load",
        "independently reconciled building count",
        "current expansion completion"
      ],
      "history": [
        {
          "date": "2024-07-25",
          "summary": "Nevada GOED approved Apple for a data-center sales-tax abatement tied to expansion of the existing Washoe County operation."
        },
        {
          "date": "2026-09-13",
          "field": "publication",
          "summary": "Added as a bounded operating-campus record after a second review of the Nevada GOED minutes and application packet."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "microsoft-tyrone-data-center",
      "parent_id": null,
      "record_unit": "project",
      "current_name": "Microsoft Tyrone Data Center Project",
      "state": "GA",
      "city": "Tyrone",
      "county": "Fayette",
      "developer": null,
      "operator": null,
      "lifecycle_status": "approved",
      "status_basis": "Tyrone says its Town Council approved the project's rezoning in March 2024. The same municipal page says that as of June 2, 2026 no site plan, land-disturbance permit or building-permit application had been submitted and construction could not begin until required approvals and permits were obtained. This supports a zoning-approved project, not construction or operation.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "site",
        "aggregation_allowed": false,
        "note": "No primary-source critical IT, utility-service, generation or measured-load figure was established."
      },
      "location": {
        "address": null,
        "city": "Tyrone",
        "county": "Fayette",
        "precision": "approximate",
        "note": "The Town identifies the project as being in Tyrone but does not establish a reconciled street address or parcel on the cited page."
      },
      "physical_scale": "No independently reconciled building count, square footage or site acreage is published here.",
      "sources": [
        {
          "title": "Microsoft Data Center Project Information — Town of Tyrone",
          "url": "https://www.tyronega.gov/datacenter",
          "type": "municipal project and permit-status page",
          "published": null,
          "retrieved": "2026-09-13",
          "locator": "Introduction; Current Status; General Information FAQs, approval timeline and construction question",
          "supports": "Microsoft project identity, Tyrone location, March 2024 rezoning approval and the June 2, 2026 absence of site-plan, land-disturbance and building-permit applications.",
          "source_type": "government"
        }
      ],
      "confidence": "high",
      "missing_evidence": [
        "street address",
        "parcel identifiers",
        "owner",
        "developer",
        "operator",
        "building count",
        "critical IT capacity",
        "utility service capacity",
        "construction evidence"
      ],
      "history": [
        {
          "date": "2024-03-28",
          "summary": "Town records Town Council approval of the rezoning request."
        },
        {
          "date": "2026-06-02",
          "summary": "Town reported that no site-plan, land-disturbance or building-permit applications had been submitted."
        },
        {
          "date": "2026-09-13",
          "field": "publication",
          "summary": "Added as a zoning-approved project after a fresh review of the Town of Tyrone source; unverified Project Rita, building and capacity details were excluded."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "qts-york-county-campus",
      "parent_id": null,
      "record_unit": "campus",
      "current_name": "QTS York County Data Center Campus",
      "state": "SC",
      "city": null,
      "county": "York",
      "developer": "QTS Data Centers",
      "operator": null,
      "lifecycle_status": "construction",
      "status_basis": "York County describes its only data-center site as being constructed by QTS and says nine buildings were in various stages of development when the county's July 2026 moratorium took effect. The county says prior site-plan approvals carry vested rights. This supports one construction-stage campus; it does not establish nine operating facilities.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "campus",
        "aggregation_allowed": false,
        "note": "No primary-source critical IT, utility-service, generation or measured-load figure was established."
      },
      "location": {
        "address": null,
        "city": null,
        "county": "York",
        "precision": "approximate",
        "note": "South Carolina Commerce places the campus near Hands Mill Highway and Campbell Road in unincorporated York County. No reconciled parcel or street address is published here."
      },
      "physical_scale": "York County says nine buildings are in various stages of development. They are planned or developing parts of one campus, not nine independently verified operating facilities.",
      "sources": [
        {
          "title": "Data Centers — York County, South Carolina",
          "url": "https://www.yorkcountysc.gov/1313/Data-Centers",
          "type": "county project and moratorium page",
          "published": null,
          "retrieved": "2026-09-13",
          "locator": "Data Center Moratorium Q&A; QTS and the company's facilities in York County",
          "supports": "QTS identity, one active construction site, nine buildings in stages of development, vested site-plan rights and the county's 2026 moratorium boundary.",
          "source_type": "government"
        },
        {
          "title": "QTS Data Centers establishing first South Carolina operations in York County",
          "url": "https://www.sccommerce.com/news/qts-data-centers-establishing-first-south-carolina-operations-york-county",
          "type": "state economic-development announcement",
          "published": "2023-09-19",
          "retrieved": "2026-09-13",
          "locator": "Opening project description and Five Fast Facts",
          "supports": "Campus identity and location near Hands Mill Highway and Campbell Road in unincorporated York County.",
          "source_type": "government"
        }
      ],
      "confidence": "high",
      "missing_evidence": [
        "street address",
        "parcel identifiers",
        "owner",
        "operator",
        "critical IT capacity",
        "utility service capacity",
        "opening date",
        "building-level operating denominator"
      ],
      "history": [
        {
          "date": "2023-09-19",
          "summary": "South Carolina Commerce announced the QTS campus in unincorporated York County."
        },
        {
          "date": "2026-07-13",
          "summary": "York County recorded its moratorium taking effect while describing nine QTS buildings in stages of development under vested site plans."
        },
        {
          "date": "2026-09-13",
          "field": "publication",
          "summary": "Added as one construction-stage campus after a fresh review of county and state records; planned/developing buildings were not counted as operating facilities."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "amazon-bwi150-frederick-campus",
      "parent_id": null,
      "record_unit": "campus",
      "current_name": "Amazon Data Services BWI-150–BWI-153 Campus",
      "state": "MD",
      "city": null,
      "county": "Frederick",
      "developer": null,
      "operator": null,
      "lifecycle_status": "approved",
      "status_basis": "The Maryland Department of the Environment issued an emergency-generator construction permit for Amazon Data Services' BWI-150–BWI-153 campus on March 25, 2026. The permit establishes an approval milestone; it does not establish campus construction, operation or critical IT capacity.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "campus",
        "aggregation_allowed": false,
        "note": "The permit covers backup generators. Their ratings are not critical IT capacity, utility service, measured load or evidence that the campus is operating."
      },
      "location": {
        "address": "3250 Digital Drive",
        "city": null,
        "county": "Frederick",
        "precision": "exact",
        "note": "The permit gives Frederick, MD 21703 as the locality label. It does not establish that the site is incorporated within the City of Frederick, and no parcel crosswalk is published here."
      },
      "physical_scale": "No building or operating-facility count is added to the public totals from this approval record.",
      "sources": [
        {
          "title": "MDE Permit to Construct — Amazon BWI-150 through BWI-153",
          "url": "https://mde.maryland.gov/programs/permits/AirManagementPermits/Documents/Public-Review/Alt%20NSPS/Amazon%20PTC%202025.pdf",
          "type": "issued state air construction permit",
          "published": "2026-03-25",
          "retrieved": "2026-09-13",
          "locator": "PDF pp. 1–2, construction-permit stamp; control B-08076; premises 021-0809; AI 185075",
          "supports": "Amazon Data Services, BWI-150 through BWI-153 campus identity, issued emergency-generator construction permit and 3250 Digital Drive address.",
          "source_type": "permit"
        },
        {
          "title": "Maryland Department of the Environment approves air permit for Frederick data center",
          "url": "https://news.maryland.gov/mde/2026/03/25/maryland-department-of-environment-approves-air-permit-for-frederick-data-center/",
          "type": "state environmental agency announcement",
          "published": "2026-03-25",
          "retrieved": "2026-09-13",
          "locator": "Headline and opening paragraph; emergency-generator use paragraph",
          "supports": "Final air-permit determination, applicant, address and backup-generator purpose. It does not establish campus operation.",
          "source_type": "government"
        },
        {
          "title": "Frederick Data Center sampling and reports",
          "url": "https://mde.maryland.gov/datacenters/Pages/FrederickDataCenter.aspx",
          "type": "state environmental project page",
          "published": null,
          "retrieved": "2026-09-13",
          "locator": "Quantum Maryland / Quantum Frederick section; 2026 Documents",
          "supports": "Amazon project identity at 3250 Digital Drive and the issued BWI permit's place in the larger Quantum Frederick site. No canonical parent relationship is inferred.",
          "source_type": "government"
        }
      ],
      "confidence": "high",
      "missing_evidence": [
        "incorporated city boundary",
        "parcel crosswalk",
        "land owner",
        "developer",
        "operator",
        "critical IT capacity",
        "utility service capacity",
        "campus construction evidence",
        "opening or completion date"
      ],
      "history": [
        {
          "date": "2026-03-25",
          "summary": "MDE issued the emergency-generator air construction permit."
        },
        {
          "date": "2026-09-13",
          "field": "publication",
          "summary": "Added as one permit-approved campus after a fresh review of the issued permit and MDE pages; generator ratings and broader-site relationships were not promoted."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "google-west-memphis-campus",
      "parent_id": null,
      "record_unit": "campus",
      "current_name": "Google West Memphis Campus",
      "state": "AR",
      "city": "West Memphis",
      "county": "Crittenden",
      "developer": null,
      "operator": null,
      "lifecycle_status": "construction",
      "status_basis": "The Arkansas Economic Development Commission described Google's West Memphis campus as under construction on October 2, 2025. An Arkansas Public Service Commission filing identifies Altitude, LLC, called Google for that filing, as the utility customer for the project. Neither record establishes current operation.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "campus",
        "aggregation_allowed": false,
        "note": "No primary-source critical IT capacity, approved utility-service capacity or measured-load figure was established."
      },
      "location": {
        "address": null,
        "city": "West Memphis",
        "county": "Crittenden",
        "precision": "approximate",
        "note": "Official state, utility and municipal pages place the campus in West Memphis and Crittenden County. No reconciled street address, parcel or exact coordinates are published here."
      },
      "physical_scale": "AEDC described a site of more than 1,000 acres. This is a qualified land-area statement, not a building count or capacity figure.",
      "sources": [
        {
          "title": "Google locating new data center in West Memphis, Arkansas",
          "url": "https://www.arkansasedc.com/news-events/newsroom/detail/2025/10/02/google-locating-new-data-center-in-west-memphis--arkansas-with-multi-billion-dollar-investment",
          "type": "state economic-development agency release",
          "published": "2025-10-02",
          "retrieved": "2026-09-13",
          "locator": "Opening project description and paragraph beginning 'Google is constructing'",
          "supports": "Google campus identity, West Memphis location, agency-described construction status as of October 2, 2025 and more-than-1,000-acre site scope.",
          "source_type": "government"
        },
        {
          "title": "Arkansas PSC docket 25-055-P, document 27",
          "url": "http://www.apscservices.info/pdf/25/25-055-P_27_1.pdf",
          "type": "utility commission filing",
          "published": "2025-09-09",
          "retrieved": "2026-09-13",
          "locator": "PDF pp. 2–3, paragraphs 2–3",
          "supports": "Altitude, LLC/Google identity and Entergy Arkansas special-rate application for the West Memphis hyperscale project. It is a request, not an approval order.",
          "source_type": "government"
        },
        {
          "title": "Entergy Arkansas data center projects",
          "url": "https://www.entergy.com/datacenters/arkansas",
          "type": "utility project page",
          "published": null,
          "retrieved": "2026-09-13",
          "locator": "Projects we're serving — Google in West Memphis",
          "supports": "Google campus identity in Crittenden County. Statewide forecasts and savings statements are not attributed to this campus.",
          "source_type": "utility"
        }
      ],
      "confidence": "high",
      "missing_evidence": [
        "street address",
        "parcel identifiers",
        "exact coordinates",
        "land owner",
        "developer",
        "operator",
        "building count",
        "critical IT capacity",
        "approved utility service",
        "opening or completion date"
      ],
      "history": [
        {
          "date": "2025-09-09",
          "summary": "Entergy Arkansas filed its special-rate application for the Altitude, LLC/Google project."
        },
        {
          "date": "2025-10-02",
          "summary": "AEDC described the West Memphis campus as under construction."
        },
        {
          "date": "2026-09-13",
          "field": "publication",
          "summary": "Added as one construction-stage campus after fresh review of state, utility-commission and utility sources; unverified building, parcel and capacity details were excluded."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "hostdime-eatonville-fl",
      "parent_id": null,
      "record_unit": "building",
      "current_name": "HostDime AI/Data Center",
      "state": "FL",
      "city": "Eatonville",
      "county": "Orange",
      "developer": null,
      "operator": "HostDime",
      "lifecycle_status": "construction",
      "status_basis": "A July 7, 2026 Town of Eatonville council packet scheduled HostDime to provide updates on construction and opening. An August 18, 2026 municipal meeting page again listed a HostDime construction update. These records support construction, not completion or operation.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "building",
        "aggregation_allowed": false,
        "note": "No primary-source critical IT capacity, utility-service capacity, generation or measured-load figure was established."
      },
      "location": {
        "address": null,
        "city": "Eatonville",
        "county": "Orange",
        "precision": "approximate",
        "note": "The council packet places the facility in Eatonville along the I-4 corridor. No street address, parcel or exact coordinates are published here."
      },
      "physical_scale": "No independently supported square footage or building subdivision is published here.",
      "sources": [
        {
          "title": "Town of Eatonville regular council meeting packet — July 7, 2026",
          "url": "https://mccmeetings.blob.core.usgovcloudapi.net/eatnvllefl-pubu/MEET-Packet-18ea706721f246eeb06a4e6f326d1ce9.pdf",
          "type": "municipal council packet",
          "published": "2026-07-07",
          "retrieved": "2026-09-13",
          "locator": "PDF pp. 1, 5 and 21; agenda items IV.C and VIII.2",
          "supports": "HostDime AI/Data Center name, Eatonville/Orange County location and a construction-and-opening status update. The HostDime item cover sheet's isolated 2025 date is treated as a template typo because the meeting-level record says 2026.",
          "source_type": "government"
        },
        {
          "title": "Town of Eatonville regular council meeting — August 18, 2026",
          "url": "https://meetings.municode.com/adaHtmlDocument/index?cc=EATNVLLEFL&ip=True&me=48bad7579e704836a36f95d5acc1edb9",
          "type": "official municipal meeting page",
          "published": "2026-08-18",
          "retrieved": "2026-09-13",
          "locator": "Presentations and Recognition, item C",
          "supports": "Later municipal listing for a HostDime construction update. It does not establish a meeting outcome, completion or operation.",
          "source_type": "government"
        }
      ],
      "confidence": "high",
      "missing_evidence": [
        "street address",
        "parcel identifiers",
        "exact coordinates",
        "land owner",
        "developer",
        "critical IT capacity",
        "utility service capacity",
        "building square footage",
        "opening or completion date",
        "operating evidence"
      ],
      "history": [
        {
          "date": "2026-07-07",
          "summary": "Town council packet scheduled a HostDime update on construction and opening."
        },
        {
          "date": "2026-08-18",
          "summary": "Town meeting page again listed a HostDime construction update."
        },
        {
          "date": "2026-09-13",
          "field": "publication",
          "summary": "Added as one construction-stage building after fresh review of the municipal packet and meeting page; directory naming, capacity and opening claims were excluded."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "stream-stamp-alabama-ny",
      "parent_id": null,
      "record_unit": "project",
      "current_name": "STREAM U.S. Data Centers at STAMP (Project Double Reed)",
      "state": "NY",
      "city": "Alabama",
      "county": "Genesee",
      "developer": "Stream Data Centers",
      "operator": null,
      "lifecycle_status": "proposed",
      "status_basis": "Genesee County Economic Development Center's current project page says STREAM U.S. Data Centers, LLC is proposing a 2.2 million-square-foot data center at STAMP and lists review material through August 24, 2026. No reviewed record establishes final approval, construction or operation of the revised 2026 project.",
      "capacity": {
        "value": 500,
        "unit": "MW",
        "kind": "utility_request",
        "scope": "full_buildout",
        "qualifier": "approximately",
        "aggregation_allowed": false,
        "note": "Applicant-estimated utility power requirement in the April 6, 2026 filing; not critical IT capacity, approved or contracted service, measured load or current consumption."
      },
      "location": {
        "address": null,
        "city": "Alabama",
        "county": "Genesee",
        "precision": "approximate",
        "note": "The official filings place the proposal at the STAMP site in the Town of Alabama. No reconciled street address, parcel or exact coordinates are published here."
      },
      "physical_scale": "The April 6 filing describes approximately 2.2 million square feet in three planned two-story buildings, about 90 acres of permanent development, about 40 acres of temporary construction-logistics areas and about 5 acres of off-site telecommunications easements. These scopes are separate and the planned buildings are not operating facilities.",
      "sources": [
        {
          "title": "GCEDC projects — STREAM U.S. Data Centers, LLC",
          "url": "https://www.gcedc.com/projects",
          "type": "county economic-development project index",
          "published": null,
          "retrieved": "2026-09-13",
          "locator": "2026 Projects; STREAM U.S. Data Centers, LLC",
          "supports": "Current proposal status, company, 2.2-million-square-foot scope, STAMP location and project-review documents through August 24, 2026.",
          "source_type": "government"
        },
        {
          "title": "STREAM U.S. Data Centers revised SEQR application — April 6, 2026",
          "url": "https://www.gcedc.com/file-library/100319/STREAMUSDataCentersLLC.SEQRDevelopmentApplication.4.6.26.IandII.IntroductionandProjectDescription.pdf",
          "type": "county-hosted environmental review application",
          "published": "2026-04-06",
          "retrieved": "2026-09-13",
          "locator": "PDF p. 2, A State-of-the-Art Data Center Campus; Infrastructure / Energy Strategy",
          "supports": "Revised proposal identity; three planned two-story buildings; permanent, temporary and easement land scopes; applicant-estimated approximately 500 MW utility power requirement.",
          "source_type": "government"
        },
        {
          "title": "GCEDC statement regarding STREAM U.S. Data Centers",
          "url": "https://www.gcedc.com/news/article/current/2025/09/18/100144/statement-regarding-stream-u.s.-data-centers",
          "type": "county economic-development statement",
          "published": "2025-09-18",
          "retrieved": "2026-09-13",
          "locator": "Full three-paragraph statement",
          "supports": "Rescission of the earlier March 2025 approval after Stream said it would not proceed with the earlier plan. The revised 2026 proposal is not an approved carry-forward.",
          "source_type": "government"
        }
      ],
      "confidence": "high",
      "missing_evidence": [
        "street address",
        "parcel identifiers",
        "exact coordinates",
        "land owner",
        "operator or tenant",
        "critical IT capacity",
        "approved or contracted utility service",
        "construction evidence",
        "opening or completion date"
      ],
      "history": [
        {
          "date": "2025-09-18",
          "summary": "GCEDC rescinded its decision on Stream's earlier project configuration pending review of modifications."
        },
        {
          "date": "2026-04-06",
          "summary": "Stream filed the revised project description used for the current physical and utility-request scopes."
        },
        {
          "date": "2026-09-13",
          "field": "publication",
          "summary": "Added as one proposed project after fresh review of current GCEDC materials; the rescinded 2025 configuration was not counted separately and 500 MW was typed only as an applicant estimate."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "project-bedrock-nampa-id",
      "parent_id": null,
      "record_unit": "building",
      "current_name": "Project Bedrock",
      "state": "ID",
      "city": "Nampa",
      "county": null,
      "developer": null,
      "operator": null,
      "owner": "Qlevr Data Center",
      "tenant": "T5 Data Centers",
      "lifecycle_status": "approved",
      "status_basis": "The City of Nampa's April 2026 permit report records commercial building permit COM-05271-2026 as issued on April 30, 2026 for an existing-warehouse upfit as a data center. Permit issuance establishes approval only; no opened primary record establishes work commencement, completion or operation.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "building",
        "aggregation_allowed": false,
        "note": "No MW value appears in the opened City records; figures from non-qualifying sources are excluded."
      },
      "location": {
        "address": "8300 Birch Ln",
        "city": "Nampa",
        "county": null,
        "precision": "exact",
        "note": "Street address is established by City records. Parcel ID is withheld because the hearing notice and annual planning report print conflicting strings."
      },
      "physical_scale": "One existing-warehouse upfit on a 7.60-acre parcel. Parcel acreage is not campus acreage or electrical capacity.",
      "sources": [
        {
          "title": "City of Nampa permit activity report — April 2026",
          "url": "https://www.cityofnampa.us/DocumentCenter/View/20607/Monthly-Activity-Report---April-2026",
          "type": "city building-permit activity report",
          "published": null,
          "retrieved": "2026-09-13",
          "locator": "PDF p. 2, permit COM-05271-2026; issue date, project name, scope, Owner 1, contractor and tenant rows",
          "supports": "Building identity, address, issued-permit status, data-center use, existing-warehouse unit boundary, owner label and tenant/contractor roles.",
          "source_type": "permit"
        },
        {
          "title": "City of Nampa Planning and Zoning hearing notice — August 26, 2025",
          "url": "https://www.cityofnampa.us/AgendaCenter/ViewFile/Agenda/_08262025-3390",
          "type": "municipal planning notice",
          "published": "2025-08-08",
          "retrieved": "2026-09-13",
          "locator": "PDF p. 1, CUP-00387-2025",
          "supports": "Data-center proposal, T5 applicant-representative relationship, address and 7.60-acre parcel scope.",
          "source_type": "government"
        }
      ],
      "confidence": "high",
      "missing_evidence": [
        "county",
        "resolved parcel identifier",
        "coordinates",
        "operator",
        "developer",
        "critical IT capacity",
        "utility service or request capacity",
        "work-start evidence",
        "certificate of occupancy or opening date"
      ],
      "history": [
        {
          "date": "2026-04-30",
          "summary": "City permit report records COM-05271-2026 as issued for the data-center upfit."
        },
        {
          "date": "2026-09-13",
          "field": "publication",
          "summary": "Added as one approved building after separate review of City permit and planning records; non-official capacity and construction claims were excluded."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "apple-maiden-nc",
      "parent_id": null,
      "record_unit": "campus",
      "current_name": "Apple Maiden Data Center Campus",
      "state": "NC",
      "city": "Maiden",
      "county": "Catawba",
      "developer": null,
      "operator": "Apple",
      "owner": null,
      "lifecycle_status": "operating",
      "status_basis": "Catawba County's June 23, 2026 statement says Apple opened its first North American data center campus in Maiden more than a decade earlier. The source establishes an opened Apple campus at city/county precision but not an exact opening date, address, parcel or physical scale.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "campus",
        "aggregation_allowed": false,
        "note": "No data-center MW value appears in the opened County source; adjacent generation is not campus capacity."
      },
      "location": {
        "address": null,
        "city": "Maiden",
        "county": "Catawba",
        "precision": "approximate",
        "note": "The County statement supports Maiden and Catawba County only. No address, parcel or coordinate was independently established."
      },
      "physical_scale": "Unknown; the opened County source supplies no building count, square footage, acreage or MW value.",
      "sources": [
        {
          "title": "Catawba County joint statement on data center development",
          "url": "https://www.catawbacountync.gov/news/joint-statement-on-microsoft-data-center-development-in-catawba-county/",
          "type": "county government statement",
          "published": "2026-06-23",
          "retrieved": "2026-09-13",
          "locator": "Paragraph beginning 'Catawba County is not new to data center development'; Apple/Maiden sentence and surrounding existing-site context",
          "supports": "Campus identity, Apple role, Maiden/Catawba location and opened/operating lifecycle basis.",
          "source_type": "government"
        }
      ],
      "confidence": "high",
      "missing_evidence": [
        "street address",
        "parcel",
        "coordinates",
        "developer",
        "legal property owner",
        "critical IT capacity",
        "utility service or request capacity",
        "building count",
        "exact opening date"
      ],
      "history": [
        {
          "date": "2026-09-13",
          "field": "publication",
          "summary": "Added as one operating campus at Maiden/Catawba precision after separate review of the County statement; directory address, date, capacity and scale details were excluded."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "beale-project-pilot-de-soto-ks",
      "parent_id": null,
      "record_unit": "campus",
      "current_name": "Beale Data Center",
      "state": "KS",
      "city": "De Soto",
      "county": null,
      "developer": "Mount Sunflower LLC",
      "operator": null,
      "owner": null,
      "lifecycle_status": "construction",
      "status_basis": "The City of De Soto's current Beale project page says grading and early site preparation are underway; its general data-center page labels Beale's status Site Preparation / Grading. The same project page says the Phase 1 site plan for Buildings 1 and 2 has conditional City approval. This establishes bounded site work, not completed buildings or operation.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "campus",
        "aggregation_allowed": false,
        "note": "No MW value appears in the opened City pages. Planned buildings are physical scale, not power capacity."
      },
      "location": {
        "address": null,
        "city": "De Soto",
        "county": null,
        "precision": "approximate",
        "note": "Flint Commerce Center at 103rd Street and Edgerton Road. No street address, parcel, coordinates or explicit county site locator was independently established."
      },
      "physical_scale": "Up to four data center buildings planned in phases; the conditionally approved Phase 1 site plan covers Buildings 1 and 2. This is a campus-design count, not an operating-facility count.",
      "sources": [
        {
          "title": "City of De Soto — Beale Data Center",
          "url": "https://www.desotoks.us/496/Beale-Data-Center",
          "type": "city project status page",
          "published": null,
          "retrieved": "2026-09-13",
          "locator": "Project Snapshot; Project Overview & Approvals; Developer & Operations",
          "supports": "Campus identity, development-agreement counterparty, developer role, site description, planned building scope, Phase 1 approval, grading/site-preparation status and unknown tenant/operator boundary.",
          "source_type": "government"
        },
        {
          "title": "City of De Soto — Data Centers",
          "url": "https://www.desotoks.us/465/Data-Centers",
          "type": "city project overview",
          "published": null,
          "retrieved": "2026-09-13",
          "locator": "Current and Proposed Projects; Projects at a Glance table, Beale column",
          "supports": "Beale Infrastructure/Mount Sunflower alias relationship, Flint Commerce Center, Site Preparation / Grading status and up-to-four-building campus design.",
          "source_type": "government"
        }
      ],
      "confidence": "high",
      "missing_evidence": [
        "street address",
        "parcel",
        "coordinates",
        "county site locator",
        "owner",
        "named tenant or operator",
        "critical IT capacity",
        "utility service or request capacity",
        "building completion",
        "opening date"
      ],
      "history": [
        {
          "date": "2026-09-13",
          "field": "publication",
          "summary": "Added as one construction-stage campus after separate review of current City pages; planned buildings were kept out of operating-facility counts and operator identity remains unknown."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "cumulus-buffalo-data-center-wv",
      "parent_id": null,
      "record_unit": "project",
      "current_name": "Cumulus Group LLC Buffalo Data Center",
      "state": "WV",
      "city": "Buffalo",
      "county": "Putnam",
      "developer": null,
      "operator": null,
      "lifecycle_status": "proposed",
      "status_basis": "West Virginia DEP lists Cumulus Group LLC's R13-3782 construction-permit application as received July 22, 2026. The application says Cumulus proposes a new data center in Buffalo, Putnam County. A pending application is not an issued permit and does not establish construction or operation.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "site",
        "aggregation_allowed": false,
        "note": "The application lists proposed emergency and auxiliary generators. Their ratings are generation equipment, not critical IT capacity, utility service, measured load or evidence of operation. No project-capacity figure is published."
      },
      "location": {
        "address": null,
        "city": "Buffalo",
        "county": "Putnam",
        "precision": "approximate",
        "note": "The project description says Buffalo, Putnam County; the form gives the new-site address as TBD. No parcel or validated coordinates are published here."
      },
      "physical_scale": "The application describes eight planned data-center buildings plus ancillary buildings. This is one project record, not eight completed or operating facility records.",
      "sources": [
        {
          "title": "West Virginia DEP permit application R13-3782 — Cumulus Group LLC",
          "url": "https://apps.dep.wv.gov/Documents/DAQ/NSRPermits/079-00208/Draft/079-00208APP.pdf",
          "type": "pending state air-permit application",
          "published": null,
          "retrieved": "2026-09-13",
          "locator": "Project Description, first two paragraphs; WVDEP Section I items 1, 4, 5B, 8 and 12B–D",
          "supports": "Applicant and project identity, proposal wording, Buffalo/Putnam location boundary, TBD site address, applicant's land-ownership statement and eight planned data-center buildings.",
          "source_type": "permit"
        },
        {
          "title": "West Virginia DEP New Source Review permit applications",
          "url": "https://dep.wv.gov/daq/permitting/Pages/NSR-Permit-Applications.aspx",
          "type": "state environmental pending-application register",
          "published": null,
          "retrieved": "2026-09-13",
          "locator": "Cumulus Group LLC; Buffalo entry — permit R13-3782, facility 079-00208, permit type Construction, application received 07/22/2026",
          "supports": "Current pending-application listing and received date; the permit type does not establish permit issuance or construction.",
          "source_type": "government"
        }
      ],
      "confidence": "high",
      "missing_evidence": [
        "street address",
        "parcel identifier",
        "validated coordinates",
        "issued permit or approval",
        "construction or operation evidence",
        "developer",
        "operator or tenant",
        "independent land-ownership record",
        "critical IT capacity",
        "utility request or service capacity",
        "identity resolution against the reported Google Putnam County project"
      ],
      "history": [
        {
          "date": "2026-07-22",
          "summary": "West Virginia DEP records receipt of permit application R13-3782."
        },
        {
          "date": "2026-09-13",
          "field": "publication",
          "summary": "Added as one proposed project from the live application and pending register; generator ratings and a possible Google relationship were not promoted."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "meta-gallatin-tn",
      "parent_id": null,
      "record_unit": "campus",
      "current_name": "Meta Gallatin Data Center",
      "state": "TN",
      "city": "Gallatin",
      "county": "Sumner",
      "developer": null,
      "operator": "Meta",
      "lifecycle_status": "operating",
      "status_attribution": "operator-reported",
      "status_basis": "Meta's November 14, 2024 operator post says the Gallatin Data Center was serving traffic. Tennessee's August 12, 2020 economic-development announcement independently establishes the Gallatin site and says construction had begun. Operation is operator-reported, not an independently inspected current-status finding.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "campus",
        "aggregation_allowed": false,
        "note": "No primary-source critical IT, utility-service, utility-request, gross-facility or measured-load figure was established. Renewable-generation figures in the sources cover projects beyond this campus and are not campus capacity."
      },
      "location": {
        "address": null,
        "city": "Gallatin",
        "county": "Sumner",
        "precision": "approximate",
        "note": "The state announcement places the data center in the Gallatin Industrial Park and identifies Sumner County. No street address, parcel or exact coordinates are published here."
      },
      "physical_scale": "The 2020 state announcement described a 982,000-square-foot facility under construction. This is a dated announced scope, not a current completed-floor-area finding or a building count.",
      "sources": [
        {
          "title": "Tennessee announcement of Facebook's Gallatin data center",
          "url": "https://tnecd.com/news/governor-lee-commissioner-rolfe-announce-facebook-to-build-800-million-data-center-in-gallatin/",
          "type": "state economic-development announcement",
          "published": "2020-08-12",
          "retrieved": "2026-09-13",
          "locator": "Announcement body, paragraph beginning 'Construction has just begun'; Gallatin Industrial Park and Sumner County paragraphs",
          "supports": "Facebook/Gallatin site identity, construction milestone, industrial-park and county location, and dated 982,000-square-foot announced scope. Regional solar generation is not campus capacity.",
          "source_type": "government"
        },
        {
          "title": "Meta Gallatin status post — Gallatin, we are online",
          "url": "https://datacenters.atmeta.com/2024/11/gallatin-we-are-online/",
          "type": "operator status post",
          "published": "2024-11-14",
          "retrieved": "2026-09-13",
          "locator": "Opening paragraph beginning 'Meta is thrilled'; following paragraph beginning 'When we first announced'",
          "supports": "Current Meta/Gallatin naming and Meta's statement that the data center was serving traffic. This is an operator disclosure, not independent operating verification.",
          "source_type": "company"
        }
      ],
      "confidence": "high",
      "missing_evidence": [
        "street address",
        "parcel identifier",
        "exact coordinates",
        "land or building owner",
        "developer",
        "tenant",
        "independent current operating confirmation",
        "critical IT capacity",
        "utility request or service capacity",
        "measured load",
        "building count",
        "current completed floor area"
      ],
      "history": [
        {
          "date": "2020-08-12",
          "summary": "Tennessee announced that construction had begun on Facebook's Gallatin data center."
        },
        {
          "date": "2024-11-14",
          "summary": "Meta reported that the Gallatin Data Center was serving traffic."
        },
        {
          "date": "2026-09-13",
          "field": "publication",
          "summary": "Added as one campus record; operating status remains visibly operator-attributed and regional renewable-generation figures were excluded from campus capacity."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "applied-digital-polaris-forge-2-harwood-nd",
      "parent_id": null,
      "record_unit": "campus",
      "current_name": "Polaris Forge 2",
      "state": "ND",
      "city": null,
      "county": null,
      "developer": null,
      "operator": null,
      "lifecycle_status": "construction",
      "status_basis": "Applied Digital's Form 10-Q filed April 8, 2026 says the Polaris Forge 2 project near Harwood had begun; Note 14 says the campus was currently under construction. Expected future online dates are forecasts and do not establish operation.",
      "capacity": {
        "value": 200,
        "unit": "MW",
        "kind": "critical_it",
        "scope": "phase",
        "aggregation_allowed": false,
        "note": "The filing describes a data-center lease to deliver 200 MW of critical IT load to an unnamed hyperscaler, phased across the initial two buildings. This is contracted future critical IT load, not current or measured load, utility-service capacity or an entire future-campus total."
      },
      "location": {
        "address": null,
        "city": null,
        "county": null,
        "precision": "approximate",
        "note": "The SEC filing says near Harwood, North Dakota and elsewhere calls it the company's campus in Harwood. It gives no street address, parcel, county or coordinates; Harwood is retained only in the stable ID as the source's place label."
      },
      "physical_scale": "The leased initial 200 MW is phased across two buildings expected to come online in 2026. These are planned construction-phase buildings, not two operating facilities and not a complete campus building count.",
      "sources": [
        {
          "title": "Applied Digital Form 10-Q for the quarter ended February 28, 2026",
          "url": "https://www.sec.gov/Archives/edgar/data/1144879/000114487926000030/apld-20260228.htm",
          "type": "SEC-filed quarterly report",
          "published": "2026-04-08",
          "retrieved": "2026-09-13",
          "locator": "Part I, Item 2, HPC Data Center Hosting Business, paragraph beginning 'On August 18, 2025'; Note 14, Leases — Lessor Accounting, paragraph beginning 'On October 20, 2025'",
          "supports": "Polaris Forge 2 name and near-Harwood location, project-begun/currently-under-construction statements, APLD FAR-01 LLC and APLD FAR-02 LLC as lessor subsidiaries, unnamed hyperscaler tenant boundary, two-building phase and leased 200 MW critical IT-load scope.",
          "source_type": "docket"
        }
      ],
      "confidence": "high",
      "missing_evidence": [
        "street address",
        "parcel identifier",
        "county and municipal situs",
        "exact coordinates",
        "ultimate land or campus owner",
        "developer role",
        "operator role",
        "hyperscaler tenant identity",
        "utility request or approved service capacity",
        "measured load",
        "construction permit or inspection",
        "current completion or operating evidence",
        "full-campus design capacity beyond the initial phase"
      ],
      "history": [
        {
          "date": "2025-10-20",
          "summary": "Applied Digital subsidiaries entered the filed lease for 200 MW of critical IT load at Polaris Forge 2."
        },
        {
          "date": "2026-04-08",
          "summary": "Applied Digital filed the Form 10-Q describing Polaris Forge 2 as under construction."
        },
        {
          "date": "2026-09-13",
          "field": "publication",
          "summary": "Added as one construction-stage campus; the lease-backed 200 MW was scoped to the initial two-building phase and developer, operator, owner and tenant identities remain unresolved."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "related-digital-cheyenne-wy",
      "parent_id": null,
      "record_unit": "campus",
      "current_name": "Related Digital Cheyenne Data Center Campus",
      "state": "WY",
      "city": "Cheyenne",
      "county": null,
      "developer": "Related Digital",
      "operator": null,
      "owner": null,
      "tenant": "CoreWeave",
      "lifecycle_status": "construction",
      "status_basis": "The Wyoming Business Council's May 2026 program catalog says Related Digital is currently under construction in Cheyenne and was certified in 2025 for the Data Center Sales Tax Exemption. The expected late-2026 completion of the first facility is a forecast, not evidence of completion or operation.",
      "capacity": {
        "value": 302,
        "unit": "MW",
        "kind": "critical_it",
        "scope": "campus",
        "aggregation_allowed": false,
        "qualifier": "up to",
        "note": "The source expressly labels this as up to 302 MW of IT capacity for the planned campus. It is a construction-stage design scope, not current energized IT load, measured load, generation or approved utility service."
      },
      "location": {
        "address": null,
        "city": "Cheyenne",
        "county": null,
        "precision": "approximate",
        "note": "The Wyoming Business Council catalog places the campus in Cheyenne Business Parkway. It does not provide a street address, parcel, county or coordinates."
      },
      "physical_scale": "A planned 115-acre campus; the first planned facility is 184,000 square feet. These are planned construction-stage dimensions, not completed floor area or a total building count.",
      "sources": [
        {
          "title": "Wyoming Business Council Programs & Service Catalog — May 2026",
          "url": "https://wyoleg.gov/InterimCommittee/2026/09-202606049-05WBCMaterialsPreparedforJointMinerals06052026.pdf",
          "type": "state legislative-hosted economic-development program catalog",
          "published": null,
          "retrieved": "2026-09-13",
          "locator": "Data Center Sales Tax Exemption Eligibility Certification; Recipient Reports & Related Resources; PDF/printed page 9; Related Digital paragraph",
          "supports": "Campus identity, Related Digital developer role, Cheyenne Business Parkway location, construction status, 2025 incentive certification, 115-acre planned campus, up-to-302-MW IT-capacity scope, first 184,000-square-foot planned facility, forecast completion and CoreWeave anchor-tenant role.",
          "source_type": "government"
        }
      ],
      "confidence": "high",
      "missing_evidence": [
        "street address",
        "parcel",
        "county site locator",
        "coordinates",
        "land or building owner",
        "operator",
        "utility request or approved service capacity",
        "current or measured IT load",
        "total building count",
        "work-start date",
        "completion or opening evidence"
      ],
      "history": [
        {
          "date": "2026-09-13",
          "field": "publication",
          "summary": "Added as one construction-stage campus; the 302 MW and first-facility figures remain explicitly planned rather than current or operating."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "brookfield-paducah-site-ai-campus-ky",
      "parent_id": null,
      "record_unit": "campus",
      "current_name": "Paducah Site AI/HPC Innovation Campus",
      "state": "KY",
      "city": null,
      "county": null,
      "developer": "Brookfield",
      "operator": "Brookfield",
      "owner": null,
      "tenant": null,
      "lifecycle_status": "proposed",
      "status_basis": "The U.S. Department of Energy's July 29, 2026 announcement establishes a partnership and says Brookfield was selected to develop and operate a data center campus on portions of the Paducah Site. It does not say campus construction started, and the power-service agreement remained subject to Kentucky Public Service Commission approval. The expected 2031 completion is a forecast.",
      "capacity": {
        "value": 1800,
        "unit": "MW",
        "kind": "company_design",
        "scope": "campus",
        "aggregation_allowed": false,
        "note": "DOE describes a new 1.8 GW AI/HPC campus but does not label the figure critical IT load, gross facility load, approved utility service, measured load or current consumption. It is retained only as an announced campus design."
      },
      "location": {
        "address": null,
        "city": null,
        "county": null,
        "precision": "approximate",
        "note": "The announcement limits the location to portions of DOE's Paducah Site in western Kentucky. The federal site's proper name is not converted into a city, street address, county, parcel or coordinate."
      },
      "physical_scale": "Unknown. The announcement provides no data-center building count, floor area, site acreage or parcel boundary. The announced investment and job estimates are not physical scale.",
      "sources": [
        {
          "title": "Energy Department Announces Partnership to Expand Reliable, Affordable Energy Access and Power America's AI Future in Western Kentucky",
          "url": "https://www.energy.gov/articles/energy-department-announces-partnership-expand-reliable-affordable-energy-access-and-power",
          "type": "federal agency project announcement",
          "published": "2026-07-29",
          "retrieved": "2026-09-13",
          "locator": "Opening paragraph; ratepayer-protection paragraph; participant-selection paragraph; final construction-forecast sentence",
          "supports": "Campus proposal and Paducah Site location boundary; Brookfield's selected future developer/operator roles; announced 1.8-GW AI/HPC campus design; separate generation and storage roles; pending PSC approval; forecast 2031 completion.",
          "source_type": "government"
        }
      ],
      "confidence": "high",
      "missing_evidence": [
        "street address",
        "parcel",
        "city and county situs for the selected campus portions",
        "coordinates",
        "data-center land or building owner",
        "tenant",
        "critical IT capacity",
        "gross facility load",
        "approved utility-service amount",
        "measured load",
        "Kentucky PSC case number and decision",
        "building count or floor area",
        "construction-start evidence",
        "completion or opening evidence"
      ],
      "history": [
        {
          "date": "2026-07-29",
          "summary": "DOE announced the Paducah partnership and participant selections; the power-service agreement remained subject to Kentucky PSC approval."
        },
        {
          "date": "2026-09-13",
          "field": "publication",
          "summary": "Added as one proposed campus; the 1.8 GW remains an announced design figure and separate generation and storage figures were excluded."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "meta-tulsa-ok",
      "parent_id": null,
      "record_unit": "project",
      "current_name": "Meta Tulsa Data Center",
      "state": "OK",
      "city": "Tulsa",
      "county": null,
      "developer": null,
      "operator": "Meta",
      "owner": null,
      "tenant": null,
      "lifecycle_status": "construction",
      "status_basis": "The Oklahoma Department of Commerce's April 21, 2026 announcement says state and local leaders joined Meta to break ground on the company's Tulsa data center. A documented groundbreaking establishes construction commencement, not completion or operation.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "site",
        "aggregation_allowed": false,
        "note": "The government source gives no data-center MW value. More than 1,500 MW in the release concerns separate clean-energy projects adding energy to Oklahoma's grid, not this data center's IT capacity, service capacity, request or measured load."
      },
      "location": {
        "address": null,
        "city": "Tulsa",
        "county": null,
        "precision": "approximate",
        "note": "The announcement places the project at Fair Oaks industrial innovation park in East Tulsa. It supplies no street address, parcel, county or coordinates."
      },
      "physical_scale": "The planned project will span more than 2 million square feet. This is announced future scope, not completed floor area or a building count. The separately stated 2,000 acres belong to Fair Oaks industrial innovation park, not the Meta site.",
      "sources": [
        {
          "title": "Meta Breaks Ground on New $1 Billion Data Center in Tulsa",
          "url": "https://www.okcommerce.gov/meta-breaks-ground-on-data-center-in-tulsa/",
          "type": "state economic-development construction announcement",
          "published": "2026-04-21",
          "retrieved": "2026-09-13",
          "locator": "Opening groundbreaking paragraph; Tulsa Data Center jobs paragraph; Fair Oaks/East Tulsa paragraph; PSO and clean-energy paragraphs",
          "supports": "Meta/Tulsa project identity, April 21 groundbreaking, construction lifecycle, East Tulsa/Fair Oaks approximate location, planned more-than-2-million-square-foot scope, Meta's project-company and park-anchor-tenant relationship, and separation of grid-energy projects from data-center capacity.",
          "source_type": "government"
        }
      ],
      "confidence": "high",
      "missing_evidence": [
        "street address",
        "parcel",
        "county",
        "coordinates",
        "land or building owner",
        "developer",
        "data-center tenant boundary",
        "critical IT capacity",
        "utility request or approved service capacity",
        "measured load",
        "site acreage",
        "building count",
        "construction permit or inspection",
        "completion or opening evidence"
      ],
      "history": [
        {
          "date": "2026-04-21",
          "summary": "Oklahoma Commerce documented the Tulsa data-center groundbreaking."
        },
        {
          "date": "2026-09-13",
          "field": "publication",
          "summary": "Added as one construction-stage project; grid-energy capacity and industrial-park acreage were excluded from the data-center record."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "al-bessemer-land-data-center",
      "parent_id": null,
      "record_unit": "project",
      "current_name": "AL Bessemer Land Data Center Project",
      "state": "AL",
      "city": "Bessemer",
      "county": "Jefferson",
      "developer": null,
      "operator": null,
      "owner": null,
      "tenant": null,
      "lifecycle_status": "approved",
      "status_attribution": "zoning approval only",
      "status_basis": "City of Bessemer Ordinance No. 3698, adopted and approved April 21, 2026, rezones the described property from A-1 vacant Agricultural to I-1 Light Industrial for construction and operation of a multi-phased data center. This establishes zoning approval only; the opened record does not establish a building permit, construction, completion or operation.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "site",
        "aggregation_allowed": false,
        "note": "No data-center MW figure appears in the opened City record. Reported campus-design or utility figures from non-qualifying sources are excluded."
      },
      "location": {
        "address": null,
        "city": "Bessemer",
        "county": "Jefferson",
        "precision": "approximate",
        "note": "The ordinance lists five addresses plus parts of five tax parcels in Sections 26 and 27, Township 19S, Range 5 West. Because this is a multi-address, partial-parcel zoning area, no single project address or coordinate is asserted."
      },
      "physical_scale": "The ordinance calls the approved land use a multi-phased data center but provides no phase count, building count, floor area, site acreage or electrical scale.",
      "sources": [
        {
          "title": "City of Bessemer City Clerk — AL Bessemer Land LLC Rezoning Ordinance",
          "url": "https://bessemeral.org/departments/city-clerk",
          "type": "municipal ordinance publication page",
          "published": "2026-04-21",
          "retrieved": "2026-09-13",
          "locator": "Link labeled 'AL Bessemer Land LLC Rezoning Ordinance'; linked scanned Ordinance No. 3698, PDF p. 1 first WHEREAS and Section 1; p. 2 Sections 2 and 4/adoption block; p. 3 mayoral approval",
          "supports": "City publication provenance; application filer and owner-field wording; data-center land use; Bessemer/Jefferson location; listed addresses and partial parcels; rezoning adoption and approval date.",
          "source_type": "government"
        }
      ],
      "confidence": "high",
      "missing_evidence": [
        "single site address or complete parcel boundary",
        "coordinates",
        "separately verified property owner",
        "developer",
        "operator or tenant",
        "critical IT capacity",
        "utility request or approved service capacity",
        "building count or floor area",
        "building permit or construction start",
        "completion or opening evidence"
      ],
      "history": [
        {
          "date": "2026-04-21",
          "summary": "City of Bessemer adopted and approved Ordinance No. 3698 for the multi-phased data-center land use."
        },
        {
          "date": "2026-09-13",
          "field": "publication",
          "summary": "Added as one zoning-approved project; company identity, construction, acreage and capacity claims remain excluded."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "global-ai-weld-county-co",
      "parent_id": null,
      "record_unit": "project",
      "current_name": "Global AI (Colorado), LLC Data Center Project",
      "state": "CO",
      "city": null,
      "county": "Weld",
      "developer": null,
      "operator": null,
      "owner": null,
      "tenant": null,
      "lifecycle_status": "approved",
      "status_attribution": "land-use approval only",
      "status_basis": "Weld County says its Board of County Commissioners voted 5-0 on September 9, 2026 to approve Use by Special Review permit USR26-0019 for Global AI (Colorado), LLC. The County says the USR supplies the required land-use approval and that all required construction-related permits and approvals must still be obtained. This is land-use approval, not construction or operation.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "site",
        "aggregation_allowed": false,
        "note": "The opened County decision publishes no critical-IT, facility-load, utility-service, utility-request, generation or measured-load figure."
      },
      "location": {
        "address": null,
        "city": null,
        "county": "Weld",
        "precision": "approximate",
        "note": "The County locates the approved reuse in an existing light-industrial area near Windsor. It does not provide a street address, parcel or coordinate, and 'near Windsor' is not converted into City of Windsor situs."
      },
      "physical_scale": "The approved proposal reuses an existing vacant industrial manufacturing facility. The County says future expansion beyond that proposal requires additional review; no acreage, floor area or data-center building count is published.",
      "sources": [
        {
          "title": "Weld County Commissioners approve Global AI data center permit",
          "url": "https://www.weld.gov/Newsroom/2026-News/Weld-County-Commissioners-approve-Global-AI-data-center-permit",
          "type": "county land-use decision page",
          "published": "2026-09-10",
          "retrieved": "2026-09-13",
          "locator": "Opening four paragraphs; 'What approval means' section",
          "supports": "Global AI (Colorado), LLC applicant identity; USR26-0019; September 9 Board vote; approved land use; existing-facility reuse near Windsor; additional-permit and future-expansion boundaries.",
          "source_type": "government"
        }
      ],
      "confidence": "high",
      "missing_evidence": [
        "street address",
        "parcel",
        "municipal situs",
        "coordinates",
        "property owner",
        "developer",
        "current operator or tenant",
        "critical IT capacity",
        "utility request or approved service capacity",
        "building permit or construction start",
        "completion or opening evidence"
      ],
      "history": [
        {
          "date": "2026-09-09",
          "summary": "Weld County commissioners approved Use by Special Review permit USR26-0019 by a 5-0 vote."
        },
        {
          "date": "2026-09-13",
          "field": "publication",
          "summary": "Added as one land-use-approved reuse project; construction, operation, capacity and operator remain unproven."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "rifle-range-road-data-center-mo",
      "parent_id": null,
      "record_unit": "project",
      "current_name": "Rifle Range Road Data Center Project",
      "state": "MO",
      "city": null,
      "county": "Webster",
      "developer": null,
      "operator": null,
      "owner": null,
      "tenant": null,
      "lifecycle_status": "construction",
      "status_attribution": "county-reported · 21 May 2026",
      "status_basis": "The Webster County Commission's May 21, 2026 update describes a data-center project as currently under construction on Rifle Range Road in rural Webster County, north and east of the City of Marshfield. This establishes a dated construction-stage project; it does not establish completion, operation or current progress after that statement.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "site",
        "aggregation_allowed": false,
        "note": "The opened County update publishes no critical-IT, facility-load, utility-service, utility-request, generation or measured-load figure."
      },
      "location": {
        "address": null,
        "city": null,
        "county": "Webster",
        "precision": "approximate",
        "note": "Rifle Range Road in rural Webster County, north and east of Marshfield. The source does not provide a street number, parcel or coordinate and does not place the project inside the City of Marshfield."
      },
      "physical_scale": "Unknown. The County update gives no campus label, building count, floor area, acreage or phase scope.",
      "sources": [
        {
          "title": "Webster County Commission — Data Center Update — May 21",
          "url": "https://webstercountymo.gov/commission-data-center-update-may-21/",
          "type": "county commission project update",
          "published": "2026-05-21",
          "retrieved": "2026-09-13",
          "locator": "Opening paragraph; later paragraph distinguishing the McDonald County facility from the local project",
          "supports": "Existence of one local data-center project; dated construction lifecycle; Rifle Range Road/rural Webster County location north and east of Marshfield; explicit non-equivalence to the compared McDonald County facility.",
          "source_type": "government"
        }
      ],
      "confidence": "high",
      "missing_evidence": [
        "project legal name",
        "street number",
        "parcel",
        "municipal situs",
        "coordinates",
        "owner",
        "developer",
        "operator or tenant",
        "critical IT capacity",
        "utility request or approved service capacity",
        "building count, floor area or acreage",
        "permit or inspection identifier",
        "current progress, completion or opening evidence"
      ],
      "history": [
        {
          "date": "2026-05-21",
          "summary": "Webster County described the Rifle Range Road data-center project as under construction."
        },
        {
          "date": "2026-09-13",
          "field": "publication",
          "summary": "Added as one dated construction-stage project; party identities, current progress, capacity and physical scale remain unknown."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "osmium-data-center-west-des-moines",
      "parent_id": null,
      "record_unit": "operating_facility",
      "current_name": "Osmium Data Center",
      "state": "IA",
      "city": "West Des Moines",
      "county": "Warren",
      "developer": null,
      "operator": null,
      "owner": null,
      "tenant": null,
      "lifecycle_status": "operating",
      "status_attribution": "permit-defined existing facility",
      "status_basis": "Iowa DNR's September 12, 2024 notice says the application was submitted to operate an existing Computer Processing and Data Preparation and Processing Services facility. Iowa DNR issued final Title V Operating Permit 24-TV-004 on October 17, 2024 for Osmium Data Center at 5855 SW Kerry St; the permit expires October 16, 2029. This establishes an existing permit-defined facility and an unexpired air-operating permit, not current IT load, every-building operation or continuous occupancy.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "site",
        "aggregation_allowed": false,
        "note": "No critical-IT, facility-load, utility-service, utility-request or measured-load MW is published in the opened records. Emergency-generator and emissions information is excluded."
      },
      "location": {
        "address": "5855 SW Kerry St, West Des Moines, IA 50061",
        "city": "West Des Moines",
        "county": "Warren",
        "precision": "exact",
        "note": "Exact address of the permit-defined facility. No parcel or coordinate is asserted. The responsible official's 550 SE White Crane Road mailing address is not this facility's site address."
      },
      "physical_scale": "Unknown. The primary records do not establish building count, campus boundary, floor area or acreage.",
      "sources": [
        {
          "title": "Iowa DNR Title V Operating Permit 24-TV-004 — Osmium Data Center",
          "url": "https://www.iowadnr.gov/media/6245/download?inline",
          "type": "issued Title V air operating permit",
          "published": "2024-10-17",
          "retrieved": "2026-09-13",
          "locator": "PDF cover: facility name, facility location, permit number, expiration and renewal deadline; cover signature/date block",
          "supports": "Permit-defined identity and address; issuance date; unexpired air-operating permit through 2029.",
          "source_type": "permit"
        },
        {
          "title": "Iowa DNR — Air quality permits for review, published 09/12/2024",
          "url": "https://www.iowadnr.gov/news-release/2024-09-12/air-quality-permits-review-published-09122024",
          "type": "state-agency public notice",
          "published": "2024-09-12",
          "retrieved": "2026-09-13",
          "locator": "Title V Operating Permits > Warren County; the two Osmium Data Center paragraphs",
          "supports": "Warren County placement, facility name/address, and the statement that the application was submitted to operate the existing data-processing facility.",
          "source_type": "government"
        }
      ],
      "confidence": "high",
      "missing_evidence": [
        "parcel",
        "coordinates",
        "developer",
        "owner",
        "operator or tenant",
        "critical IT capacity",
        "utility request or approved service capacity",
        "measured load",
        "building count, floor area or acreage",
        "opening or completion date"
      ],
      "history": [
        {
          "date": "2024-09-12",
          "summary": "Iowa DNR published the draft Title V notice for an existing facility."
        },
        {
          "date": "2024-10-17",
          "summary": "Iowa DNR issued Title V Operating Permit 24-TV-004."
        },
        {
          "date": "2026-09-13",
          "field": "publication",
          "summary": "Added as one permit-defined existing facility; party roles, physical scale and data-center capacity remain unknown."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "amazon-falls-township-data-center",
      "parent_id": null,
      "record_unit": "project",
      "current_name": "Amazon Falls Township Data Center Project",
      "state": "PA",
      "city": "Falls Township",
      "county": "Bucks",
      "developer": null,
      "operator": null,
      "owner": null,
      "tenant": null,
      "lifecycle_status": "approved",
      "status_attribution": "land-development approval only",
      "status_basis": "Falls Township says Amazon announced its intent to construct a data center and plans an innovation campus on part of Keystone Trade Center. It also says the Falls Supervisors approved two preliminary and final land-development plans in March 2025, including conversion of Building 6 to a data center and a Phase 2 digital-infrastructure campus. This establishes local land-development approval, not construction, completion, energization or operation.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "site",
        "aggregation_allowed": false,
        "note": "The opened Township record publishes no critical-IT, facility-load, utility-service, utility-request, generation or measured-load MW."
      },
      "location": {
        "address": null,
        "city": "Falls Township",
        "county": "Bucks",
        "precision": "approximate",
        "note": "The official page names approved-plan components at 1 Ben Fairless Drive and 700 S. Port Road. Because it joins two revisions into the local project account, no single street address, parcel or coordinate is asserted for this project unit."
      },
      "physical_scale": "The Township says one plan changes Building 6 at 1 Ben Fairless Drive to a data center. Separately, the 700 S. Port Road Phase 2 revision changes a 247-acre parcel from four distribution centers to 10 planned one- or two-story structures of 112,000–217,000 square feet each and more than 2 million square feet total, described as a digital-infrastructure campus. These are planned/approved figures, not built or operating inventory. The 1,800-acre Keystone Trade Center is broader than this project.",
      "sources": [
        {
          "title": "Amazon to Open Data Center at NorthPoint Development in Falls",
          "url": "https://www.fallstwp.com/resources/news/article/?id=10070",
          "type": "township land-development and project announcement page",
          "published": "2025-06-09",
          "retrieved": "2026-09-13",
          "locator": "Article body paragraphs 1–4: Amazon intent; local innovation-campus description; March approval of two preliminary and final land-development plans; Building 6 and 700 S. Port Road Phase 2 revisions",
          "supports": "Amazon project identity; Falls Township/Bucks County; approval-stage boundary; plan-component addresses; narrowly scoped planned physical scale; Keystone Trade Center/NorthPoint context.",
          "source_type": "government"
        }
      ],
      "confidence": "high",
      "missing_evidence": [
        "single project address or complete parcel crosswalk",
        "coordinates",
        "property owner",
        "bounded data-center developer role",
        "operator or tenant",
        "critical IT capacity",
        "utility request or approved service capacity",
        "building permit or construction start",
        "current progress, completion, energization or operation"
      ],
      "history": [
        {
          "date": "2025-03",
          "summary": "Falls Supervisors approved two preliminary and final land-development plan revisions."
        },
        {
          "date": "2025-06-09",
          "summary": "Falls Township published Amazon's local data-center/innovation-campus announcement."
        },
        {
          "date": "2026-09-13",
          "field": "publication",
          "summary": "Added as one land-development-approved project; construction, operating roles and capacity remain unproven."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "amazon-vicksburg-project-ms",
      "parent_id": null,
      "record_unit": "project",
      "current_name": "Amazon Vicksburg Project",
      "state": "MS",
      "city": "Vicksburg",
      "county": null,
      "developer": null,
      "operator": null,
      "owner": null,
      "tenant": null,
      "lifecycle_status": "proposed",
      "status_attribution": "state-announced plan only",
      "status_basis": "The Mississippi Development Authority's April 9, 2026 publication says that in November 2025 Amazon announced a planned $3 billion project in Vicksburg, within its account of Amazon's Mississippi cloud and data-center expansion. This establishes an announced planned project only; it does not establish local approval, permitting, construction, completion, energization or operation.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "site",
        "aggregation_allowed": false,
        "note": "The opened MDA publication gives no critical-IT, facility-load, utility-service, utility-request, generation or measured-load MW for Vicksburg."
      },
      "location": {
        "address": null,
        "city": "Vicksburg",
        "county": null,
        "precision": "approximate",
        "note": "The project paragraph names Vicksburg but gives no site, address, parcel or coordinate."
      },
      "physical_scale": "Unknown. The MDA publication gives no campus boundary, building count, floor area, acreage, phase count or electrical scale for Vicksburg.",
      "sources": [
        {
          "title": "Amazon continues Mississippi expansion, announcing plans to invest a total of $25 billion across the Magnolia State",
          "url": "https://mississippi.org/news/amazon-continues-mississippi-expansion-announcing-plans-to-invest-a-total-of-25-billion-across-the-magnolia-state/",
          "type": "state economic-development authority project announcement",
          "published": "2026-04-09",
          "retrieved": "2026-09-13",
          "locator": "Article body: paragraph beginning 'In November 2025' and the immediately following paragraph identifying Amazon Web Services as Amazon's cloud and data-center operations",
          "supports": "Amazon identity, Vicksburg location, planned/proposed lifecycle, and data-center/cloud-project context.",
          "source_type": "government"
        }
      ],
      "confidence": "high",
      "missing_evidence": [
        "street address",
        "parcel and exact county assignment",
        "coordinates",
        "developer",
        "property owner",
        "operator or tenant",
        "critical IT capacity",
        "utility request or approved service capacity",
        "building count, floor area or acreage",
        "local approval or permit",
        "construction start, completion, energization or operation"
      ],
      "history": [
        {
          "date": "2025-11",
          "summary": "MDA says Amazon announced the planned Vicksburg project in November 2025."
        },
        {
          "date": "2026-04-09",
          "summary": "MDA published its current account of the planned Vicksburg project."
        },
        {
          "date": "2026-09-13",
          "field": "publication",
          "summary": "Added as one state-announced proposed project; site, county, roles, approvals and capacity remain unknown."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "jp-morgan-chase-cdc-1-bear-de",
      "parent_id": null,
      "record_unit": "operating_facility",
      "current_name": "JP Morgan Chase CDC 1",
      "state": "DE",
      "city": "Bear",
      "county": "New Castle",
      "developer": null,
      "operator": null,
      "owner": null,
      "tenant": null,
      "lifecycle_status": "operating",
      "status_attribution": "DNREC permit-defined existing facility; dated operating-facility evidence, not real-time IT utilization",
      "status_basis": "DNREC's December 2021 review memorandum calls JP Morgan Chase CDC 1 a Tier 4 data center and states that existing Permit APC-2003/0285-OPERATION (Amendment 4) allowed the facility to operate 12 existing emergency generators. DNREC's May 2026 annual program report still lists JP Morgan Chase - Bear Christiana Road among the facilities billed for calendar year 2025. This establishes a permit-defined existing operating facility and continuing regulatory identity; it does not establish current IT load, occupancy, uptime, every-building operation, or issuance of the opened Amendment 5 draft.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "site",
        "aggregation_allowed": false,
        "note": "No opened record publishes critical-IT, gross-facility, utility-request, utility-service, generation-MW, or measured-load capacity. Heat-input and emissions limits for emergency generators are excluded."
      },
      "location": {
        "address": "501 Bear Christiana Road, Bear, DE 19701",
        "city": "Bear",
        "county": "New Castle",
        "precision": "exact",
        "note": "Exact permit facility address. Bear is retained as the permit postal place; a DNREC public notice also calls it a Newark facility, so no incorporated-municipality claim is made."
      },
      "physical_scale": "Unknown. The opened records do not establish data-center building count, floor area, parcel, acreage, campus boundary, or IT scale. Twelve permitted emergency generators are equipment, not a building count or data-center capacity figure.",
      "sources": [
        {
          "title": "DNREC — Title V Synthetic Minor Permit Applications: JP Morgan",
          "url": "https://dnrec.delaware.gov/public-notices/title-v-synthetic-minor-permit-applications-jp-morgan/",
          "type": "state air-permit public notice",
          "published": "2021-12-12",
          "retrieved": "2026-09-14",
          "locator": "Page header and body paragraphs beginning 'Notice is hereby given'; paragraph naming draft permit APC-2003/0285-OPERATION(SM)(NSPS)(A5)",
          "supports": "JPMorgan facility identity, 501 Bear Christiana Road, permit-amendment proceeding, and draft-permit identifier. It does not prove Amendment 5 was issued.",
          "source_type": "permit"
        },
        {
          "title": "DNREC draft Amendment 5 and review memorandum — JP Morgan Chase CDC 1",
          "url": "https://docs.dnrec.delaware.gov/render/2446576/c1b1b6791dc007b72fdca01fd2ea9fa568f551cf506d18581b522a1ea65cf5e667aa6b87b38cb1b1246515c1c0b04ca1/",
          "type": "state permit file",
          "published": "2021-12-12",
          "retrieved": "2026-09-14",
          "locator": "PDF cover; draft permit printed p. 1 and administrative condition 7.1; review memorandum printed p. 1 Background; applicability discussion naming New Castle County",
          "supports": "CDC 1/Core Data Center 1 names, exact address, permit-defined existing facility, existing Amendment 4, New Castle County, and the emergency-equipment boundary.",
          "source_type": "permit"
        },
        {
          "title": "DNREC — Annual Title V Fee Committee Status Report 2025",
          "url": "https://documents.dnrec.delaware.gov/Air/Title-V/Fee-Committee/2025-Title-V-Fee-Committee-Status-Report.pdf",
          "type": "state air-program report",
          "published": null,
          "retrieved": "2026-09-14",
          "locator": "Appendix B, printed p. 29 / PDF p. 33, states that its table uses CY2025 data for each billed facility; facility table, printed p. 33 / PDF p. 37, row 'JP Morgan Chase - Bear Christiana Road'",
          "supports": "Continued DNREC program identity through the calendar-year-2025 reporting cycle. Program effort hours are not facility runtime, uptime, or computing load.",
          "source_type": "government"
        }
      ],
      "confidence": "high",
      "missing_evidence": [
        "parcel and coordinates",
        "incorporated municipal situs",
        "developer, property owner, operator, and tenant",
        "critical-IT or gross-facility capacity",
        "utility request or approved service capacity",
        "measured load or current IT utilization",
        "building count, floor area, and acreage",
        "final disposition of draft Amendment 5"
      ],
      "history": [
        {
          "date": "2021-12-08",
          "summary": "DNREC's review memorandum described the existing facility and Amendment 4 operating permit."
        },
        {
          "date": "2026-05",
          "summary": "DNREC's May 2026 annual program report retained the Bear Christiana Road facility identity."
        },
        {
          "date": "2026-09-14",
          "field": "publication",
          "summary": "Added as one permit-defined existing facility; current IT use, roles, scale and capacity remain unknown."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "mghpcc-holyoke-ma",
      "parent_id": null,
      "record_unit": "building",
      "current_name": "Massachusetts Green High Performance Computing Center",
      "state": "MA",
      "city": "Holyoke",
      "county": null,
      "developer": null,
      "operator": null,
      "owner": "Massachusetts Green High Performance Computing",
      "tenant": null,
      "lifecycle_status": "operating",
      "status_attribution": "UMass Amherst service report dated 2026-04-19",
      "status_basis": "UMass Amherst Information Technology reported that the MGHPCC data center's computer floor and services lost power on April 19, 2026, that power was restored, and that Unity returned to service that afternoon. A Massachusetts government release separately describes MGHPCC in Holyoke as a research data center serving researchers. This supports operating status on the dated service event, not real-time continuous operation, every system, or full utilization on the retrieval date.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "building",
        "aggregation_allowed": false,
        "note": "No capacity is published from the selected records. The intake's 15 MW value is not carried because its precise critical-IT, gross-facility, design, or current-load scope was not established from these sources."
      },
      "location": {
        "address": "100 Bigelow St, Holyoke, MA 01040",
        "city": "Holyoke",
        "county": null,
        "precision": "exact",
        "note": "MassGIS FY2026 parcel 020-02-003 / LOC_ID F_355950_2900713. No coordinate is asserted."
      },
      "physical_scale": "MassGIS FY2026 assessor fields report BLD_AREA 91,700 square feet, LOT_SIZE 1.66 acres, and YEAR_BUILT 2012 for parcel 020-02-003. These are assessor fields for this parcel/building, not white-space area, commissioned IT area, a campus total, or a count of the owner's other parcels.",
      "sources": [
        {
          "title": "MassGIS Standardized Parcels with Assessor Data — parcel 020-02-003",
          "url": "https://arcgisserver.digital.mass.gov/arcgisserver/rest/services/AGOL/L3_Parcels_FeatureService_4326/FeatureServer/1/query?where=MAP_PAR_ID%3D%27020-02-003%27&outFields=MAP_PAR_ID%2CLOC_ID%2CSITE_ADDR%2CCITY%2CZIP%2COWNER1%2CUSE_CODE%2CLOT_SIZE%2CBLD_AREA%2CYEAR_BUILT%2CFY&returnGeometry=false&f=json",
          "type": "state parcel GIS",
          "published": null,
          "retrieved": "2026-09-14",
          "locator": "features[0].attributes for MAP_PAR_ID=020-02-003; FY=2026",
          "supports": "Exact address, parcel/LOC_ID, assessor owner label, building-area field, lot-size field, year-built field.",
          "source_type": "gis"
        },
        {
          "title": "UMass Amherst IT — Resolved: Unity Service Restored, 4/19",
          "url": "https://www.umass.edu/it/news/resolved-unity-service-restored-419",
          "type": "official public-university service report",
          "published": "2026-04-19",
          "retrieved": "2026-09-14",
          "locator": "Service Report; paragraphs beginning 'As of 4:45 p.m.', 'At 2:18 a.m.', and 'All services at MGHPCC'",
          "supports": "MGHPCC data-center identity and a dated operational/service-restoration event. It does not establish continuous current status or capacity.",
          "source_type": "government"
        },
        {
          "title": "Massachusetts State Library archive — Governor's Massachusetts AI Hub release",
          "url": "https://archives.lib.state.ma.us/bitstreams/aadd15a4-d44c-4840-ab62-0c5760e12763/download",
          "type": "state-government release preserved by the State Library",
          "published": "2024-12-19",
          "retrieved": "2026-09-14",
          "locator": "PDF p. 1 MGHPCC partnership paragraph; PDF pp. 4–5 Massachusetts Green High Performance Computing Center section",
          "supports": "Current name/acronym, Holyoke, research-data-center identity, joint-venture context, and active researcher use as of the publication date. It does not identify the 100 Bigelow parcel or assign operator/tenant roles.",
          "source_type": "government"
        },
        {
          "title": "Massachusetts Supplier Diversity Office — May 2026 news and events",
          "url": "https://www.mass.gov/doc/may/download",
          "type": "state-government newsletter",
          "published": null,
          "retrieved": "2026-09-14",
          "locator": "PDF p. 6, event Details block for Friday, May 15, 2026",
          "supports": "Exact Massachusetts Green High Performance Computing Center name and 100 Bigelow St, Holyoke address. The event listing does not establish owner, operator, tenant, capacity, utilization, scale, or continuous operation.",
          "source_type": "government"
        }
      ],
      "confidence": "high",
      "missing_evidence": [
        "county in the selected record payload",
        "coordinates",
        "developer, operator, and tenant",
        "owner legal-name or suffix confirmation beyond the assessor label",
        "critical-IT, gross-facility, utility-service, utility-request, and measured-load capacity",
        "white-space or commissioned-compute floor area",
        "campus boundary and relationship of the four other same-owner parcels",
        "continuous or current operation after the dated April 19, 2026 service event"
      ],
      "history": [
        {
          "date": "2024-12-19",
          "summary": "A Massachusetts government release described MGHPCC as a Holyoke research data center serving researchers."
        },
        {
          "date": "2026-04-19",
          "summary": "UMass Amherst IT reported power and service restoration at MGHPCC."
        },
        {
          "date": "2026-09-14",
          "field": "publication",
          "summary": "Added as one assessed building with dated operating evidence; current utilization and capacity remain unknown."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "gemini-addition-data-center-sioux-falls-sd",
      "parent_id": null,
      "record_unit": "project",
      "current_name": "Gemini Addition",
      "state": "SD",
      "city": "Sioux Falls",
      "county": "Minnehaha",
      "developer": null,
      "operator": null,
      "owner": null,
      "tenant": null,
      "lifecycle_status": "approved",
      "status_attribution": "municipal rezoning and preliminary-subdivision approval only",
      "status_basis": "On January 6, 2026, the Sioux Falls City Council adopted Ordinance 5-26 for rezoning petition 022049-2025 and adopted amended Resolution 4-26 approving the preliminary plan of Gemini Addition, with a domestic-water condition for any proposed data center. The City identifies Gemini Data Center SD, LLC – Michael Anvar as private applicant. This establishes rezoning and preliminary-plan approval only; it does not establish final plat or site-plan approval, building permits, construction, completion, energization, operation, or an end user.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "site",
        "aggregation_allowed": false,
        "note": "The reopened municipal records publish no critical-IT, gross-facility, utility-request, utility-service, generation, or measured-load MW. The reported 500 MW developer figure is excluded."
      },
      "location": {
        "address": null,
        "city": "Sioux Falls",
        "county": "Minnehaha",
        "precision": "approximate",
        "note": "Municipal records locate the preliminary subdivision south of E. Rice St. and east of Veterans Pkwy and provide a Section 31-T102N-R48W legal description. No street address, assessor parcel, or coordinate is asserted."
      },
      "physical_scale": "The preliminary-subdivision staff report states 164 acres for Gemini Addition. This is the plan area, not net data-center acreage, built area, building count, floor area, or capacity. The site was recorded as agricultural/undeveloped at that review stage.",
      "sources": [
        {
          "title": "Sioux Falls Planning Commission — Gemini Addition preliminary subdivision staff report",
          "url": "https://amv.siouxfalls.gov/OnBaseAgendaOnline/Documents/DownloadFileBytes/SUB-P-022062-2025%20-%20Gemini%20Addition%20-%20Rice%20_%20Veterans%20%28Data%20Center%29.pdf.pdf?documentType=1&isAttachment=True&isSection=False&itemId=192696&meetingId=4175&publishId=155952",
          "type": "municipal planning record",
          "published": "2025-12-02",
          "retrieved": "2026-09-14",
          "locator": "Staff-report header and summary; printed pp. 1–3: project name, application type, Owner/Applicant label, purpose, location/legal description, 164-acre area, agricultural/undeveloped existing use, and later-stage review notes",
          "supports": "Stable project identity, one preliminary-subdivision unit, applicant label, bounded location, plan area, and pre-construction stage.",
          "source_type": "government"
        },
        {
          "title": "Sioux Falls City Council minutes — January 6, 2026",
          "url": "https://amv.siouxfalls.gov/OnBaseAgendaOnline/Meetings/ViewMeeting?doctype=2&id=4182",
          "type": "adopted municipal minutes, ordinance, and resolution record",
          "published": "2026-01-06",
          "retrieved": "2026-09-14",
          "locator": "Item 33, adoption of Ordinance 5-26 for petition 022049-2025; Item 39, amended vote and adopted Resolution 4-26; resolution text and domestic-water condition",
          "supports": "Final municipal rezoning action, approved preliminary plan, applicant label, data-center purpose, and the approval-only lifecycle boundary.",
          "source_type": "government"
        }
      ],
      "confidence": "high",
      "missing_evidence": [
        "street address, assessor parcel, and coordinates",
        "separate property-owner, developer, operator, and tenant roles",
        "end user",
        "critical-IT or gross-facility capacity",
        "utility request or approved service capacity",
        "measured load",
        "data-center building count or floor area",
        "final plat or final site-plan approval",
        "building permit, construction start, completion, energization, or operation"
      ],
      "history": [
        {
          "date": "2025-12-02",
          "summary": "The Planning Commission staff report documented the Gemini Addition preliminary subdivision application."
        },
        {
          "date": "2026-01-06",
          "summary": "Sioux Falls adopted the rezoning ordinance and approved the amended preliminary plan."
        },
        {
          "date": "2026-09-14",
          "field": "publication",
          "summary": "Added as one rezoning and preliminary-plan-approved project; construction, end user, roles and capacity remain unknown."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "meta-rosemount-data-center-mn",
      "parent_id": null,
      "record_unit": "campus",
      "current_name": "Meta Rosemount Data Center",
      "state": "MN",
      "city": "Rosemount",
      "county": "Dakota",
      "developer": null,
      "operator": null,
      "owner": null,
      "tenant": null,
      "lifecycle_status": "construction",
      "status_attribution": "current City of Rosemount FAQ, corroborated by city and public-university records",
      "status_basis": "The City of Rosemount's current water-supply FAQ says the data center in Rosemount is under construction, and the city's development page crosswalks Bigfoot/Jimnist to Meta. The city's 2024 Annual Comprehensive Financial Report describes the 280-acre Meta/Jimnist project as under construction. The University of Minnesota Office of General Counsel says the 280-acre sale to Jimnist closed December 29, 2023, identifies Meta Platforms, Inc. as Jimnist's parent, and says a data center was being constructed on the property. This supports construction on the current municipal statement; it does not establish completion, energization, operation, tenant use, or continuous progress.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "campus",
        "aggregation_allowed": false,
        "note": "No selected publication source states critical-IT, gross-facility, utility-request, utility-service, generation, or measured-load MW."
      },
      "location": {
        "address": null,
        "city": "Rosemount",
        "county": "Dakota",
        "precision": "approximate",
        "note": "The city places the 280-acre project in UMore Park directly east of Dakota County Technical College. No street address, parcel identifier, or coordinate is asserted."
      },
      "physical_scale": "The City of Rosemount's 2024 Annual Comprehensive Financial Report describes a 280-acre project and a 715,000-square-foot data center under construction. These are source-reported project figures, not surveyed current built area, commissioned IT space, a building count, or capacity.",
      "sources": [
        {
          "title": "City of Rosemount FAQ — Public Works / Water Quality",
          "url": "https://rosemountmn.gov/m/faq?cat=20",
          "type": "current municipal status page",
          "published": null,
          "retrieved": "2026-09-14",
          "locator": "Question 'How will data centers and new industrial business affect Rosemount’s water supply?', first sentence",
          "supports": "Current municipal construction statement only.",
          "source_type": "government"
        },
        {
          "title": "City of Rosemount — Development in Rosemount",
          "url": "https://www.rosemountmn.gov/920/Development-in-Rosemount",
          "type": "municipal development page",
          "published": null,
          "retrieved": "2026-09-14",
          "locator": "Welcome, Meta! opening paragraph",
          "supports": "Bigfoot/Jimnist/Meta name crosswalk, Rosemount, and data-center purpose.",
          "source_type": "government"
        },
        {
          "title": "City of Rosemount — Annual Comprehensive Financial Report for year ended December 31, 2024",
          "url": "https://www.rosemountmn.gov/DocumentCenter/View/7992",
          "type": "municipal annual comprehensive financial report",
          "published": "2025-07-28",
          "retrieved": "2026-09-14",
          "locator": "PDF p. 12 / printed p. iii, Factors Affecting Financial Condition — Local Economy",
          "supports": "Meta/Jimnist identity, 280-acre project figure, 715,000-square-foot project figure and dated construction description.",
          "source_type": "government"
        },
        {
          "title": "University of Minnesota Office of General Counsel Annual Report 2024",
          "url": "https://pub.umn.edu/ogc/ogc-ar-2024/files/basic-html/page6.html",
          "type": "official public-university annual report",
          "published": "2024",
          "retrieved": "2026-09-14",
          "locator": "p. 6, Sale of 280 Acres of University’s UMore Park Land",
          "supports": "Sale closing, Jimnist purchaser, Meta parent relationship, and dated construction statement.",
          "source_type": "government"
        }
      ],
      "confidence": "high",
      "missing_evidence": [
        "street address, parcel crosswalk, and coordinates",
        "current property title after the December 2023 sale",
        "separate developer, owner, operator, and tenant assignments",
        "critical-IT, gross-facility, utility-service, utility-request, generation, and measured-load capacity",
        "commissioning, energization, completion, and operating evidence"
      ],
      "history": [
        {
          "date": "2023-12-29",
          "summary": "The University says its 280-acre sale to Jimnist LLC closed."
        },
        {
          "date": "2026-09-14",
          "field": "publication",
          "summary": "Qualified as one construction-stage campus; roles, capacity, exact parcel, completion, and operation remain unknown."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "dataone-vineland-ai-data-center-nj",
      "parent_id": null,
      "record_unit": "project",
      "current_name": "DataOne Vineland AI Data Center",
      "state": "NJ",
      "city": "Vineland",
      "county": null,
      "developer": null,
      "operator": null,
      "owner": null,
      "tenant": null,
      "lifecycle_status": "approved",
      "status_attribution": "City of Vineland Planning Board's June 26, 2025 amended preliminary/final major site-plan approval only",
      "status_basis": "The City of Vineland Planning Board's June 26, 2025 minutes identify NEP Real Estate's data-center application PBA-24-00028 on Block 7503, Lots 1.01 and 35.01, state that the project had been previously approved, and record a unanimous motion to approve the amended application. A March 2026 city notice and August 2026 continuation notice show a further amendment proceeding for the same physical project. This supports municipal site-plan approval only. Because the later hearing outcome and a reported stop-work action have not been resolved in a primary record, this record makes no current construction, completion, energization, or operation claim.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "site",
        "aggregation_allowed": false,
        "note": "The selected minutes contain applicant electrical-demand and on-site generation descriptions, but neither those statements nor the selected notices establish verified critical-IT, gross-facility, current utility-service, or measured-load MW. Company/news figures of 300 or 350 MW are excluded."
      },
      "location": {
        "address": null,
        "city": "Vineland",
        "county": null,
        "precision": "exact",
        "note": "City records identify Block 7503, Lot 35.01 and the southeast corner of Lincoln and Sheridan Avenues. Earlier and March 2026 filings include additional lots; the current August 2026 notice is limited to Lot 35.01. No street address or coordinate is asserted."
      },
      "physical_scale": "The June 2025 approved application concerned 3,129,726 square feet over three phases. The August 2026 pending amendment describes a different two-phase component program, so no single current floor-area total, building count, or built area is asserted.",
      "sources": [
        {
          "title": "City of Vineland Planning Board minutes — June 26, 2025 special meeting",
          "url": "https://www.vinelandcity.org/Archive/Planning%20Board/Minutes/2025/Minutes%206-26-25%20%28Special%20Meeting%29.pdf",
          "type": "adopted municipal planning minutes",
          "published": "2025-06-26",
          "retrieved": "2026-09-14",
          "locator": "Printed pp. 1–2, NEP Real Estate – Data Center PH 3 Amended; motion and 5–0 roll call",
          "supports": "Project/site identity, approval, location, applicant/partner labels, and approval-era scale.",
          "source_type": "government"
        },
        {
          "title": "City of Vineland Planning Board special-meeting notice — PBA-26-00001",
          "url": "https://www.vinelandcity.org/Archive/Planning%20Board/Agendas/2026/Agenda%203-26-26%20%28Special%20Meeting%29.pdf",
          "type": "municipal planning notice",
          "published": null,
          "retrieved": "2026-09-14",
          "locator": "p. 1, DataOne USA LLC, Block 7503/Lots 35.01 and 33.01, PBA-26-00001, and postponement",
          "supports": "Same-site amendment crosswalk and postponed proceeding only.",
          "source_type": "government"
        },
        {
          "title": "City of Vineland legal notice — August 17, 2026 continuation hearing",
          "url": "https://www.vinelandcity.org/wp-content/uploads/2026/08/Data-One-Meeting-Post-8.7.pdf",
          "type": "municipal planning legal notice",
          "published": null,
          "retrieved": "2026-09-14",
          "locator": "p. 1, lines 1–32, DataOne Vineland LLC continuation and Block 7503/Lot 35.01",
          "supports": "Latest applicant label, same-parcel continuation, and pending amendment components; not current construction status.",
          "source_type": "government"
        }
      ],
      "confidence": "high",
      "missing_evidence": [
        "street address, county field in the selected payload, and coordinates",
        "current parcel ownership",
        "corporate relationship among NEP Real Estate, Data One USA LLC, and DataOne Vineland LLC",
        "separate developer, operator, owner, and tenant assignments",
        "disposition/minutes for the August 17, 2026 continuation hearing",
        "primary stop-work record and current construction authorization/status",
        "critical-IT, gross-facility, utility-service, utility-request, generation, and measured-load capacity",
        "reconciled current plan scale",
        "completion, energization, and operation"
      ],
      "history": [
        {
          "date": "2025-06-26",
          "summary": "Planning Board unanimously approved the amended PBA-24-00028 application."
        },
        {
          "date": "2026-03-26",
          "summary": "A PBA-26-00001 further-amendment hearing was scheduled for this date; the selected notice says the application was postponed tentatively to May 28, 2026."
        },
        {
          "date": "2026-08-17",
          "summary": "A continuation hearing was scheduled for this date; its disposition is not yet in the opened record."
        },
        {
          "date": "2026-09-14",
          "field": "publication",
          "summary": "Qualified at approval only; current construction and applicant corporate-role crosswalk remain unresolved."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "google-papillion-data-center-ne",
      "parent_id": null,
      "record_unit": "campus",
      "current_name": "Google Papillion Data Center",
      "state": "NE",
      "city": "Papillion",
      "county": "Sarpy",
      "developer": null,
      "operator": null,
      "owner": null,
      "tenant": null,
      "lifecycle_status": "operating",
      "status_attribution": "Sarpy County operating statement dated 2021-12-20, corroborated by the City of Papillion permit-report snapshot dated 2026-04-21",
      "status_basis": "Sarpy County's 2021 annual report says Google's first data center in Papillion was already operational. The City of Papillion's April 21, 2026 building-permit report describes work inside Google's existing data centers at 14865 Gold Coast Road. Four cited rows have status Finaled and an Issued Date of April 6, 2026; that date is not a finaling date. A fifth row has status Issued and an Issued Date of April 1, 2026. This supports a campus with at least one operating data-center building on the dated records; it does not establish a finaling date, that every building or phase is complete or operating, real-time uptime, occupancy, or current IT load.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "campus",
        "aggregation_allowed": false,
        "note": "No selected record states critical-IT, gross-facility, utility-request, utility-service, generation, or measured-load MW. Permit voltage/equipment descriptions and utility system planning are not campus capacity."
      },
      "location": {
        "address": "14865 Gold Coast Rd, Papillion, NE",
        "city": "Papillion",
        "county": "Sarpy",
        "precision": "exact",
        "note": "Exact municipal permit address, cross-checked to the county's Papillion data-center identity. No coordinate or assessor parcel is asserted."
      },
      "physical_scale": "The April 2026 permit report references SRP2A, SRP3A, and SRP4A at the selected address and separately prints a 'PT Lot 1 Schram & Hwy 50 (260.98AC)' descriptor. These are source labels/site context only; they do not establish a complete building count, net campus acreage, floor area, commissioned IT area, or capacity.",
      "sources": [
        {
          "title": "Sarpy County — 2021 Annual Report: Sarpy's economic growth continues",
          "url": "https://www.sarpy.gov/m/newsflash/home/detail/113",
          "type": "county-government annual report",
          "published": "2021-12-20",
          "retrieved": "2026-09-14",
          "locator": "Google heading and sentence stating the first Papillion data center was already operational",
          "supports": "Google/Papillion identity, Sarpy County, and dated operation of at least one data center.",
          "source_type": "government"
        },
        {
          "title": "City of Papillion City Administrator Report — April 21, 2026",
          "url": "https://www.papillion.org/AgendaCenter/ViewFile/Agenda/_04212026-606?packet=true",
          "type": "municipal permit report in official agenda packet",
          "published": "2026-04-21",
          "retrieved": "2026-09-14",
          "locator": "PDF p. 8, Building Permits Report rows BLD-25-0444, BLD-25-0869, BLD-25-2750, BLD-25-4807, and BLD-26-1017",
          "supports": "Exact address, existing data-center identity, SRP labels, report-snapshot permit statuses, issued dates, work descriptions, and lot descriptor; not finaling dates.",
          "source_type": "permit"
        }
      ],
      "confidence": "high",
      "missing_evidence": [
        "assessor parcel and coordinates",
        "separate developer, operator, owner, and tenant assignments",
        "complete campus boundary and building inventory",
        "finaling dates for the permit rows marked Finaled",
        "critical-IT, gross-facility, utility-service, utility-request, generation, and measured-load capacity",
        "floor area and commissioned IT area",
        "current utilization, occupancy, and continuous operation"
      ],
      "history": [
        {
          "date": "2021-12-20",
          "summary": "Sarpy County reported Google's first Papillion data center already operational."
        },
        {
          "date": "2026-04-21",
          "summary": "Papillion's report snapshot marked four cited permit rows Finaled and one Issued; April 6 is the four Finaled permits' issued date, not their finaling date."
        },
        {
          "date": "2026-09-14",
          "field": "publication",
          "summary": "Qualified as one operating campus with at least one operating data-center building; complete campus scale, roles, and capacity remain unknown."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "stak-energy-campus-north-slope-ak",
      "parent_id": null,
      "record_unit": "campus",
      "current_name": "STAK Energy Campus",
      "state": "AK",
      "city": null,
      "county": "North Slope Borough",
      "developer": "STAK Energy Corporation",
      "operator": null,
      "owner": null,
      "tenant": null,
      "lifecycle_status": "proposed",
      "status_attribution": "Alaska DNR ADL 422741 preliminary state-land decision dated 2026-05-12",
      "status_basis": "Alaska DNR's Preliminary Decision says STAK Energy Corporation applied for a 50-year state-land lease and that the Division proposes to issue a negotiated lease for a commercial natural-gas-powered data-center/HPC campus. The decision is a preliminary best-interest finding that proceeded to public notice; a later official notice extended comments through July 17, 2026. DNR expressly says this is one component of a broader permitting process, that the final finding, entry authorization, perfected lease, pipeline right-of-way, air, water, wetlands and other approvals are separate, and that plan updates require written approval before construction. No selected record establishes the final finding, entry authorization, executed lease, construction, energization, completion, or operation.",
      "capacity": {
        "value": 3000,
        "unit": "MW",
        "kind": "onsite_generation_planned",
        "scope": "campus",
        "aggregation_allowed": false,
        "qualifier": "upper end of stated 1–3 GW design range",
        "note": "DNR describes a planned onsite natural-gas generation system designed for 1–3 GW and a behind-the-meter configuration in which the HPC facility would consume generated electricity onsite. 3,000 MW is only the upper end of that planned generation-design range. It is not critical-IT capacity, utility-request or approved-service capacity, measured or current load, grid export, built generation, permitted generation, or an aggregation input."
      },
      "location": {
        "address": null,
        "city": null,
        "county": "North Slope Borough",
        "precision": "approximate",
        "note": "Approximate proposed-site bounds from DNR's PLSS description and four approximate corner coordinates: approximately one mile west of Dalton Highway Milepost 390 and approximately 26 miles south of Deadhorse. This is not asserted as a surveyed or perfected lease boundary. No street address, city, centroid or third-party coordinate is published."
      },
      "physical_scale": "The proposed state surface-lease area is approximately 715.4 acres. DNR describes an approximately 640-acre principal gravel pad and a planned 1.8-mile gravel access road within the project description. These are proposed lease, pad and road figures, not developed acreage, data-hall area, floor area, building count, commissioned scale, or capacity.",
      "sources": [
        {
          "title": "Alaska DNR public notice — ADL 422741, STAK Energy Corporation",
          "url": "https://notice.alaska.gov/223817",
          "type": "state land public notice",
          "published": "2026-05-12",
          "retrieved": "2026-09-14",
          "locator": "Notice title and body; Attachments, History, Details; Publish Date; attachment 161957",
          "supports": "ADL identifier, applicant, preliminary lease action, requested term, lease area, location, proposed HPC/data-center use and future-final-decision boundary.",
          "source_type": "government"
        },
        {
          "title": "Alaska DNR Division of Oil and Gas — ADL 422741 Preliminary Decision",
          "url": "https://aws.state.ak.us/OnlinePublicNotices/Notices/Attachment.aspx?id=161957",
          "type": "state land preliminary decision",
          "published": "2026-05-12",
          "retrieved": "2026-09-14",
          "locator": "Printed pp. 1–2, 6–8, 11–12 and 16",
          "supports": "Official name crosswalk, applicant, campus unit, approximate proposed-site bounds, preliminary lifecycle, proposed physical scale, planned 1–3 GW onsite generation design, separate pipeline process and missing authorization boundaries.",
          "source_type": "government"
        },
        {
          "title": "Alaska DNR — ADL 422741 public-comment extension",
          "url": "https://notice.alaska.gov/224224",
          "type": "state land public notice",
          "published": "2026-06-17",
          "retrieved": "2026-09-14",
          "locator": "Notice body paragraph beginning 'Due to the significant public interest'; extended deadline; Details / Publish Date",
          "supports": "Continued preliminary/public-comment posture and extension through July 17, 2026; not later disposition.",
          "source_type": "government"
        }
      ],
      "confidence": "high",
      "missing_evidence": [
        "Final Finding and Decision and appeal record",
        "entry authorization and perfected lease",
        "separate pipeline right-of-way application and disposition",
        "required air, water, stormwater, fish-habitat, wetlands and federal approvals",
        "construction commencement or active building permits",
        "building count and floor area",
        "critical-IT, gross-facility, utility-request, utility-service and measured-load capacity",
        "project owner, current or future operator and tenant",
        "opening, energization, completion and operation"
      ],
      "history": [
        {
          "date": "2026-05-12",
          "summary": "Alaska DNR issued a preliminary decision proposing a negotiated state-land lease; this was not a final finding, lease or construction authorization."
        },
        {
          "date": "2026-06-17",
          "summary": "Alaska DNR extended the public-comment deadline through July 17, 2026."
        },
        {
          "date": "2026-09-14",
          "field": "publication",
          "summary": "Qualified as one proposed campus; final lease action, construction, operation, roles and IT capacity remain unknown."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "eternal-mind-loring-data-center-me",
      "parent_id": null,
      "record_unit": "building",
      "current_name": "Eternal Mind Loring Data Center Building",
      "state": "ME",
      "city": "Limestone",
      "county": null,
      "developer": null,
      "operator": null,
      "owner": null,
      "tenant": "Eternal Mind, Inc.",
      "lifecycle_status": "proposed",
      "status_attribution": "Loring Development Authority FY2023 tenant report and June 21, 2023 board minutes reporting a nine-year data-center-building lease",
      "status_basis": "The Loring Development Authority of Maine's FY2023 annual report lists Eternal Mind, Inc. in its Loring Commerce Centre tenant attachment and describes it as an AI quantum-computing company. LDA's June 21, 2023 board minutes report, as a Green 4 Maine accomplishment, a nine-year lease with Eternal Mind for the 8,000-square-foot Data Center building. This supports one lease/tenant-backed proposed building on dated public-authority records. It does not establish that the lease remains in force today, the lease start or end dates, regulatory approval, construction, commissioning, current occupancy, energization, or operation. The later FY2024 tenant attachment omits Eternal Mind but expressly warns that it may not list all subtenants of third-party owners such as Green 4 Maine; the omission therefore neither proves continued tenancy nor termination.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "building",
        "aggregation_allowed": false,
        "note": "No selected qualifying record states critical-IT, gross-facility, utility-request, utility-service, generation, company-design or measured-load MW. The 8,000-square-foot building figure is physical scale, not capacity."
      },
      "location": {
        "address": null,
        "city": "Limestone",
        "county": null,
        "precision": "approximate",
        "note": "Bounded only to Loring Commerce Centre in Limestone, Maine. The 154 Development Drive address in the June 2023 document is the board-meeting location, not the data-center building. No building number, street address, parcel, coordinate, or county field is asserted."
      },
      "physical_scale": "LDA board minutes describe one 8,000-square-foot Data Center building. This is a reported building area, not white space, commissioned compute area, occupied area, campus area, parcel area, building count beyond this one record, or MW capacity.",
      "sources": [
        {
          "title": "Loring Development Authority of Maine — 2023 Annual Report",
          "url": "https://legislature.maine.gov/doc/10592",
          "type": "public-authority annual report filed with the Maine Legislature",
          "published": null,
          "retrieved": "2026-09-14",
          "locator": "Printed p. 11, attachment 'Loring Commerce Centre Tenants,' Eternal Mind entry",
          "supports": "Eternal Mind tenant identity, AI quantum-computing description and Loring Commerce Centre crosswalk; not building address, size, capacity, operator or current operation.",
          "source_type": "government"
        },
        {
          "title": "Loring Development Authority of Maine board minutes — June 21, 2023",
          "url": "https://loringcommercecentre.com/wp-content/uploads/2024/05/LDA-of-Maine-June-21-2023-Minutes.pdf",
          "type": "public-authority board minutes",
          "published": "2023-06-21",
          "retrieved": "2026-09-14",
          "locator": "Printed p. 3, section 7 President's Report, Green 4 Maine update",
          "supports": "Reported nine-year lease with Eternal Mind and one 8,000-square-foot Data Center building; not lease dates, address, owner, operation, capacity, permit, construction or commissioning.",
          "source_type": "government"
        },
        {
          "title": "Loring Development Authority of Maine — 2024 Annual Report",
          "url": "https://legislature.maine.gov/doc/12569",
          "type": "public-authority annual report filed with the Maine Legislature",
          "published": "2026-06-04",
          "retrieved": "2026-09-14",
          "locator": "Printed p. 8, Green 4 Maine transaction; printed pp. 16–18, tenant attachment and completeness caveat",
          "supports": "Ownership-role caution and warning that the tenant list may omit Green 4 Maine subtenants; Eternal Mind's omission is not affirmative current-status evidence.",
          "source_type": "government"
        }
      ],
      "confidence": "high",
      "missing_evidence": [
        "executed lease text, commencement date, expiration date, amendments and current performance",
        "current tenancy, occupancy and operating status after FY2023",
        "building number, street address, parcel, coordinates and county field",
        "property owner and any relationship to the Green 4 Maine property transaction",
        "developer and operator",
        "critical-IT, gross-facility, utility-service, utility-request, generation and measured-load capacity",
        "white-space or commissioned-compute area",
        "permits, construction, commissioning, energization and opening evidence"
      ],
      "history": [
        {
          "date": "2023-06-21",
          "summary": "LDA board minutes reported a nine-year lease with Eternal Mind for an 8,000-square-foot Data Center building; lease commencement and expiration dates were not supplied."
        },
        {
          "date": "2026-09-14",
          "field": "publication",
          "summary": "Qualified as one proposed building from dated lease and tenant records; current tenancy, occupancy and operation remain unknown."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "gotspace-groton-data-center-project-ct",
      "parent_id": null,
      "record_unit": "project",
      "current_name": "Gotspace Groton Data Center Project",
      "state": "CT",
      "city": "Groton",
      "county": null,
      "developer": "Gotspace Data Partners LLC",
      "operator": null,
      "owner": null,
      "tenant": null,
      "lifecycle_status": "unknown",
      "status_attribution": "Town of Groton host-municipality agreement approved April 6, 2021; current project and agreement status not established",
      "status_basis": "A Town Council record says Groton approved a Host Municipality Fee Agreement with Gotspace Data Partners LLC on April 6, 2021, and the Town's published agreement identifies candidate parcels for one or more qualified data centers. The agreement contemplated later DECD, Planning and Zoning, building-permit and power-purchase steps; its power-purchase provision includes an election/notice mechanism and possible waiver. No opened official record established whether those steps were satisfied or waived, or a current 2026 project status. The agreement's 36-month provisions do not by themselves prove termination: failure to apply for permits allows Groton to terminate, while other termination mechanisms require specified events or notice. Therefore the current lifecycle is unknown, not proposed, approved, construction, operating, expired, or withdrawn.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "unknown",
        "aggregation_allowed": false,
        "note": "No selected official record states project critical-IT, utility-request, utility-service, generation, gross-facility, company-design, or measured-load MW. Agreement fee bands are hypothetical building categories, not this project's capacity."
      },
      "location": {
        "address": null,
        "city": "Groton",
        "county": null,
        "precision": "approximate",
        "note": "Bounded to candidate properties within the Town of Groton. The agreement lists six parcel/account references but permits substitutions and additions, so it does not establish a final facility footprint, street address, county field, or coordinates."
      },
      "physical_scale": "The agreement identifies an approximately 64.01-acre portion of one listed 0 Paulson Road account. This is one candidate parcel portion, not total project acreage, acquired land, a final site, floor area, building count, or capacity.",
      "sources": [
        {
          "title": "Town of Groton — Groton Data Center Host Municipality Fee Agreement",
          "url": "https://groton-ct.gov/news_detail_T8_R208.php",
          "type": "municipal notice page",
          "published": null,
          "retrieved": "2026-09-14",
          "locator": "Heading and body stating that the Town entered a host-municipality fee agreement for potential qualified data centers",
          "supports": "Dated agreement/project existence and Town-level location; not current lifecycle, permit, construction, operation, capacity, or ownership.",
          "source_type": "government"
        },
        {
          "title": "Town of Groton and Gotspace Data Partners LLC — Qualified Data Center Host Municipality Fee Agreement",
          "url": "https://groton-ct.gov/document_center/Departments/Town%20Manager/Data%20Centers/Data%20Center%20Agreement%20(3-26-21%20final%20clean).pdf",
          "type": "municipal host-fee agreement",
          "published": "2021",
          "retrieved": "2026-09-14",
          "locator": "PDF p. 1 recitals; pp. 3–4 eligibility and permit conditions; pp. 7–8 term, termination and power-purchase election, notice and possible-waiver provisions",
          "supports": "Gotspace identity and development intent; candidate parcel list; 64.01-acre portion; conditional milestone and termination boundaries. The displayed copy leaves execution day/month blank and does not establish current agreement performance.",
          "source_type": "government"
        },
        {
          "title": "Town of Groton Council item 2022-43 — Data Center Update",
          "url": "https://www.agendasuite.org/iip/groton/file/getfile/61287",
          "type": "municipal council agenda item",
          "published": "2022-02-03",
          "retrieved": "2026-09-14",
          "locator": "PDF p. 16, Issue/Background paragraph stating Council approval on April 6, 2021 and that the agreement allows but does not guarantee construction",
          "supports": "Approval date and exact non-guarantee boundary; not later permitting, continued effectiveness, or construction.",
          "source_type": "government"
        }
      ],
      "confidence": "high",
      "missing_evidence": [
        "current agreement status and any termination/default/assignment notice",
        "DECD agreement or certificate and power-purchase agreement",
        "Planning and Zoning site-plan approval or building permit",
        "final site, address, county field and coordinates",
        "owner, operator, tenant and capacity"
      ],
      "history": [
        {
          "date": "2021-04-06",
          "summary": "Town Council record says the host-municipality fee agreement was approved; this did not guarantee a data center."
        },
        {
          "date": "2026-09-14",
          "field": "publication",
          "summary": "Qualified as one agreement-backed project with current lifecycle unknown; all later milestones remain unverified."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "drfortress-honolulu-hi",
      "parent_id": null,
      "record_unit": "operating_facility",
      "current_name": "DRFortress",
      "state": "HI",
      "city": "Honolulu",
      "county": null,
      "developer": null,
      "operator": null,
      "owner": null,
      "tenant": null,
      "lifecycle_status": "operating",
      "status_attribution": "Current State of Hawaii ETS shared-data-center page and State Procurement Office awarded-vendor page",
      "status_basis": "The current Hawaii Office of Enterprise Technology Services page says ETS uses DR Fortress as one of three shared data centers for state departments. The current State Procurement Office page lists DR Fortress, LLC as an awarded vendor under SPO VL Contract 23-03 for colocation/data-center services. A State IT consent agenda explicitly identifies DRFortress at 3375 Koapaka Street as a colocation data center, and Honolulu permit 618472 records an issued data-center electrical permit application at that exact address that was later closed. This supports one operating facility and address; the permit workflow does not establish physical completion, and the selected records do not establish real-time utilization, every service, ownership, operator legal role, campus extent, capacity, or physical scale.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "site",
        "aggregation_allowed": false,
        "note": "No selected qualifying record states facility critical-IT, utility-request, utility-service, generation, gross-facility, company-design, or measured-load MW. Procurement cabinet power options are catalog products, not facility capacity."
      },
      "location": {
        "address": "3375 Koapaka Street, Honolulu, HI 96819",
        "city": "Honolulu",
        "county": null,
        "precision": "exact",
        "note": "Exact address is stated in the State IT consent agenda and corroborated by City permit 618472 (TMK 11015013). Suite D-198 from company material is excluded. No parcel boundary, coordinates, or county field is asserted."
      },
      "physical_scale": "Unknown. No selected qualifying record establishes facility floor area, white space, rack count, building count, acreage, or campus boundary.",
      "sources": [
        {
          "title": "Hawaii Office of Enterprise Technology Services — Services-Oriented Infrastructure",
          "url": "https://ets.hawaii.gov/services-oriented-infrastructure/",
          "type": "state technology-services page",
          "published": null,
          "retrieved": "2026-09-14",
          "locator": "Services-Oriented Infrastructure Programs, Shared Data Center bullet",
          "supports": "Current state use of DR Fortress as one of three shared data centers; not ownership, facility-wide utilization, capacity, or scale.",
          "source_type": "government"
        },
        {
          "title": "Hawaii State Procurement Office — Network & Telecom Services, SPO VL Contract No. 23-03",
          "url": "https://spo.hawaii.gov/network-telecom-services/",
          "type": "state procurement award page",
          "published": null,
          "retrieved": "2026-09-14",
          "locator": "Contract heading and Awarded Proposals list, DR Fortress, LLC and colocation/data-center services",
          "supports": "DR Fortress legal-name crosswalk and current awarded colocation/data-center service offering; not property ownership, sole operator, facility capacity, or customer utilization.",
          "source_type": "government"
        },
        {
          "title": "Hawaii ETS — IT Consent Agenda, reporting period April 10–May 8, 2014",
          "url": "https://ets.hawaii.gov/wp-content/uploads/2013/11/CONSENT_AGENDA_5-15-2014.pdf",
          "type": "state IT consent agenda",
          "published": "2014-05-12",
          "retrieved": "2026-09-14",
          "locator": "PDF p. 2, Telecommunications Requests table rows naming DRFortress at 3375 Koapaka Street and calling it a colocation data center",
          "supports": "DRFortress/address/facility crosswalk and historical state connectivity; not current capacity or ownership.",
          "source_type": "government"
        },
        {
          "title": "City and County of Honolulu — Building permit 618472",
          "url": "https://data.honolulu.gov/resource/4vab-c87q.json?buildingpermitno=618472",
          "type": "municipal building-permit record",
          "published": "2007-10-11",
          "retrieved": "2026-09-14",
          "locator": "Single returned row: permit 618472, proposed use data center, 3375 Koapaka St., TMK 11015013, issued 2007-10-11, status Permit application closed; final certificate fields are no",
          "supports": "Data-center permit application, exact address, TMK and issue date; the later closed application status is not proof that physical work was completed, and the permit does not name DRFortress or prove current operation by itself.",
          "source_type": "permit"
        }
      ],
      "confidence": "high",
      "missing_evidence": [
        "property owner, facility operator legal role, developer and tenants",
        "parcel boundary, coordinates and county field",
        "all capacity measures and physical scale",
        "opening date and continuous operating history",
        "exact term and facility-address attachment for SPO VL Contract 23-03"
      ],
      "history": [
        {
          "date": "2007-10-11",
          "summary": "Honolulu issued electrical permit application 618472 for data-center work at 3375 Koapaka Street; the application later closed, without a final certificate field establishing physical completion."
        },
        {
          "date": "2014-05-12",
          "summary": "State IT consent agenda named DRFortress at 3375 Koapaka Street as a colocation data center."
        },
        {
          "date": "2026-09-14",
          "field": "publication",
          "summary": "Qualified from current ETS use and procurement pages as one operating facility; roles, capacity, and scale remain unknown."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "sabey-montana-connections-data-center-project-mt",
      "parent_id": null,
      "record_unit": "project",
      "current_name": "Sabey Montana Connections Data Center Project",
      "state": "MT",
      "city": null,
      "county": "Silver Bow County",
      "developer": "Horizons Montana, LLC",
      "operator": null,
      "owner": null,
      "tenant": null,
      "lifecycle_status": "proposed",
      "status_attribution": "Butte-Silver Bow Council and Montana Connections TEDD land-sale and due-diligence records through April 24, 2026",
      "status_basis": "Butte-Silver Bow Council communication 2025-211 requested authorization for a land-sale agreement with Horizons Montana, LLC concerning roughly 600 acres in Montana Connections for development of a data-center campus. The county's current Ad Hoc Data Center Impact Committee page crosswalks Sabey to this proposed project and says Sabey received a six-month extension on February 11, 2026. An April 24, 2026 TEDD agenda still listed a Sabey/Horizons update and due-diligence extension item, without recording its result. This supports a proposed project in a land-sale and due-diligence process; it does not prove that an agreement or amendment was authorized or executed, the sale closed, ownership transferred, or any zoning, permit, construction, power, energization, or operating milestone occurred.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "site",
        "aggregation_allowed": false,
        "note": "No selected land-sale or council action establishes approved critical-IT, utility-request, utility-service, generation, gross-facility, company-design, or measured-load MW. Presentation and unrelated-project MW figures are excluded."
      },
      "location": {
        "address": null,
        "city": null,
        "county": "Silver Bow County",
        "precision": "approximate",
        "note": "Bounded only to the Montana Connections area in Silver Bow County. No parcel identifiers, street address, coordinates, final boundary, executed agreement, or closing is asserted."
      },
      "physical_scale": "Council communication 2025-211 describes a proposed roughly 600-acre land-sale scope. This is agenda-request scope, not proof of authorization, an executed agreement, a completed conveyance, developed campus acreage, building count, floor area, or capacity.",
      "sources": [
        {
          "title": "Butte-Silver Bow Council agenda — April 16, 2025, Communication 2025-211",
          "url": "https://www.co.silverbow.mt.us/AgendaCenter/ViewFile/Agenda/_04162025-4618",
          "type": "city-county council agenda request",
          "published": "2025-04-16",
          "retrieved": "2026-09-14",
          "locator": "Communication 2025-211 request for Council authorization concerning an agreement with Horizons Montana LLC for data-center-campus development",
          "supports": "Proposed project purpose, prospective purchaser/developer identity, general land scale and location; not a recorded authorization, executed agreement, closing, permit, construction, capacity, or operation.",
          "source_type": "government"
        },
        {
          "title": "Butte-Silver Bow — Ad Hoc Data Center Impact Committee",
          "url": "https://www.co.silverbow.mt.us/3468/Ad--Hoc-Data-Center-Impact-Committee",
          "type": "current city-county project and committee page",
          "published": null,
          "retrieved": "2026-09-14",
          "locator": "About paragraph and notice of the six-month Council extension on February 11, 2026",
          "supports": "Proposed project identity, Sabey name and dated Council extension; not permit, closing, construction, capacity, or operation.",
          "source_type": "government"
        },
        {
          "title": "Montana Connections TEDD Board agenda — April 24, 2026",
          "url": "https://www.co.silverbow.mt.us/AgendaCenter/ViewFile/Agenda/_04242026-5031",
          "type": "city-county TEDD board agenda",
          "published": "2026-04-24",
          "retrieved": "2026-09-14",
          "locator": "Items 4.4 and 5.1: Sabey Data Centers (Horizons Montana, LLC) update and due-diligence extension request",
          "supports": "April 2026 identity/crosswalk and due-diligence context; not the result, closing, permit, or construction.",
          "source_type": "government"
        }
      ],
      "confidence": "high",
      "missing_evidence": [
        "executed amendment and present due-diligence status",
        "closing deed and current land ownership",
        "parcel identifiers, street address, coordinates and parcel geometry",
        "approvals, operator, tenant and all capacity measures",
        "construction, energization, opening and completion dates"
      ],
      "history": [
        {
          "date": "2025-04-16",
          "summary": "Council communication requested authorization for a proposed Horizons Montana purchase-and-sale agreement for data-center-campus development; it does not record the result."
        },
        {
          "date": "2026-02-11",
          "summary": "County page records a six-month extension granted to Sabey; exact amendment term remains unverified."
        },
        {
          "date": "2026-04-24",
          "summary": "TEDD agenda continued to list the Sabey/Horizons project and due-diligence extension as an update."
        },
        {
          "date": "2026-09-14",
          "field": "publication",
          "summary": "Qualified as one proposed land-sale and due-diligence project; no later lifecycle milestone is inferred."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "velco-new-haven-operations-facility-vt",
      "parent_id": null,
      "record_unit": "building",
      "current_name": "VELCO New Haven Operations Facility",
      "state": "VT",
      "city": "New Haven",
      "county": null,
      "developer": null,
      "operator": null,
      "owner": null,
      "tenant": null,
      "lifecycle_status": "construction",
      "status_attribution": "Construction reported in VELCO's 2024 ESG report; current completion and operating status unverified",
      "status_basis": "The adopted 2025 New Haven Town Plan identifies VELCO's backup operations and data-center project. The Vermont Public Utility Commission's August 12, 2020 final order and certificate of public good authorize the New Haven Operations Facility at 760 Main Street, including a main operations building housing a secondary data center. VELCO's 2024 ESG report describes the building as nearing completion. This is a dated utility-reported construction basis, not a statement of current construction progress. The town plan's 2023 commissioning and later utilization entries are estimates supplied on November 6, 2020, not observations. The CPG requires a separate pre-operation compliance letter. That letter, completion, energization and data-center operation have not been established by the selected records.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "building",
        "aggregation_allowed": false,
        "note": "No critical-IT, gross-facility, utility-request, utility-service or measured-load MW is published. Annual MWh and utilization percentages in the town plan are 2020 forecasts, not measured use or IT capacity. Backup-generator ratings and the 32 kW solar array are not data-center load or capacity and are excluded."
      },
      "location": {
        "address": "760 Main Street",
        "city": "New Haven",
        "county": null,
        "precision": "exact",
        "note": "The PUC order identifies the approved project at 760 Main Street (VT Route 17) in the Town of New Haven, Vermont. Exact refers only to the stated project street address, not a surveyed parcel boundary, current entrance, coordinates or building footprint. The separately opened January 30, 2020 PUC site-visit memorandum identifies the same case and address."
      },
      "physical_scale": "The 2020 final order describes a two-story main operations building of approximately 18,000 square feet. This is the historical approved design for a multi-use building that includes a secondary data center, not data-hall area, as-built area, commissioned compute area or current measured size. The separate generator building is not another data-center building. Later amendments and as-built scale are not consolidated here.",
      "sources": [
        {
          "title": "2025 New Haven Town Plan — adopted March 4, 2025",
          "url": "https://outside.vermont.gov/agency/ACCD/bylaws/Bylaws%20and%20Plans%20Approved/NewHaven_Adopted_MunicipalPlan_March_2025.pdf",
          "type": "state-hosted adopted municipal plan",
          "published": null,
          "retrieved": "2026-09-14",
          "locator": "PDF p. 3 title/adoption date; printed p. 50 / PDF p. 52 project description and footnote 9; printed p. 65 / PDF p. 67 forecast attribution and table",
          "supports": "Municipal identification of the VELCO backup operations/data-center project in New Haven; explicit November 6, 2020 forecast boundary. March 4, 2025 is the adoption date, not an asserted web publication date. Does not establish commissioning or utilization.",
          "source_type": "government"
        },
        {
          "title": "Vermont PUC case 19-4582-PET — site-visit memorandum dated January 30, 2020",
          "url": "https://puc.vermont.gov/sites/psbnew/files/doc_library/NOSITE-final_7.pdf",
          "type": "government docket site-visit memorandum",
          "published": null,
          "retrieved": "2026-09-14",
          "locator": "PDF p. 1, memorandum date and first two body paragraphs",
          "supports": "Independent government-hosted case/address crosswalk to 760 Main Street, New Haven and VELCO signage; a scheduled site visit is not approval, construction or operation. The memorandum date is not an asserted publication date.",
          "source_type": "docket"
        },
        {
          "title": "Vermont PUC case 19-4582-PET — final order and certificate of public good, August 12, 2020",
          "url": "https://drive.google.com/file/d/1oLb9frX6MszX4G94WDTG0G8toUcKcJLX/view?usp=sharing",
          "type": "government-issued regulatory order and certificate, utility-linked public copy",
          "published": "2020-08-12",
          "retrieved": "2026-09-14",
          "locator": "48-page PDF: final order pp. 1–2, 5–8 and 34–35; certificate PDF pp. 38–40, especially condition 12; filed date PDF p. 46",
          "supports": "Approved identity, address, main-building unit, historical approximately 18,000-square-foot design, secondary-data-center use and pre-operation filing boundary. Google Drive is only a hosting locator and is not a qualifying government host; authenticity crosschecked through the official VELCO project-page link and government case/address record.",
          "source_type": "docket"
        },
        {
          "title": "Vermont PUC case 22-0557-PET — order granting non-substantial change determination, April 14, 2022",
          "url": "https://drive.google.com/file/d/1-c1I8GCvdOJ_vHnR3REnOPBVimAvhlHT/view?usp=sharing",
          "type": "government-issued regulatory order, utility-linked public copy",
          "published": "2022-04-14",
          "retrieved": "2026-09-14",
          "locator": "PDF pp. 1–3 background and findings; pp. 6–7 adopted order and filed date",
          "supports": "Same project/address and 2022 fiber-connection change determination; identifies an intervening March 18, 2021 CPG amendment in case 20-3879-PET. No completion or operation finding. Drive hosting alone is non-qualifying.",
          "source_type": "docket"
        },
        {
          "title": "VELCO 2024 Environmental, Social, Governance Report",
          "url": "https://www.velco.com/sites/default/files/2025-04/2024%20ESG%20Report%20v7.pdf",
          "type": "utility company report",
          "published": null,
          "retrieved": "2026-09-14",
          "locator": "Printed/PDF p. 15, Facilities section, New Haven paragraph in lower left",
          "supports": "Utility-reported building nearing completion in the report's dated context, with LEED certification only hoped for in 2025; not current progress, data-center commissioning, operation or certified LEED status. The 2025-04 upload path is not a publication date.",
          "source_type": "company"
        },
        {
          "title": "VELCO — New Haven Operations Facility project page",
          "url": "https://www.velco.com/projects/new-haven-operations-facility",
          "type": "utility company project page",
          "published": null,
          "retrieved": "2026-09-14",
          "locator": "Project Highlights; Public Utility Commission Issued Documents, Certificate of Public Good and PUC Order Granting Non-Substantial Change links",
          "supports": "Official utility identity/use description and provenance links for the exact two reviewed PUC documents. The dated forecast timeline is not completion evidence; the separate Final Order link leads to a different Middlebury project and is excluded.",
          "source_type": "company"
        }
      ],
      "confidence": "high",
      "missing_evidence": [
        "pre-operation CPG condition 12 filing and actual operation date",
        "completion, commissioning, energization and current data-center operating status",
        "complete post-2020 amendment and compliance record, including case 20-3879-PET",
        "current as-built scale, data-hall area and surveyed building or parcel boundary",
        "separately resolved legal developer, operator, owner and tenant roles",
        "critical-IT, gross-facility, utility-request, utility-service and measured-load capacity",
        "current LEED certification disposition"
      ],
      "history": [
        {
          "date": "2020-08-12",
          "summary": "The Vermont PUC issued a conditional final order and CPG for the New Haven Operations Facility; authorization is not actual construction or operation."
        },
        {
          "date": "2022-04-14",
          "summary": "The PUC determined the proposed fiber-connection changes to be non-substantial; this is not a commissioning or operation finding."
        },
        {
          "date": "2025-03-04",
          "summary": "The adopted town plan identifies the project but retains electricity and commissioning forecasts supplied in 2020; these are not observed milestones."
        },
        {
          "date": "2026-09-14",
          "field": "review",
          "summary": "Independent source review reopened VELCO's report for 2024, which describes the building as nearing completion. This is a retrieval/review date, not a construction, observation, publication or operating date."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "vantage-quincy-campus-wa",
      "parent_id": null,
      "record_unit": "campus",
      "current_name": "Vantage Data Centers — Quincy Campus",
      "state": "WA",
      "city": "Quincy",
      "county": "Grant",
      "developer": null,
      "operator": "Vantage Data Centers",
      "owner": null,
      "tenant": null,
      "lifecycle_status": "operating",
      "status_attribution": "Washington State Department of Ecology approval order dated 29 August 2023",
      "status_basis": "Ecology's order calls this an existing data center at 2101 M Street NE. It says Buildings One and Two were in place while Building Three remained a future phase. Operating therefore describes the campus, not every planned building.",
      "capacity": {
        "value": 49.5,
        "unit": "MW",
        "kind": "backup_generation_permitted",
        "scope": "campus",
        "aggregation_allowed": false,
        "note": "Ecology states a 49.5 MW facility total for installed emergency generators in Phases One and Two. The component figures printed in the order do not sum to that total. This is permitted backup generation, not critical IT capacity, utility service or measured load. Phase Three equipment is outside the stated total."
      },
      "location": {
        "address": "2101 M Street NE",
        "city": "Quincy",
        "county": "Grant",
        "precision": "exact",
        "note": "The exact street address, city and county are stated in Ecology Approval Order 23AQ-E056; exact does not mean a surveyed parcel or building footprint."
      },
      "physical_scale": "The order describes a three-phase campus: Buildings One and Two were in place and Building Three was planned. This is not a finding that three buildings were operating on the review date.",
      "sources": [
        {
          "title": "Washington State Department of Ecology — data centers regulated or reviewed by Ecology",
          "url": "https://ecology.wa.gov/air-climate/air-quality/data-centers",
          "type": "state regulatory index",
          "published": null,
          "retrieved": "2026-09-17",
          "locator": "Quincy — Vantage entry and linked approval order",
          "supports": "State regulator's project index and link to the site-specific order; the index explicitly says it is not a complete list of every Washington data center.",
          "source_type": "government"
        },
        {
          "title": "Ecology Approval Order 23AQ-E056 — Vantage Quincy",
          "url": "https://ecology.wa.gov/20230829vantagenocpermit",
          "type": "notice-of-construction approval order",
          "published": "2023-08-29",
          "retrieved": "2026-09-17",
          "locator": "Project Summary and Equipment sections",
          "supports": "Existing-campus identity, Vantage role, exact address, phased-building boundary and the separately typed emergency-generator figure.",
          "source_type": "permit"
        }
      ],
      "confidence": "medium",
      "missing_evidence": [
        "critical IT capacity",
        "utility service and measured load",
        "current completion or operating status of Building Three",
        "tenant identities",
        "surveyed parcel and building footprints"
      ],
      "history": [
        {
          "date": "2023-08-29",
          "summary": "Ecology documented an existing two-phase campus and approved equipment for a third phase; the order is not evidence that the third building was complete or operating."
        },
        {
          "date": "2026-09-18",
          "field": "publication",
          "summary": "Added after independent re-reading of the state index and site-specific order, with backup generation kept separate from IT capacity."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "cyrusone-quincy-data-center-wa",
      "parent_id": null,
      "record_unit": "operating_facility",
      "current_name": "CyrusOne — Quincy Data Center",
      "other_names": [
        "CyrusOne PNW1"
      ],
      "state": "WA",
      "city": "Quincy",
      "county": "Grant",
      "developer": null,
      "operator": "CyrusOne",
      "owner": null,
      "tenant": null,
      "lifecycle_status": "operating",
      "status_attribution": "Washington State Department of Ecology approval order dated 22 January 2026",
      "status_basis": "Ecology's order calls CyrusOne — Quincy an existing data center at 1025 D Street NW. The finding is limited to that facility and the order's date; it does not establish occupancy, utilization or critical IT load.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "site",
        "aggregation_allowed": false,
        "note": "The order reduces the permitted emergency-generator count from 42 to 22. Generator count is not IT capacity, utility service or measured load and is not converted to MW here."
      },
      "location": {
        "address": "1025 D Street NW",
        "city": "Quincy",
        "county": "Grant",
        "precision": "exact",
        "note": "The exact street address, city and county are stated in Ecology Approval Order 26AQ-E008; exact does not mean a surveyed parcel or building footprint."
      },
      "physical_scale": "The order changes an emergency-generator count from 42 to 22. That is neither a building count nor a measure of data-center capacity.",
      "sources": [
        {
          "title": "Washington State Department of Ecology — data centers regulated or reviewed by Ecology",
          "url": "https://ecology.wa.gov/air-climate/air-quality/data-centers",
          "type": "state regulatory index",
          "published": null,
          "retrieved": "2026-09-17",
          "locator": "Quincy — CyrusOne entry and linked approval order",
          "supports": "State regulator's project index and link to the site-specific order; the index explicitly says it is not a complete list of every Washington data center.",
          "source_type": "government"
        },
        {
          "title": "Ecology Approval Order 26AQ-E008 — CyrusOne Quincy",
          "url": "https://ecology.wa.gov/20260122cyrusonenoctsd",
          "type": "notice-of-construction approval order and technical support document",
          "published": "2026-01-22",
          "retrieved": "2026-09-17",
          "locator": "Order caption and Project Summary; technical-support-document facility name",
          "supports": "Existing-facility identity, CyrusOne role, PNW1 alias, exact address and emergency-generator-count change.",
          "source_type": "permit"
        }
      ],
      "confidence": "medium",
      "missing_evidence": [
        "critical IT capacity",
        "utility service and measured load",
        "building count and data-hall area",
        "current occupancy, utilization and tenant identity",
        "surveyed parcel and building footprints"
      ],
      "history": [
        {
          "date": "2026-01-22",
          "summary": "Ecology issued an order for an existing data center that reduces its permitted emergency-generator count; this does not measure IT load or utilization."
        },
        {
          "date": "2026-09-18",
          "field": "publication",
          "summary": "Added after independent re-reading of the state index and site-specific order."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "h5-quincy-data-center-wa",
      "parent_id": null,
      "record_unit": "operating_facility",
      "current_name": "H5 Data Centers — Quincy",
      "other_names": [
        "Intuit Quincy"
      ],
      "state": "WA",
      "city": "Quincy",
      "county": "Grant",
      "developer": null,
      "operator": "H5 Data Centers",
      "owner": null,
      "tenant": null,
      "lifecycle_status": "operating",
      "status_attribution": "Washington State Department of Ecology approval order dated 26 November 2024",
      "status_basis": "Ecology's order calls H5 Quincy an existing data center at 1711 M Street NE. The accompanying review concerned equipment that had not all been installed, so operating describes the existing facility and does not imply full permitted buildout.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "site",
        "aggregation_allowed": false,
        "note": "Emergency-generator and cooling-unit ratings in the order are not critical IT capacity, utility service or measured load and are not converted here."
      },
      "location": {
        "address": "1711 M Street NE",
        "city": "Quincy",
        "county": "Grant",
        "precision": "exact",
        "note": "The exact street address, city and county are stated in Ecology Approval Order 24AQ-E040; exact does not mean a surveyed parcel or building footprint."
      },
      "physical_scale": "The selected primary records establish one permitted facility. They do not resolve the number, status or boundaries of separately marketed buildings.",
      "sources": [
        {
          "title": "Washington State Department of Ecology — data centers regulated or reviewed by Ecology",
          "url": "https://ecology.wa.gov/air-climate/air-quality/data-centers",
          "type": "state regulatory index",
          "published": null,
          "retrieved": "2026-09-17",
          "locator": "Quincy — H5 (formerly Intuit) entry and linked approval order",
          "supports": "State regulator's facility identity, former-name relationship and link to the site-specific order; the index explicitly says it is not a complete statewide list.",
          "source_type": "government"
        },
        {
          "title": "Ecology Approval Order 24AQ-E040 — H5 Quincy",
          "url": "https://ecology.wa.gov/20241126h5nocpermit",
          "type": "notice-of-construction approval order and technical support document",
          "published": "2024-11-26",
          "retrieved": "2026-09-17",
          "locator": "Order caption, Project Summary and technical-support-document project description",
          "supports": "Existing-facility identity, H5 role, exact address and the boundary between existing operation and not-yet-installed equipment.",
          "source_type": "permit"
        }
      ],
      "confidence": "medium",
      "missing_evidence": [
        "critical IT capacity",
        "utility service and measured load",
        "current completion status of approved equipment",
        "resolved building count and building-level relationships",
        "current occupancy, utilization and tenant identity",
        "surveyed parcel and building footprints"
      ],
      "history": [
        {
          "date": "2024-11-26",
          "summary": "Ecology documented an existing H5 data center while reviewing an extension and equipment changes; the order is not evidence of full permitted buildout."
        },
        {
          "date": "2026-09-18",
          "field": "publication",
          "summary": "Added after independent re-reading of the state index and site-specific order, with equipment ratings excluded from IT-capacity fields."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "project-camellia-effingham-county-ga",
      "parent_id": null,
      "record_unit": "project",
      "current_name": "Project Camellia",
      "state": "GA",
      "city": null,
      "county": "Effingham",
      "developer": "Octans GA LLC c/o Butler Snow",
      "operator": null,
      "operator_basis": {
        "finding": "not_named_in_cited_records",
        "sources": [
          {
            "locator": "https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4801",
            "source_id": "GA-S0026"
          },
          {
            "locator": "https://apps.dca.ga.gov/DRI/AppSummary.aspx?driid=4801",
            "source_id": "GA-S0027"
          }
        ]
      },
      "owner": "Effingham County Industrial Development Authority",
      "tenant": null,
      "lifecycle_status": "proposed",
      "status_attribution": "Georgia DRI 4801; initial information filed 22 July 2026; regional-review status is not project lifecycle status.",
      "status_basis": "A Georgia DRI filing describes Project Camellia as a proposed data-center project in unincorporated Effingham County. Completion of regional review does not establish local approval, construction or operation.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "unknown",
        "aggregation_allowed": false
      },
      "location": {
        "address": null,
        "city": null,
        "county": "Effingham",
        "precision": "unknown",
        "note": "The initial DRI form lists Effingham County as the submitting local government and a form-stated point at 32.261081, -81.263903 in unincorporated Effingham County. That is not a surveyed parcel or a city assignment."
      },
      "sources": [
        {
          "title": "Georgia Department of Community Affairs (DCA)",
          "url": "https://apps.dca.ga.gov/DRI/Submissions.aspx",
          "type": "government",
          "published": null,
          "retrieved": "2026-09-17",
          "locator": "Submissions table row DRI #4801: Project Camellia; Effingham County; unincorporated; development type and process status; no operator column",
          "supports": "Statewide DRI index row for this project only. It does not name an operator.",
          "source_type": "government",
          "source_id": "GA-S0025"
        },
        {
          "title": "Georgia Department of Community Affairs (DCA)",
          "url": "https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4801",
          "type": "government",
          "published": null,
          "retrieved": "2026-09-17",
          "locator": "Initial DRI Information Form, DRI #4801: Submitting Local Government Effingham County; Name of Proposed Project Project Camellia; Brief Description of Project Data center campus; Developer Octans GA LLC c/o Butler Snow; Property Owner Effingham County Industrial Development Authority; Location 32.261081, -81.263903; estimated completion 2032; Development Type TECH",
          "supports": "Local-government-filed initial DRI form naming the project, jurisdiction, developer and owner. It does not name an operator, end user or tenant.",
          "source_type": "government",
          "source_id": "GA-S0026"
        },
        {
          "title": "Georgia Department of Community Affairs (DCA)",
          "url": "https://apps.dca.ga.gov/DRI/AppSummary.aspx?driid=4801",
          "type": "government",
          "published": null,
          "retrieved": "2026-09-17",
          "locator": "DRI Application Summary #4801: Project Name Project Camellia; Submitting Local Government Effingham; Developer Octans GA LLC c/o Butler Snow; Current Status Completed; Initial form 7/22/2026",
          "supports": "State DRI review-status record. Completed is regional-review status, not project lifecycle status.",
          "source_type": "government",
          "source_id": "GA-S0027"
        }
      ],
      "confidence": "medium",
      "missing_evidence": [
        "critical IT capacity",
        "utility service capacity",
        "operator",
        "tenant",
        "current construction status on the ground",
        "whether any local rezoning or permit has since been granted",
        "the ultimate end user"
      ],
      "history": [
        {
          "date": "2026-07-22",
          "summary": "Initial DRI information was filed for Project Camellia in Effingham County."
        },
        {
          "date": "2026-09-18",
          "field": "publication",
          "summary": "Added from the opened Georgia DRI filing after operator-null review. The cited DRI does not name an end user or tenant and does not support the OpenAI attribution."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "project-sail-coweta-county-ga",
      "parent_id": null,
      "record_unit": "project",
      "current_name": "Project Sail",
      "state": "GA",
      "city": null,
      "county": "Coweta",
      "developer": "Atlas Development, LLC",
      "operator": null,
      "operator_basis": {
        "finding": "not_named_in_cited_records",
        "sources": [
          {
            "locator": "https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4361",
            "source_id": "GA-S0028"
          }
        ]
      },
      "owner": "William Gause; AKJJ Holdings; Billy & Brenda Harper",
      "tenant": null,
      "lifecycle_status": "proposed",
      "status_attribution": "Georgia DRI 4361 initial filing dated 31 December 2024; proposed rezoning basis only.",
      "status_basis": "DRI 4361 describes a proposed data-center project and requests rezoning in unincorporated Coweta County. The filing does not establish approval, construction or operation.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "unknown",
        "aggregation_allowed": false
      },
      "location": {
        "address": null,
        "city": null,
        "county": "Coweta",
        "precision": "unknown",
        "note": "The initial DRI form lists Coweta as the submitting local government and Welcome To Sargent Rd & Wagers Mill as the location, in unincorporated Coweta County."
      },
      "sources": [
        {
          "title": "Georgia Department of Community Affairs (DCA)",
          "url": "https://apps.dca.ga.gov/DRI/Submissions.aspx",
          "type": "government",
          "published": null,
          "retrieved": "2026-09-17",
          "locator": "Submissions table row DRI #4361: Project Sail; Coweta County; unincorporated; development type and process status; no operator column",
          "supports": "Statewide DRI index row for this project only. It does not name an operator.",
          "source_type": "government",
          "source_id": "GA-S0025"
        },
        {
          "title": "Georgia Department of Community Affairs (DCA)",
          "url": "https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4361",
          "type": "government",
          "published": null,
          "retrieved": "2026-09-17",
          "locator": "Initial DRI Information Form, DRI #4361: Submitting Local Government Coweta; Project Project Sail; Description Data Center consisting of 13 Buildings being +/- 378,000 SF each and substations.; Developer Atlas Development, LLC; Location Welcome To Sargent Rd & Wagers Mill; action requested Rezoning; estimated completion 12/31/2036",
          "supports": "Local-government-filed initial DRI form naming the project, developer and owners and requesting rezoning. Planned building figures are one project description, not operating facilities.",
          "source_type": "government",
          "source_id": "GA-S0028"
        }
      ],
      "confidence": "medium",
      "missing_evidence": [
        "critical IT capacity",
        "utility service capacity",
        "operator",
        "tenant",
        "current construction status on the ground",
        "whether Coweta County granted the requested rezoning",
        "relationship, if any, to Prologis"
      ],
      "history": [
        {
          "date": "2024-12-31",
          "summary": "The initial DRI filing described Project Sail and requested rezoning; it did not establish an approved or operating facility."
        },
        {
          "date": "2026-09-18",
          "field": "publication",
          "summary": "Added from the opened Georgia DRI filing after operator-null review; Prologis is not named in the cited records."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "qts-blakely-early-county-ga",
      "parent_id": null,
      "record_unit": "project",
      "current_name": "QTS - Blakely",
      "state": "GA",
      "city": "Blakely",
      "county": "Early",
      "developer": "QTS Technology Services, LLC",
      "operator": null,
      "operator_basis": {
        "finding": "not_named_in_cited_records",
        "sources": [
          {
            "locator": "https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4651",
            "source_id": "GA-S0031"
          },
          {
            "locator": "https://apps.dca.ga.gov/DRI/AppSummary.aspx?driid=4651",
            "source_id": "GA-S0032"
          }
        ],
        "note": "QTS Technology Services, LLC is named as developer/applicant in DRI 4651. A developer name is not an operator assignment."
      },
      "owner": "McKnight Blakely LLC",
      "tenant": null,
      "lifecycle_status": "proposed",
      "status_attribution": "Georgia DRI 4651; initial form filed 10 March 2026; additional form recorded 16 September 2026.",
      "status_basis": "DRI 4651 describes the proposed QTS - Blakely development for site-plan review. Filing an additional DRI form does not establish site-plan approval, construction or operation.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "unknown",
        "aggregation_allowed": false
      },
      "location": {
        "address": null,
        "city": "Blakely",
        "county": "Early",
        "precision": "unknown",
        "note": "The initial DRI form lists Blakely as the submitting local government and a form-stated point at 31.406296, -84.912908 in Early County."
      },
      "sources": [
        {
          "title": "Georgia Department of Community Affairs (DCA)",
          "url": "https://apps.dca.ga.gov/DRI/Submissions.aspx",
          "type": "government",
          "published": null,
          "retrieved": "2026-09-17",
          "locator": "Submissions table row DRI #4651: QTS - Blakely; Early County; Blakely; development type and process status; no operator column",
          "supports": "Statewide DRI index row for this project only. It does not name an operator.",
          "source_type": "government",
          "source_id": "GA-S0025"
        },
        {
          "title": "Georgia Department of Community Affairs (DCA)",
          "url": "https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4651",
          "type": "government",
          "published": null,
          "retrieved": "2026-09-17",
          "locator": "Initial DRI Information Form, DRI #4651: Submitting Local Government Blakely; Project QTS - Blakely; Description The proposed development consists of a Data Center type project.; Developer QTS Technology Services, LLC; Property Owner McKnight Blakely LLC",
          "supports": "Local-government-filed initial DRI form naming the project, developer and owner and requesting site-plan review. Project-size text is not converted to IT capacity or operating facilities.",
          "source_type": "government",
          "source_id": "GA-S0031"
        },
        {
          "title": "Georgia Department of Community Affairs (DCA)",
          "url": "https://apps.dca.ga.gov/DRI/AppSummary.aspx?driid=4651",
          "type": "government",
          "published": null,
          "retrieved": "2026-09-17",
          "locator": "DRI Application Summary #4651: QTS - Blakely; Jurisdiction Blakely; Developer QTS Technology Services, LLC; DRI Status Additional Form Submitted; Initial form 3/10/2026; Additional form 9/16/2026",
          "supports": "State DRI review-status record. Additional Form Submitted is process status, not approval or operation.",
          "source_type": "government",
          "source_id": "GA-S0032"
        }
      ],
      "confidence": "medium",
      "missing_evidence": [
        "critical IT capacity",
        "utility service capacity",
        "operator",
        "tenant",
        "current construction status on the ground",
        "whether site-plan review was granted"
      ],
      "history": [
        {
          "date": "2026-03-10",
          "summary": "An initial DRI form was filed for the proposed QTS - Blakely project."
        },
        {
          "date": "2026-09-18",
          "field": "publication",
          "summary": "Added from the opened Georgia DRI filing after operator-null review; QTS branding is not treated as a verified operator role."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "kingston-technology-hub-bartow-ga",
      "parent_id": null,
      "record_unit": "project",
      "current_name": "Kingston Technology Hub",
      "state": "GA",
      "city": "Kingston",
      "county": "Bartow",
      "developer": "Thor Acquisition WC LLC",
      "operator": null,
      "operator_basis": {
        "finding": "not_named_in_cited_records",
        "sources": [
          {
            "locator": "https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4835",
            "source_id": "GA-S0029"
          },
          {
            "locator": "https://apps.dca.ga.gov/DRI/AppSummary.aspx?driid=4835",
            "source_id": "GA-S0030"
          }
        ]
      },
      "owner": "Robert C. Cha, Silvana U. Cha, Christine Cha Choe, and Christopher H. Choe",
      "tenant": null,
      "lifecycle_status": "proposed",
      "status_attribution": "Georgia DRI 4835; initial form filed 4 September 2026; proposal and regional-review records only.",
      "status_basis": "DRI 4835 requests rezoning for a proposed data-center building in Bartow County. A complete DRI submission is not a local rezoning approval or proof of construction or operation.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "unknown",
        "aggregation_allowed": false
      },
      "location": {
        "address": null,
        "city": "Kingston",
        "county": "Bartow",
        "precision": "unknown",
        "note": "The initial DRI form lists Kingston as the submitting local government and Bartow County tax parcel 0037-0197-001 as the location."
      },
      "sources": [
        {
          "title": "Georgia Department of Community Affairs (DCA)",
          "url": "https://apps.dca.ga.gov/DRI/Submissions.aspx",
          "type": "government",
          "published": null,
          "retrieved": "2026-09-17",
          "locator": "Submissions table row DRI #4835: Kingston Technology Hub; Bartow County; Kingston; development type and process status; no operator column",
          "supports": "Statewide DRI index row for this project only. It does not name an operator.",
          "source_type": "government",
          "source_id": "GA-S0025"
        },
        {
          "title": "Georgia Department of Community Affairs (DCA)",
          "url": "https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4835",
          "type": "government",
          "published": null,
          "retrieved": "2026-09-17",
          "locator": "Initial DRI Information Form, DRI #4835: Submitting Local Government Kingston; Project Kingston Technology Hub; Description One (1) Approximately 350,000 Square Foot Proposed Data Center Facility in Bartow County, GA; Developer Thor Acquisition WC LLC; action requested Rezoning",
          "supports": "Local-government-filed initial DRI form naming the project, developer and owners and requesting rezoning. Stated building area and acreage are separate figures, not a derived campus size.",
          "source_type": "government",
          "source_id": "GA-S0029"
        },
        {
          "title": "Georgia Department of Community Affairs (DCA)",
          "url": "https://apps.dca.ga.gov/DRI/AppSummary.aspx?driid=4835",
          "type": "government",
          "published": null,
          "retrieved": "2026-09-17",
          "locator": "DRI Application Summary #4835: Kingston Technology Hub; Jurisdiction Kingston; Developer Thor Acquisition WC LLC; DRI Status Certified Complete",
          "supports": "State DRI review-status record. Certified Complete is regional-review completeness, not rezoning approval or operation.",
          "source_type": "government",
          "source_id": "GA-S0030"
        }
      ],
      "confidence": "medium",
      "missing_evidence": [
        "critical IT capacity",
        "utility service capacity",
        "operator",
        "tenant",
        "current construction status on the ground",
        "whether Kingston grants the rezoning",
        "relationship, if any, between Thor Acquisition WC LLC and Thor Equities"
      ],
      "history": [
        {
          "date": "2026-09-04",
          "summary": "An initial DRI form was filed for the Kingston Technology Hub rezoning proposal."
        },
        {
          "date": "2026-09-18",
          "field": "publication",
          "summary": "Added from the opened Georgia DRI filing after operator-null review; Thor Equities is not stated as a parent in the cited records."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "mclaren-data-center-santa-clara-ca",
      "parent_id": null,
      "record_unit": "project",
      "current_name": "McLaren Data Center",
      "state": "CA",
      "city": "Santa Clara",
      "county": "Santa Clara County",
      "developer": null,
      "operator": null,
      "operator_basis": {
        "finding": "not_named_in_cited_records",
        "sources": [
          {
            "locator": "https://ceqanet.lci.ca.gov/2018062057/6",
            "source_id": "CA-S0042"
          }
        ],
        "note": "not_named_in_cited_records means not named as commercial data-center operator. A generator-authorization applicant name is not an operator assignment."
      },
      "owner": null,
      "tenant": null,
      "lifecycle_status": "approved",
      "status_attribution": "BAAQMD generator approval dated 19 August 2024; CEQAnet notice received 21 August 2024. Construction and current operation are not established by this notice.",
      "status_basis": "The cited BAAQMD Authority-to-Construct notice covers four additional backup generators serving the McLaren Data Center. That generator approval is not a finding that the project is complete or operating. Vantage appears only in generator-authorization context and is not treated as a commercial operator.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "unknown",
        "aggregation_allowed": false
      },
      "location": {
        "address": null,
        "city": "Santa Clara",
        "county": "Santa Clara County",
        "precision": "unknown",
        "note": "The CEQAnet NOD lists Cities Santa Clara, Counties Santa Clara, and Location Cross Streets Lafayette Street. No street address is established here."
      },
      "sources": [
        {
          "title": "Governor's Office of Land Use and Climate Innovation (LCI) / State Clearinghouse CEQAnet",
          "url": "https://ceqanet.lci.ca.gov/2018062057/6",
          "type": "government",
          "published": null,
          "retrieved": "2026-09-17",
          "locator": "SCH 2018062057 /6; CEQAnet date label Received 2024-08-21; Document Description paragraphs about generator installation authority and emergency/testing use; Contact Information / Rob Gire / Project Applicant",
          "supports": "Notice that BAAQMD issued an Authority to Construct for four additional backup generators serving the McLaren Data Center. Building and engine counts in the notice are not treated as a current operating project or as IT capacity, and Vantage is not treated as a separately verified operator.",
          "source_type": "government",
          "source_id": "CA-S0042"
        }
      ],
      "confidence": "medium",
      "missing_evidence": [
        "critical IT capacity",
        "utility service capacity",
        "operator and developer as formal roles",
        "street address",
        "assessor parcel numbers",
        "building count and whether any buildings are in service"
      ],
      "history": [
        {
          "date": "2024-08-21",
          "summary": "A CEQAnet notice received on 21 August 2024 reported the 19 August BAAQMD approval for four additional backup generators at the McLaren facility. Received is not treated as a publication date."
        },
        {
          "date": "2026-09-18",
          "field": "publication",
          "summary": "Added from the opened CEQAnet notice after operator-null review; generator authority is not converted to IT capacity or current operation."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "colovore-meridian-parkway-aurora-il",
      "parent_id": null,
      "record_unit": "project",
      "current_name": "Colovore LLC Aurora data center",
      "state": "IL",
      "city": "Aurora",
      "county": null,
      "developer": null,
      "operator": null,
      "operator_basis": {
        "finding": "not_named_in_cited_records",
        "sources": [
          {
            "locator": "https://epa.illinois.gov/content/dam/soi/en/web/epa/topics/environmental-justice/documents/notification-letters/Colovore%20LLC%20043407AEM%20Joing%20Construction%20LOP%2025070018.pdf",
            "source_id": "IL-S0026"
          }
        ]
      },
      "owner": null,
      "tenant": null,
      "lifecycle_status": "proposed",
      "status_attribution": "Illinois EPA application notice dated 14 August 2025, BOA 043407AEM / application 25070018; proposed status only.",
      "status_basis": "An Illinois EPA environmental-justice notice dated 14 August 2025 describes an application (BOA 043407AEM / 25070018) for a proposed Colovore LLC data center at 4245 Meridian Parkway, Aurora. An application notice is not permit issuance, construction or operation.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "unknown",
        "aggregation_allowed": false
      },
      "location": {
        "address": null,
        "city": "Aurora",
        "county": null,
        "precision": "unknown",
        "note": "The Illinois EPA letter places the proposed facility at 4245 Meridian Parkway, Aurora. County is not established from the cited records, and a separate West Chicago Colovore address is not this project."
      },
      "sources": [
        {
          "title": "Illinois EPA, Office of Environmental Justice",
          "url": "https://epa.illinois.gov/content/soi/epa/en/topics/environmental-justice/ej-notification-letters/jcr:content/responsivegrid/container/container/data_table_copy.datatablejson.json",
          "type": "government",
          "published": null,
          "retrieved": "2026-09-17",
          "locator": "EJ notification-letter table row: Colovore LLC; 4245 Meridian Parkway, Aurora; BOA 043407AEM; application 25070018; letter date 2025-08-14",
          "supports": "Index row for this Aurora application only. It does not establish permit issuance, construction, operation, or the West Chicago Colovore address.",
          "source_type": "government",
          "source_id": "IL-S0025"
        },
        {
          "title": "Illinois EPA, Office of Environmental Justice",
          "url": "https://epa.illinois.gov/content/dam/soi/en/web/epa/topics/environmental-justice/documents/notification-letters/Colovore%20LLC%20043407AEM%20Joing%20Construction%20LOP%2025070018.pdf",
          "type": "government",
          "published": "2025-08-14",
          "retrieved": "2026-09-17",
          "locator": "PDF p.1, letter dated 14 August 2025; first substantive paragraph",
          "supports": "Application notice naming Colovore LLC at 4245 Meridian Parkway, Aurora, for a proposed data center with emergency generators. An application is not an issued operating authorization or proof of current operation, and generator ratings are not IT capacity.",
          "source_type": "government",
          "source_id": "IL-S0026"
        }
      ],
      "confidence": "low",
      "missing_evidence": [
        "critical IT capacity",
        "building count",
        "construction status",
        "developer",
        "owner",
        "tenant",
        "county"
      ],
      "history": [
        {
          "date": "2025-08-14",
          "summary": "An Illinois EPA letter dated 14 August 2025 reported the Colovore application; this is the notice date, not a verified application-filing or permit-issuance date."
        },
        {
          "date": "2026-09-18",
          "field": "publication",
          "summary": "Added from the opened Illinois EPA notice after operator-null review; the applicant is not treated as a verified operator and the West Chicago address is not merged."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "atl2-east-fayetteville-fayette-ga",
      "parent_id": null,
      "record_unit": "project",
      "current_name": "ATL2 East",
      "state": "GA",
      "city": "Fayetteville",
      "county": "Fayette",
      "developer": "QTS Eastwood, LLC",
      "operator": null,
      "operator_basis": {
        "finding": "not_named_in_cited_records",
        "sources": [
          {
            "locator": "https://apps.dca.ga.gov/DRI/Submissions.aspx",
            "source_id": "GA-S0025"
          },
          {
            "locator": "https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4603",
            "source_id": "GA-S0033"
          },
          {
            "locator": "https://apps.dca.ga.gov/DRI/AppSummary.aspx?driid=4603",
            "source_id": "GA-S0034"
          },
          {
            "locator": "https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=4603",
            "source_id": "GA-S0035"
          }
        ]
      },
      "owner": null,
      "tenant": null,
      "lifecycle_status": "approved",
      "status_attribution": "City of Fayetteville Ordinance 25-O-34 adopted 18 December 2025 (rezoning). Zoning approval only — not construction or operation.",
      "status_basis": "The City of Fayetteville adopted Ordinance 25-O-34 on 18 December 2025, rezoning parcels 0705 013 and 0705 019 on Veterans Parkway for the ATL2 East data-center project. That is a zoning approval only. It does not establish a development agreement, building permit, construction or operation.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "unknown",
        "aggregation_allowed": false
      },
      "location": {
        "address": null,
        "city": "Fayetteville",
        "county": "Fayette",
        "precision": "unknown",
        "note": "The initial DRI form lists Fayetteville as the submitting local government and a form-stated point at 33.45435337191984, -84.51676089318552. Ordinance 25-O-34 identifies the rezoned property as parcels 0705 013 and 0705 019 on Veterans Parkway, Fayetteville. No street number is stated in the cited records."
      },
      "physical_scale": null,
      "sources": [
        {
          "title": "Georgia Department of Community Affairs (DCA)",
          "url": "https://apps.dca.ga.gov/DRI/Submissions.aspx",
          "type": "government",
          "retrieved": "2026-09-17",
          "locator": "View Submissions table; 3,176 ten-column data rows, DRI IDs 42-4843, initial-form dates 2001-07-09 to 2026-09-15; column headings exactly: DRI ID / Project / Development Type / County / City / RDC / Initial Info Form Submitted / Current Status / RDC Finding / GRTA Finding. The table has no Developer column and no parcel column; the 'City' column is headed 'City', not 'Submitting Local Government'.",
          "supports": "Statewide primary index of Developments of Regional Impact. 18 rows carry development type 'Technological Facility (Including Data Centers)'; a further 20 rows with data-centre project names sit under 'Industrial' or 'Any other development types'. Each row links to an AppSummary and to the local government's Initial DRI Information Form.",
          "source_type": "government",
          "source_id": "GA-S0025"
        },
        {
          "title": "Georgia Department of Community Affairs (DCA)",
          "url": "https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4603",
          "type": "government",
          "retrieved": "2026-09-17",
          "locator": "Initial DRI Information Form, DRI #4603: Submitting Local Government 'Fayetteville'; Individual completing form 'Julie Brown'; Name of Proposed Project 'ATL2 East'; Location (Street Address, GPS Coordinates, or Legal Land Lot Description) '33.45435337191984, -84.51676089318552'; Brief Description of Project 'The ATL2 East development consists of a 2M SF data center located  west of Veterans Parkway on an approximately 313 acre site.' (two spaces after 'located' in the source); Development Type radio checked = TECH; Project Size '2,000,000 SF'; Developer 'QTS Eastwood, LLC', 2470 Satellite Blvd., Duluth, GA 30096; 'Is property owner different from developer/applicant?' = No and the property-owner name field is empty; 'entirely located within your local government's jurisdiction' = Yes; 'Is the current proposal a continuation or expansion of a previous DRI?' = No; action requested = Other only, 'Entering into development agreement contract negotiations for the site.'; 'Is this project a phase or part of a larger overall project?' = No; Estimated Project Completion Dates - this phase 'n/a', overall project '2029'",
          "supports": "Local-government-filed Initial DRI Information Form naming the project, its host jurisdiction, size and applicant/developer.",
          "source_type": "government",
          "source_id": "GA-S0033"
        },
        {
          "title": "Georgia Department of Community Affairs (DCA)",
          "url": "https://apps.dca.ga.gov/DRI/AppSummary.aspx?driid=4603",
          "type": "government",
          "retrieved": "2026-09-17",
          "locator": "DRI Application Summary #4603: Project Name 'ATL2 East'; Submitting Local Government 'Fayetteville'; Developer 'QTS Eastwood, LLC'; Current Status 'Completed'; Projected Process Completion Date 4/24/2026; Application History - Initial DRI Information Form Submitted 1/13/2026, Additional DRI Information Form Submitted 3/18/2026, DRI Determination 3/25/2026 'Warrants regional review', Completeness Certification 3/25/2026, Request for Comments 4/21/2026, RDC Finding 4/21/2026, GRTA Finding blank",
          "supports": "State DRI review status record for the project.",
          "source_type": "government",
          "source_id": "GA-S0034"
        },
        {
          "title": "Georgia Department of Community Affairs (DCA)",
          "url": "https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=4603",
          "type": "government",
          "retrieved": "2026-09-18",
          "locator": "DRI Information Form Part 2, DRI #4603: no street address or parcel identifier anywhere on the form; Estimated Value at Build-Out '$ 3 Billion'; estimated annual local tax revenues '$ 29 Million'; estimated FTEs 'approximately 100'; water provider 'Fayette County Water System', demand '0.20' MGD; wastewater provider 'City of Fayetteville', flow '0.18' MGD; energy provider 'Georgia Power Company'; estimated peak connected electrical load 'TBD - dependent on customer usage. This informatio'; 'A new substation will be built on-site.'; impervious surface '60%'",
          "supports": "Absence of any stated megawatt figure; absence of any address or parcel identifier in the DRI record; utility providers and stated demand figures.",
          "source_type": "government",
          "source_id": "GA-S0035"
        },
        {
          "title": "City of Fayetteville, Georgia",
          "url": "https://www.fayetteville-ga.gov/DocumentCenter/View/4776/25-O-34",
          "type": "government",
          "published": "2025-12-18",
          "retrieved": "2026-09-18",
          "locator": "Ordinance No. 25-O-34, City of Fayetteville, adopted 18 December 2025. Cover block: 'Subject Matter: Rezoning Of Parcel Nos. 0705 013, 0705 019 (PCD to BP)'; 'Date of Public Hearing Before City Council: December 18, 2025'; 'Date of Adoption: December 18, 2025'; 'Date of Notice Published in Fayette County News: December 03, 2025'. Preamble: 'QTS Eastwood, LLC seeks to change the zoning of two parcels of land located on Veterans Parkway, Fayetteville, GA (Parcel Numbers 0705 013 and 0705 019)... currently zoned Planned Community District (PCD) and the Applicant desires to rezone the properties to Business Park (BP).' ARTICLE I conditions 1 and 2 require a Development Agreement incorporating Georgia Regional Transportation Authority recommendations from the Atlanta Regional Commission's Development of Regional Impact review, and bar issuance of any Building Permit until that agreement is approved. EXHIBIT 'A' Legal Description: three surveyed tracts joined by 'TOGETHER WITH', 'Said tract contains 80.2839 acres', '204.2805 acres (8,898,459 square feet)' and '28.5905 acres', surveyed by Point-to-Point Land Surveyors, Inc.; calls run along 'the westerly right-of-way line of Veterans Parkway' and along 'the east line of the lands of QTS Fayetteville I, LLC', 'the west line of the lands of QTS Fayetteville II DC9-10, LLC' and 'the south line of the lands of Trilith South, LLC, as recorded in Deed Book 5533, Page 13'",
          "supports": "Parcel identifiers, applicant of record, street location, surveyed acreage, the zoning change adopted and its date, the building-permit bar, and the named abutting landowners for the rezoned tract.",
          "source_type": "government",
          "source_id": "GA-S0036"
        },
        {
          "title": "City of Fayetteville, Georgia",
          "url": "https://www.fayetteville-ga.gov/DocumentCenter/View/4775/25-O-33",
          "type": "government",
          "published": "2025-12-18",
          "retrieved": "2026-09-18",
          "locator": "Ordinance No. 25-O-33, City of Fayetteville, adopted 18 December 2025: 'QTS Eastwood, LLC seeks to amend the Future Land Use Map for two parcels of land located on Veterans Parkway, Fayetteville, GA (Parcel Numbers 0705 013 and 0705 019)... presently designated as Activity Center (Innovation Mixed Use Center) on the FLU Map and the Applicant desires to change the designation to Business Park.'",
          "supports": "The companion Future Land Use Map amendment for the same two parcels and applicant.",
          "source_type": "government",
          "source_id": "GA-S0037"
        },
        {
          "title": "City of Fayetteville, Georgia",
          "url": "https://www.fayetteville-ga.gov/DocumentCenter/View/4062",
          "type": "government",
          "published": "2025-12-18",
          "retrieved": "2026-09-18",
          "locator": "City Council Action Minutes, 12-18-25, items 10 and 11: 'Consider Ordinance No. 25-O-33 - Amendment to the Future Land Use Map (FLU Map) for QTS East Campus: Presented by Director of Planning and Zoning Julie Brown - Motion - Stacy, Second - Langford, approved unan.' and 'Consider Ordinance No. 25-O-34 - Rezoning Request for QTS East Campus: Presented by Director of Planning and Zoning Julie Brown - Motion to approve with conditions - Hoffman, Second - Clark, approved unan.'",
          "supports": "The council's adoption of both ordinances on 2025-12-18 and the project name the city used for them.",
          "source_type": "government",
          "source_id": "GA-S0038"
        },
        {
          "title": "City of Fayetteville, Georgia",
          "url": "https://www.fayetteville-ga.gov/DocumentCenter/View/4005",
          "type": "government",
          "published": "2025-11-18",
          "retrieved": "2026-09-18",
          "locator": "Planning & Zoning Commission document dated 11/18/25, item 2: 'Consider requests from QTS Eastwood, LLC as they relate to the development of QTS East (parcel nos. 0705 013, 0705 019, & 0704 044).' Sub-item a, Future Land Use Map amendment for parcels 0705 013 & 0705 019 from Activity Center (Innovation Mixed Use Center) to Business Park, forwarded with a favorable recommendation, approved unanimously. Sub-item b, rezone parcels 0705 013 & 0705 019 from PCD to BP, forwarded with a favorable recommendation plus staff conditions, approved unanimously",
          "supports": "The applicant of record, the parcel list including 0704 044, and the commission's recommendations preceding the council's adoption.",
          "source_type": "government",
          "source_id": "GA-S0039"
        },
        {
          "title": "City of Fayetteville, Georgia",
          "url": "https://www.fayetteville-ga.gov/746/Data-Center-Discussion",
          "type": "government",
          "retrieved": "2026-09-18",
          "locator": "Data Center Discussion, Frequently Asked Questions: 'How many data centers are located in Fayetteville, Georgia?' - 'There is one data center campus in Fayetteville, QTS Data Centers, and it is located along Highway 54 West between Veteran's Parkway and Tyrone Road.'; 'Can more data centers come to Fayetteville?' - 'No. As of March 5, 2026, new data centers are prohibited in every City of Fayetteville zoning district. This prohibition was enacted by the Fayetteville City Council when they adopted Ordinance 26-0-12, which updated chapters 200 and 400 of the City's Unified Development Ordinance.'; 'How big is the QTS Data Centers facility in Fayetteville?' - 'The Quality Technology Services (QTS) Data Centers facility includes 13 buildings for a total of approximately 6.2 million square feet.'",
          "supports": "Host-jurisdiction statements on the number of data-centre campuses in the city, the QTS campus location and stated size, and the city-wide prohibition on new data centers effective 2026-03-05.",
          "source_type": "government",
          "source_id": "GA-S0040"
        },
        {
          "title": "City of Fayetteville, Georgia",
          "url": "https://www.fayetteville-ga.gov/DocumentCenter/View/4053",
          "type": "government",
          "published": "2025-12-18",
          "retrieved": "2026-09-18",
          "locator": "City Council Action Minutes, 12-18-25, second official copy; items 10 and 11 read identically to the copy at /DocumentCenter/View/4062",
          "supports": "Corroborates the cited council minutes on the two items this record relies on, and is cited so that the divergence between the two official copies at item 8 is visible to a reviewer rather than hidden.",
          "source_type": "government",
          "source_id": "GA-S0041"
        }
      ],
      "confidence": "medium",
      "missing_evidence": [
        "critical IT capacity (the Part 2 form answers peak connected electrical load as TBD)",
        "utility service capacity",
        "operator",
        "tenant",
        "owner of record (the DRI initial form states the property owner is not different from the developer/applicant but leaves the property-owner name field empty)",
        "street number",
        "whether parcel 0704 044 named in the 18 November 2025 Planning and Zoning item is part of the tract adopted under Ordinance 25-O-34, which names only 0705 013 and 0705 019",
        "whether ATL2 East is vested, grandfathered or exempt against City of Fayetteville Ordinance 26-O-12",
        "whether the development agreement required by Ordinance 25-O-34 has been executed",
        "current construction status on the ground",
        "overall build-out schedule beyond the stated 2029 date"
      ],
      "history": [
        {
          "date": "2025-11-18",
          "summary": "The Fayetteville Planning and Zoning Commission considered QTS Eastwood requests for parcels 0705 013, 0705 019 and 0704 044."
        },
        {
          "date": "2025-12-18",
          "summary": "City Council adopted Ordinance 25-O-33 (future land-use map) and Ordinance 25-O-34 (rezoning) for parcels 0705 013 and 0705 019. Zoning approval only."
        },
        {
          "date": "2026-01-13",
          "summary": "Initial DRI information was filed for ATL2 East in Fayetteville."
        },
        {
          "date": "2026-09-18",
          "field": "publication",
          "summary": "Added from the opened city ordinances and Georgia DRI filing. Adopted rezoning is recorded as zoning approval only."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "atl50-union-city-fulton-ga",
      "parent_id": null,
      "record_unit": "project",
      "current_name": "ATL50",
      "state": "GA",
      "city": "Union City",
      "county": "Fulton",
      "developer": "Microsoft",
      "operator": null,
      "operator_basis": {
        "finding": "not_named_in_cited_records",
        "sources": [
          {
            "locator": "https://apps.dca.ga.gov/DRI/Submissions.aspx",
            "source_id": "GA-S0025"
          },
          {
            "locator": "https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4843",
            "source_id": "GA-S0042"
          },
          {
            "locator": "https://apps.dca.ga.gov/DRI/AppSummary.aspx?driid=4843",
            "source_id": "GA-S0043"
          },
          {
            "locator": "https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4342",
            "source_id": "GA-S0044"
          }
        ]
      },
      "owner": null,
      "tenant": null,
      "lifecycle_status": "proposed",
      "status_attribution": "Georgia Department of Community Affairs (DCA); Initial DRI Information Form, DRI #4843, 'Brief Description of Project'; action requested checkbox = Permit; 'other action' = Masterplan Review; document date 2026-09-15",
      "status_basis": "Union City filed an initial DRI form on 15 September 2026 for ATL50, a proposed data-center development at 5235 Stonewall Tell Road. The requested local action is a permit and masterplan review. Filing a DRI does not establish approval, construction or operation.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "unknown",
        "aggregation_allowed": false
      },
      "location": {
        "address": "5235 Stonewall Tell Rd",
        "city": "Union City",
        "county": "Fulton",
        "precision": "approximate",
        "note": "The initial DRI form lists Union City as the submitting local government and 5235 Stonewall Tell Rd as the location, west of Stonewall Tell Road and north of Koweta Road. No parcel identifier is stated. A Union City parcel search was not completed (the host returned HTTP 403)."
      },
      "physical_scale": null,
      "sources": [
        {
          "title": "Georgia Department of Community Affairs (DCA)",
          "url": "https://apps.dca.ga.gov/DRI/Submissions.aspx",
          "type": "government",
          "retrieved": "2026-09-17",
          "locator": "View Submissions table; 3,176 ten-column data rows, DRI IDs 42-4843, initial-form dates 2001-07-09 to 2026-09-15; column headings exactly: DRI ID / Project / Development Type / County / City / RDC / Initial Info Form Submitted / Current Status / RDC Finding / GRTA Finding. The table has no Developer column and no parcel column; the 'City' column is headed 'City', not 'Submitting Local Government'. Rows relied on: #4843 'ATL50', Technological Facility (Including Data Centers), Fulton, Union City, ARC, 9/15/2026, Initial Form Submitted. #4342 'Stonewall Tell Data Center', Any other development types, Fulton, South Fulton, ARC, 12/6/2024, Completed. #2745 'South Fulton Parkway at Stonewall Tell', Wholesale & Distribution, Fulton, Union City, ARC, 11/15/2017, Completed. #4256 'Vantage Data Center - Westlake' and #4257 'Vantage Data Center - Stacks Rd', Industrial, Fulton, South Fulton, ARC, 8/13/2024, Completed.",
          "supports": "Statewide primary index of Developments of Regional Impact. 18 rows carry development type 'Technological Facility (Including Data Centers)'; a further 20 rows with data-centre project names sit under 'Industrial' or 'Any other development types'. Each row links to an AppSummary and to the local government's Initial DRI Information Form.",
          "source_type": "government",
          "source_id": "GA-S0025"
        },
        {
          "title": "Georgia Department of Community Affairs (DCA)",
          "url": "https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4843",
          "type": "government",
          "retrieved": "2026-09-17",
          "locator": "Initial DRI Information Form, DRI #4843: Submitting Local Government 'Union City'; Individual completing form 'Nina Shabazz'; Name of Proposed Project 'ATL50'; Location (Street Address, GPS Coordinates, or Legal Land Lot Description) '5235 Stonewall Tell Rd'; Brief Description of Project 'The site is located west of Stonewall Tell Road and north of Koweta Road. It is a data center development on 88.01 acres of land that consists of two, 3-story buildings totaling 910,000 square feet.'; Development Type radio checked = TECH (Technological Facility (Including Data Centers)); Project Size '88.01 total site acreage'; Developer 'Microsoft', 1 Microsoft Way, Attn: LAND (Land Acq 'N Development), Redmond, WA 98052; 'Is property owner different from developer/applicant?' = Yes, 'If yes, property owner: Lance Turner'; 'Is the proposed project entirely located within your local government's jurisdiction?' = Yes; 'Is the current proposal a continuation or expansion of a previous DRI?' = Yes, Project Name 'South Fulton Parkway at Stonewall Tell', DRI ID '2745'; action requested = Permit checkbox checked and Other described as 'Masterplan Review'; 'Is this project a phase or part of a larger overall project?' = No; Estimated Project Completion Dates - overall project '2032'",
          "supports": "Local-government-filed Initial DRI Information Form naming the project, its host jurisdiction, size and applicant/developer.",
          "source_type": "government",
          "source_id": "GA-S0042"
        },
        {
          "title": "Georgia Department of Community Affairs (DCA)",
          "url": "https://apps.dca.ga.gov/DRI/AppSummary.aspx?driid=4843",
          "type": "government",
          "retrieved": "2026-09-17",
          "locator": "DRI Application Summary #4843: Project Name 'ATL50'; Submitting Local Government 'Union City'; Developer 'Microsoft'; Current Status 'Initial Form Submitted'; Projected Process Completion Date blank; RDC 'Atlanta Regional Commission RD'; DRI Tier 'Metro'; GRTA Jurisdiction 'Yes'; Application History - Initial DRI Information Form Submitted 9/15/2026, with Additional DRI Information Form, DRI Determination, Completeness Certification, Request for Comments, RDC Finding and GRTA Finding all blank",
          "supports": "State DRI review status record for the project.",
          "source_type": "government",
          "source_id": "GA-S0043"
        },
        {
          "title": "Georgia Department of Community Affairs (DCA)",
          "url": "https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4342",
          "type": "government",
          "retrieved": "2026-09-18",
          "locator": "Initial DRI Information Form, DRI #4342: Submitting Local Government 'South Fulton'; Name of Proposed Project 'Stonewall Tell Data Center'; Location 'Lat: 33.615125, Long: -84.552224 / South of South Fulton Parkway and east of Stonewall Tell Road'; Brief Description 'New 1,902,000-square-foot data center development.'; Project Size '1,902,000 SF of data center use on approximately 59 acres.'; Development Type radio checked = OTHER (Any other development types); Developer 'RSC Investment Management LLC'; 'Is the proposed project entirely located within your local government's jurisdiction?' = No, additional jurisdiction 'Union City'; 'Is the current proposal a continuation or expansion of a previous DRI?' = No; action requested = Rezoning",
          "supports": "The site-identity crosswalk against the named possible duplicate: opposite side of Stonewall Tell Road, different lead jurisdiction, different developer, no shared DRI lineage.",
          "source_type": "government",
          "source_id": "GA-S0044"
        },
        {
          "title": "Georgia Department of Community Affairs (DCA)",
          "url": "https://apps.dca.ga.gov/DRI/AppSummary.aspx?driid=4342",
          "type": "government",
          "retrieved": "2026-09-18",
          "locator": "DRI Application Summary #4342: Developer 'RSC Investment Management LLC'; Current Status 'Completed'; Projected Process Completion Date 4/23/2025; Initial DRI Information Form Submitted 12/6/2024; DRI Determination 3/24/2025 'Warrants regional review'; RDC Finding 4/13/2025",
          "supports": "Status and developer of the named possible duplicate.",
          "source_type": "government",
          "source_id": "GA-S0045"
        },
        {
          "title": "Georgia Department of Community Affairs (DCA)",
          "url": "https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=2745",
          "type": "government",
          "retrieved": "2026-09-18",
          "locator": "Initial DRI Information Form, DRI #2745: Submitting Local Government 'Union City'; Name of Proposed Project 'South Fulton Parkway at Stonewall Tell'; Location 'Southwest quadrant of S. Fulton Pkwy./Stonewall Tell Road'; Brief Description 'A 221.8 acre tract to be developed into a total of 5 building totaling 2,095,000 square feet for warehouse/distribution uses.'; Project Size '2,095,000 square feet'; Development Type radio checked = WHOLDIST (Wholesale & Distribution); Developer 'Majestic Realty Co.'; 'Is the current proposal a continuation or expansion of a previous DRI?' = Yes, Project Name 'Accolades at Stonewall Tell', DRI ID '164'",
          "supports": "The prior DRI that #4843 continues: same west side of Stonewall Tell Road, same submitting jurisdiction, a larger 221.8-acre tract, and a different (warehouse and distribution) use.",
          "source_type": "government",
          "source_id": "GA-S0046"
        }
      ],
      "confidence": "medium",
      "missing_evidence": [
        "critical IT capacity",
        "utility service capacity",
        "operator",
        "tenant",
        "owner of record (the property-owner field names an individual with an e-mail at the developer's own domain; no owning legal entity is identified)",
        "parcel identifier for 5235 Stonewall Tell Rd",
        "current construction status on the ground",
        "whether the named developer is a Microsoft legal entity or an agent acting for one",
        "any DRI determination, completeness certification or regional finding (all blank as of capture)",
        "build-out schedule detail beyond the stated overall completion year 2032"
      ],
      "history": [
        {
          "date": "2026-09-15",
          "summary": "Union City filed initial DRI information for ATL50, requesting permit and masterplan review."
        },
        {
          "date": "2026-09-18",
          "field": "publication",
          "summary": "Added from the opened Georgia DRI filing. A neighbouring Stonewall Tell filing sits on the opposite side of the road and is not merged."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "gregory-road-data-center-newton-county-ga",
      "parent_id": null,
      "record_unit": "project",
      "current_name": "Gregory Road Data Center",
      "state": "GA",
      "city": null,
      "county": "Newton",
      "developer": "John B. Williams",
      "operator": null,
      "operator_basis": {
        "finding": "not_named_in_cited_records",
        "sources": [
          {
            "locator": "https://apps.dca.ga.gov/DRI/Submissions.aspx",
            "source_id": "GA-S0025"
          },
          {
            "locator": "https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4428",
            "source_id": "GA-S0047"
          },
          {
            "locator": "https://apps.dca.ga.gov/DRI/AppSummary.aspx?driid=4428",
            "source_id": "GA-S0048"
          },
          {
            "locator": "https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=4428",
            "source_id": "GA-S0049"
          }
        ]
      },
      "owner": "Multiple ownership, including developer & others: JBW Investments, LLC; JF Land Investments, LLC; Tide Investments, LLC; FW Johansen Investments, LLC; James Moss, LLC; and John B. Williams & Alyce Toonk.",
      "tenant": null,
      "lifecycle_status": "proposed",
      "status_attribution": "Georgia Department of Community Affairs (DCA); Initial DRI Information Form, DRI #4428, 'Brief Description of Project'; requested actions = Rezoning and, under 'Other', 'Annexation'; document date 2025-03-27. Newton County Board of Commissioners Resolution R050625, adopted 2025-05-06, objects to the annexation application under O.C.G.A. § 36-36-113. Lifecycle remains 'proposed': DRI process status 'Completed' is the state review process closing, not local approval, construction or operation.",
      "status_basis": "The opened records place the site in unincorporated Newton County. The applicant-written Initial DRI Information Form for DRI 4428 describes a proposed 'Data Center Campus occupying multiple buildings'; that applicant description is attributed and does not independently establish the canonical campus unit. The filing requested rezoning plus annexation into Covington. On 6 May 2025 the Newton County Board of Commissioners adopted Resolution R050625 objecting to that annexation. DRI process completion is not local approval, construction or operation.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "unknown",
        "aggregation_allowed": false
      },
      "location": {
        "address": null,
        "city": null,
        "county": "Newton",
        "precision": "unknown",
        "note": "The initial DRI form says the site is currently in unincorporated Newton County and would enter Covington city limits only with annexation. Newton County objected to that annexation on 6 May 2025. No annexation ordinance for this site appears in the 31 City of Covington council-minute sets published from 7 April 2025 through 6 July 2026. City is therefore null."
      },
      "physical_scale": null,
      "sources": [
        {
          "title": "Georgia Department of Community Affairs (DCA)",
          "url": "https://apps.dca.ga.gov/DRI/Submissions.aspx",
          "type": "government",
          "retrieved": "2026-09-17",
          "locator": "View Submissions table; 3,176 data rows, DRI IDs 1-4843, initial-form dates 2001-07-09 to 2026-09-15; columns DRI ID / Project / Development Type / County / City / RDC / Initial Info Form Submitted / Current Status",
          "supports": "Statewide primary index of Developments of Regional Impact. 18 rows carry development type 'Technological Facility (Including Data Centers)'; a further 20 rows with data-centre project names sit under 'Industrial' or 'Any other development types'. Each row links to an AppSummary and to the local government's Initial DRI Information Form.",
          "source_type": "government",
          "source_id": "GA-S0025"
        },
        {
          "title": "Georgia Department of Community Affairs (DCA)",
          "url": "https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4428",
          "type": "government",
          "retrieved": "2026-09-17",
          "locator": "Initial DRI Information Form, DRI #4428: Submitting Local Government 'Covington'; Project 'Gregory Road Data Center'; Description 'Data Center Campus occupying multiple buildings up to 1,410,000 square feet on approximately ±213.0 acres (with ± 307.50 acres of residential with approximately 27 lots for a total of ±520 acres)'; Developer 'John B. Williams'; Development Type field 'Industrial (Data Warehouse) & residential'; additional jurisdiction note 'Currently in Newton County unincorporated.'",
          "supports": "Local-government-filed Initial DRI Information Form naming the project, its host jurisdiction, size and applicant/developer.",
          "source_type": "government",
          "source_id": "GA-S0047"
        },
        {
          "title": "Georgia Department of Community Affairs (DCA)",
          "url": "https://apps.dca.ga.gov/DRI/AppSummary.aspx?driid=4428",
          "type": "government",
          "retrieved": "2026-09-18",
          "locator": "DRI Application Summary, DRI #4428: Current Status 'Completed'; RDC 'Northeast Georgia RDC'; DRI Tier 'Metro'; GRTA Jurisdiction? 'No'; Initial Form 3/27/2025; Additional Form 3/31/2025; DRI Determination 4/11/2025 'Warrants regional review'; Completeness Certification 4/11/2025; Request for Comments 4/16/2025; RDC Finding 5/6/2025",
          "supports": "State process record for this DRI. Establishes the process timeline only; it states no jurisdiction, address, parcel, operator or capacity.",
          "source_type": "government",
          "source_id": "GA-S0048"
        },
        {
          "title": "Georgia Department of Community Affairs (DCA)",
          "url": "https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=4428",
          "type": "government",
          "retrieved": "2026-09-18",
          "locator": "DRI Information Form Part 2, DRI #4428: 'Energy Supply' (peak connected electrical load BLANK, provider BLANK); 'Water Supply' provider 'Newton County Water & Sewerage Authority', demand '±1.08 MGD'; 'Wastewater Disposal' provider 'Undesignated'; 'Land Transportation' '127 peak & approx. 494 trips per day'",
          "supports": "Second half of the same local-government DRI filing. Records that no electrical load figure was supplied, and that the named water provider and the body that must designate a wastewater provider are Newton County bodies.",
          "source_type": "government",
          "source_id": "GA-S0049"
        },
        {
          "title": "Newton County, Georgia, Board of Commissioners",
          "url": "https://www.newtoncountyga.gov/documentcenter/view/7233",
          "type": "government",
          "published": "2025-05-06",
          "retrieved": "2026-09-18",
          "locator": "Regular Meeting minutes, May 6, 2025, item 'BOARD CONSIDERATION OF THE CITY OF COVINGTON ANNEXATION OF PROPERTY ALONG GREGORY ROAD, HICKORY HILL ROAD, CORNISH MOUNTAIN ROAD, AND FLAT ROCK ROAD. (APPROXIMATELY 520.50 ACRES)'",
          "supports": "The county's own record of the Covington annexation request for this site: 520.5 acres, 18 tracts, ±213 acres to City M-2 for a Data Center Campus, ±307.5 acres to City NR-1 residential, and the express statement 'End user not yet known'. Motion carried 3/1/1.",
          "source_type": "government",
          "source_id": "GA-S0050"
        },
        {
          "title": "Newton County, Georgia, Board of Commissioners",
          "url": "https://www.newtoncountyga.gov/documentcenter/view/7246",
          "type": "government",
          "published": "2025-05-06",
          "retrieved": "2026-09-18",
          "locator": "Resolution R050625, 'A RESOLUTION ... OBJECTING TO THE ANNEXATION OF PROPERTY BY THE CITY OF COVINGTON, GEORGIA', resolving clause and adoption date",
          "supports": "The operative instrument. The county objects to the annexation application under O.C.G.A. § 36-36-113 and directs notice to the City and to DCA. Establishes that the annexation was contested, not completed.",
          "source_type": "government",
          "source_id": "GA-S0051"
        },
        {
          "title": "City of Covington, Georgia",
          "url": "http://cityofcovington.org/ckeditorfiles/files/2026_CityCouncil_0120_Minutes.pdf",
          "type": "government",
          "published": "2026-01-20",
          "retrieved": "2026-09-18",
          "locator": "Regular Council Meeting minutes, January 20, 2026, items 2, 5 and 6",
          "supports": "City ratifies a limited moratorium until July 4, 2026 on acceptance of applications for Data Center Development, and denies two annexation applications, PAR25.0003 Falcon Wood and PAR25.0004 Alcovy Rise. Neither denied application is identified in the minutes as this site.",
          "source_type": "government",
          "source_id": "GA-S0052"
        },
        {
          "title": "City of Covington, Georgia",
          "url": "http://cityofcovington.org/ckeditorfiles/files/2026_CityCouncil_0706_Minutes.pdf",
          "type": "government",
          "published": "2026-07-06",
          "retrieved": "2026-09-18",
          "locator": "Regular Council Meeting minutes, July 6, 2026, item 3",
          "supports": "The data-center application moratorium is extended until October 20, 2026. This is the most recent set of council minutes the city had published as at 2026-09-18.",
          "source_type": "government",
          "source_id": "GA-S0053"
        },
        {
          "title": "City of Covington, Georgia",
          "url": "https://www.cityofcovington.org/index.php?section=Council-Meetings",
          "type": "government",
          "retrieved": "2026-09-18",
          "locator": "Council Meetings index; 45 minutes PDFs linked, 2024-08-05 through 2026-07-06",
          "supports": "Negative evidence of record. All 31 sets of minutes covering 2025-04-07 through 2026-07-06 were retrieved and text-searched; Gregory Road does not appear in any of them, and no annexation ordinance for this site appears.",
          "source_type": "government",
          "source_id": "GA-S0054"
        }
      ],
      "confidence": "medium",
      "missing_evidence": [
        "whether the annexation was later completed, withdrawn, or resolved after the county objection",
        "critical IT capacity",
        "utility service capacity",
        "estimated peak connected electrical load (the state form field was filed blank)",
        "operator",
        "tenant or end user (the county record states the end user is not yet known)",
        "street address",
        "parcel identifiers",
        "the complete list of owners of all 18 tracts",
        "current construction status on the ground",
        "whether rezoning was granted by any jurisdiction",
        "City of Covington council minutes after 6 July 2026",
        "how the residential and data-centre components were ultimately split"
      ],
      "history": [
        {
          "date": "2025-03-27",
          "summary": "Initial DRI information was filed for the Gregory Road Data Center, requesting rezoning and annexation."
        },
        {
          "date": "2025-03-31",
          "summary": "The DRI application summary records that the additional DRI form was submitted. The Part 2 form itself bears no date."
        },
        {
          "date": "2025-04-11",
          "summary": "The state DRI determination recorded that the filing warrants regional review."
        },
        {
          "date": "2025-05-06",
          "summary": "Newton County adopted Resolution R050625 objecting to the Covington annexation application under O.C.G.A. § 36-36-113."
        },
        {
          "date": "2026-01-20",
          "summary": "The City of Covington ratified a limited moratorium on accepting data-center development applications."
        },
        {
          "date": "2026-07-06",
          "summary": "The City of Covington extended that moratorium to 20 October 2026."
        },
        {
          "date": "2026-09-18",
          "field": "publication",
          "summary": "Added from the opened Georgia DRI filing and Newton County objection. Covington is not assigned as the host city."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "goodman-energy-park-data-center-vernon-ca",
      "parent_id": null,
      "record_unit": "campus",
      "current_name": "Goodman Energy Park (GEP) data center",
      "state": "CA",
      "city": "Vernon",
      "county": "Los Angeles County",
      "developer": null,
      "operator": null,
      "operator_basis": {
        "finding": "not_named_in_cited_records",
        "sources": [
          {
            "locator": "https://ceqanet.lci.ca.gov/2026080118",
            "source_id": "CA-S0043"
          },
          {
            "locator": "https://www.energy.ca.gov/powerplant/backup-generating-system/vernon-backup-generating-facility-vbgf",
            "source_id": "CA-S0021"
          }
        ]
      },
      "owner": null,
      "tenant": null,
      "lifecycle_status": "proposed",
      "status_attribution": "Governor's Office of Land Use and Climate Innovation (LCI) / State Clearinghouse CEQAnet, SCH 2026080118; Document Type row 'NOP - Notice of Preparation of a Draft EIR'; Document Description, first sentence. The CEQAnet date label for 2026-08-05 is 'Received' - receipt of the notice by the State Clearinghouse, not a publication or posting date. California Energy Commission project page for the Vernon Backup Generating Facility, docket 25-SPPE-01, summary table row 'Project Status: Under Review'. A Notice of Preparation begins CEQA environmental review; it is not an approval, exemption, permit, entitlement, construction start or operation.",
      "status_basis": "A CEQAnet Notice of Preparation received on 5 August 2026, and the California Energy Commission project page for docket 25-SPPE-01, describe a proposed Goodman Energy Park data-center campus of two buildings in Vernon with a backup generating facility still under review. A notice of preparation is not an approval, permit, construction start or operation. A CEC Project Owner row for the backup-generating-facility docket is not campus ownership.",
      "capacity": {
        "value": 99,
        "unit": "MW",
        "kind": "onsite_generation_planned",
        "scope": "campus",
        "aggregation_allowed": false,
        "qualifier": "up to",
        "note": "Proposed emergency backup generation only. The CEC page states the facility would be used exclusively to provide up to 99 MW of backup emergency generation when Vernon Public Utility electricity is unavailable. This is not IT load, utility service capacity, or permitted generation. Do not aggregate it with other figures."
      },
      "location": {
        "address": null,
        "city": "Vernon",
        "county": "Los Angeles County",
        "precision": "approximate",
        "note": "CEQAnet and the CEC page place two data-center buildings at 3163 and 3049 East Vernon Avenue, Vernon, on parcels 6303-005-035 and 6303-005-036."
      },
      "physical_scale": "Two data-center buildings at 3163 and 3049 East Vernon Avenue, as stated in the CEC and CEQAnet notices.",
      "sources": [
        {
          "title": "Governor's Office of Land Use and Climate Innovation (LCI) / State Clearinghouse CEQAnet",
          "url": "https://ceqanet.lci.ca.gov/2026080118",
          "type": "government",
          "retrieved": "2026-09-17",
          "locator": "SCH 2026080118, NOP document page 'Vernon Backup Generating Facility'; Summary rows SCH Number / Lead Agency / Document Type / Received; Document Description; Contact Information; Location Parcel Number; Total Acres; Notice of Completion review-period rows",
          "supports": "CEQAnet listing for the California Energy Commission Notice of Preparation of a Draft EIR, received by the State Clearinghouse 8/5/2026. Lead Agency: California Energy Commission. Document Description states that GIC Vernon LLC is applying to the CEC for a Small Power Plant Exemption for the Vernon Backup Generating Facility, a 99 MW emergency only power system that will support the Goodman Energy Park (GEP) data center in the City of Vernon; that the GEP consists of two data center buildings near Vernon Avenue and Soto Street at 3163 and 3049 East Vernon Avenue; forty (40) diesel generators, thirty eight (38) at 3 MW for data center critical loads and two 1 MW house generators; designed to operate only when electricity from Vernon Public Utility is unavailable; will not connect to the regional transmission grid or export power. Location rows give Cities 'Vernon', Counties 'Los Angeles', Cross Streets 'Vernon Avenue and Soto Street', Zip 90058, Total Acres 11.55, Parcel # 6303-005-035 and 6303-005-036, Coordinates 34°0'24.89\"N 118°13'4.68\"W. Contact Information names Ward Mace, Agency Name GIC Vernon LLC, Job Title Regional Director, Contact Types 'Project Applicant'.",
          "source_type": "government",
          "source_id": "CA-S0043"
        },
        {
          "title": "Vernon Backup Generating Facility (VBGF) - California Energy Commission project page",
          "url": "https://www.energy.ca.gov/powerplant/backup-generating-system/vernon-backup-generating-facility-vbgf",
          "type": "government",
          "retrieved": "2026-09-18",
          "locator": "Summary table rows 'Project Owner', 'Docket Number', 'Capacity', 'Location', 'Technology', 'Project Status', 'Project Type'; 'Project Description' paragraphs 1-2; 'Data Centers' section; 'Small Power Plant Exemption' section",
          "supports": "California Energy Commission project page for docket 25-SPPE-01. Summary table: Project Owner 'GIC Vernon LLC'; Capacity '99 MW'; Location 'Vernon, California'; Technology 'Backup Generating System'; Project Status 'Under Review'; Project Type 'Small Power Plant Exemption'. Project Description states the VBGF would consist of forty (40) diesel fired generators used exclusively to provide up to 99 megawatts (MW) of backup emergency generation to support the Goodman Energy Park Data Center (GEP) when electricity from Vernon Public Utility (VPU) is unavailable; that the GEP would consist of two data center buildings, Building 1 at 3163 East Vernon Avenue and Building 2 at 3049 East Vernon Avenue; that the VBGF would not be electrically interconnected to the transmission grid; that VPU would own and operate a new switching station on the GEP site; and that the project applicant GIC Vernon would own and operate the Project Substation. The page states the CEC does not permit data centers, and that in granting an SPPE the CEC is not the final approval necessary for construction and operation of a project.",
          "source_type": "government",
          "source_id": "CA-S0021"
        }
      ],
      "confidence": "medium",
      "missing_evidence": [
        "critical IT capacity",
        "utility service capacity or requested load from Vernon Public Utility",
        "developer",
        "operator",
        "tenant",
        "owner of the data-center buildings as distinct from the backup-generating-facility docket applicant",
        "whether the City of Vernon has granted any land-use entitlement",
        "whether the CEC has granted or denied the Small Power Plant Exemption",
        "building floor areas",
        "construction start or completion dates"
      ],
      "history": [
        {
          "date": "2026-08-05",
          "summary": "The State Clearinghouse received the CEC Notice of Preparation of a Draft EIR (SCH 2026080118). Received is not a publication or approval date."
        },
        {
          "date": "2026-09-18",
          "field": "publication",
          "summary": "Added from the opened CEQAnet and CEC records. Backup-generation capacity is recorded as proposed onsite generation, not IT load."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "northtown-data-center-san-jose-ca",
      "parent_id": null,
      "record_unit": "campus",
      "current_name": "Northtown Data Center (NTDC)",
      "state": "CA",
      "city": "San Jose",
      "county": "Santa Clara County",
      "developer": null,
      "operator": null,
      "operator_basis": {
        "finding": "not_named_in_cited_records",
        "sources": [
          {
            "locator": "https://ceqanet.lci.ca.gov/2026070839",
            "source_id": "CA-S0044"
          },
          {
            "locator": "https://www.energy.ca.gov/powerplant/backup-generating-system/northtown-backup-generating-facility",
            "source_id": "CA-S0015"
          }
        ]
      },
      "owner": null,
      "tenant": null,
      "lifecycle_status": "proposed",
      "status_attribution": "Governor's Office of Land Use and Climate Innovation (LCI) / State Clearinghouse CEQAnet, SCH 2026070839; Document Type row 'NOP - Notice of Preparation of a Draft EIR'; Document Description, first sentence. The CEQAnet date label for 2026-07-21 is 'Received' - receipt of the notice by the State Clearinghouse, not a publication or posting date. California Energy Commission project page for the NorthTown Backup Generating Facility, docket 25-SPPE-02, summary table row 'Project Status: Under Review'. A Notice of Preparation begins CEQA environmental review; it is not an approval, exemption, permit, entitlement, construction start or operation.",
      "status_basis": "A CEQAnet Notice of Preparation received on 21 July 2026, and the California Energy Commission project page for docket 25-SPPE-02, describe a proposed Northtown Data Center campus of two buildings in San Jose with a backup generating facility still under review. A notice of preparation is not an approval, permit, construction start or operation. A CEC Project Owner row for the backup-generating-facility docket is not campus ownership.",
      "capacity": {
        "value": 97.3,
        "unit": "MW",
        "kind": "onsite_generation_planned",
        "scope": "campus",
        "aggregation_allowed": false,
        "qualifier": "up to",
        "note": "Proposed emergency backup generation only. Both cited records describe up to 97.3 MW of backup emergency generation for the campus. This is not IT load, utility service capacity, or permitted generation, and it must not be summed with the 110 MVA substation rating."
      },
      "location": {
        "address": null,
        "city": "San Jose",
        "county": "Santa Clara County",
        "precision": "approximate",
        "note": "CEQAnet and the CEC page describe the site as the southwest corner of West Trimble Road and Orchard Parkway, San Jose, on parcels 101-02-018 and 101-02-021."
      },
      "physical_scale": "Two data-center buildings labelled DC North and DC West in the CEC notice.",
      "sources": [
        {
          "title": "Governor's Office of Land Use and Climate Innovation (LCI) / State Clearinghouse CEQAnet",
          "url": "https://ceqanet.lci.ca.gov/2026070839",
          "type": "government",
          "retrieved": "2026-09-17",
          "locator": "SCH 2026070839, NOP document page 'Northtown Backup Generating Facility'; Summary rows SCH Number / Lead Agency / Document Type / Received; Document Description; Contact Information; Location Parcel Number; Total Acres; Notice of Completion review-period rows",
          "supports": "CEQAnet listing for the California Energy Commission Notice of Preparation of a Draft EIR, received by the State Clearinghouse 7/21/2026. Lead Agency: California Energy Commission. Document Description states the NTBGF would consist of forty two (42) diesel-fired generators used exclusively to provide up to 97.3 megawatts of backup emergency generation to support Northtown Data Center (NTDC) to provide uninterrupted power for its tenants servers; the site is the southwest corner of West Trimble Road and Orchard Parkway in San José; the data center buildings, emergency backup generating facilities, project substation, water storage and treatment area, the PG&E switching station, site circulation and parking would be located on APNs 101-02-018 and 101-02-021; the entire project site is approximately 28.5 acres; the NTBGF would only provide interconnection to the NTDC and would not be interconnected to the transmission or distribution grid; a new 115-34.5 kV, 110 MVA two-bay project substation would be built; of the 42 generators two would be up to 1.75 MW and forty would be 3 MW, eight of the forty redundant; the generators would be arranged in two generation yards adjacent to each data center building (DC North and DC West). Location rows give Cities 'San Jose', Counties 'Santa Clara', Cross Streets 'West Trimble Road and Orchard Parkway', Zip 95131, Total Acres 28.5, Parcel # 101-02-018 and 101-02-021, Coordinates 37°22'51.62\"N 121°56'2.55\"W. Contact Information names Ward Mace, Agency Name GIC San Jose LLC, Job Title Regional Director, Contact Types 'Project Applicant'.",
          "source_type": "government",
          "source_id": "CA-S0044"
        },
        {
          "title": "NorthTown Backup Generating Facility - California Energy Commission project page",
          "url": "https://www.energy.ca.gov/powerplant/backup-generating-system/northtown-backup-generating-facility",
          "type": "government",
          "retrieved": "2026-09-18",
          "locator": "Summary table rows 'Project Owner', 'Docket Number', 'Capacity', 'Location', 'Technology', 'Project Status', 'Project Type'; 'Project Description' paragraphs 1-4; 'Data Centers' section; 'Small Power Plant Exemption' section",
          "supports": "California Energy Commission project page for docket 25-SPPE-02. Summary table: Project Owner 'GIC San Jose, LLC'; Capacity '97.3 MW'; Location 'San José, California'; Technology 'Backup Generating System'; Project Status 'Under Review'; Project Type 'Small Power Plant Exemption'. Project Description states the NTBGF would consist of forty two (42) diesel-fired generators used exclusively to provide up to 97.3 megawatts (MW) of backup emergency generation to support NorthTown Data Center (NTDC) to provide uninterrupted power for its tenant's servers; gives the site, parcels and acreage; states the NTBGF would only interconnect to the NTDC and not to the transmission or distribution grid; describes the 115-34.5 kV, 110 MVA two-bay project substation and its 2-to-make-1 design; and names the two data center buildings DC North and DC West. The page states the CEC does not permit data centers, and that in granting an SPPE the CEC is not the final approval necessary for construction and operation of a project.",
          "source_type": "government",
          "source_id": "CA-S0015"
        }
      ],
      "confidence": "medium",
      "missing_evidence": [
        "critical IT capacity",
        "utility service capacity or requested load",
        "developer",
        "operator",
        "tenant",
        "owner of the data-center buildings as distinct from the backup-generating-facility docket applicant",
        "whether the City of San Jose has granted any land-use entitlement",
        "whether the CEC has granted or denied the Small Power Plant Exemption",
        "building floor areas",
        "construction start or completion dates"
      ],
      "history": [
        {
          "date": "2026-07-21",
          "summary": "The State Clearinghouse received the CEC Notice of Preparation of a Draft EIR (SCH 2026070839). Received is not a publication or approval date."
        },
        {
          "date": "2026-09-18",
          "field": "publication",
          "summary": "Added from the opened CEQAnet and CEC records. Backup-generation capacity is recorded as proposed onsite generation, not IT load."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "microsoft-chicago-data-center-northlake-il",
      "parent_id": null,
      "record_unit": "operating_facility",
      "current_name": "Microsoft Corp-Chicago Data Center",
      "state": "IL",
      "city": "Northlake",
      "county": null,
      "developer": null,
      "operator": null,
      "operator_basis": {
        "finding": "not_named_in_cited_records",
        "sources": [
          {
            "locator": "https://epa.illinois.gov/content/soi/epa/en/topics/environmental-justice/ej-notification-letters/jcr:content/responsivegrid/container/container/data_table_copy.datatablejson.json",
            "source_id": "IL-S0025"
          },
          {
            "locator": "https://epa.illinois.gov/content/dam/soi/en/web/epa/topics/environmental-justice/documents/notification-letters/Microsoft%20Corp-Chicago%20Data%20Center%20031807AAN%20FESOP%2009070018.pdf",
            "source_id": "IL-S0027"
          }
        ]
      },
      "owner": null,
      "tenant": null,
      "lifecycle_status": "operating",
      "status_as_of": "2024-08-05",
      "status_attribution": "Illinois EPA, Office of Environmental Justice; Illinois EPA EJ notification letter dated August 5, 2024, BOA ID# 031807AAN, body paragraphs 2-3; document date 2024-08-05. Status is as of 2024-08-05 and is not a statement about the present: the letter records that the Illinois EPA had received an application to renew Federally Enforceable State Operating Permit 09070018, that the application was 'not requesting changes to the facility or operation', that it was then 'currently under review by the BOA', and that 'This is a computer server facility.'",
      "status_basis": "An Illinois EPA environmental-justice letter dated 5 August 2024 names Microsoft Corp-Chicago Data Center at 601 Northwest Avenue, Northlake, as a computer server facility and records a then-pending application to renew Federally Enforceable State Operating Permit 09070018 without requested changes to the facility or operation. That letter supports operation as of 5 August 2024. The later source-retrieval date is only when the source was retrieved. Current operating status is not independently established.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "unknown",
        "aggregation_allowed": false
      },
      "location": {
        "address": "601 Northwest Avenue, Northlake, Illinois 60164",
        "city": "Northlake",
        "county": null,
        "precision": "exact",
        "note": "Address stated in the 5 August 2024 Illinois EPA letter and the matching EJ table row. County is not stated in the cited records and is left null."
      },
      "physical_scale": null,
      "sources": [
        {
          "title": "Illinois EPA, Office of Environmental Justice",
          "url": "https://epa.illinois.gov/content/soi/epa/en/topics/environmental-justice/ej-notification-letters/jcr:content/responsivegrid/container/container/data_table_copy.datatablejson.json",
          "type": "government",
          "retrieved": "2026-09-17",
          "locator": "EJ Notification Letters data table, 596 rows; data-center rows cited individually by facility name + BOA ID + application number + letter date",
          "supports": "Statewide index slice. 596 rows of Illinois EPA environmental-justice permit notification letters, each with facility name, street address, media, BOA site ID, permit type, application number, EJ-area flag and letter date. Data-center rows located include: Aligned Data Center (EGV) PropCo LLC, 50 and 150 NW Point Blvd, Elk Grove Village, 031440AWF, Construction Permit 24050021, 6/21/2024; CyrusOne CHI6 Facility, 460 and 480 Bryn Mawr Ave, Wood Dale, 043120AEZ, Construction Permit 24060010, 6/18/2024; Elk Grove Village (CHI 10-11-12) Data Center, 201 Innovation Drive, 031440AUK, Construction Permit 24070017, 8/21/2024; Prime Data Centers, 1600 E Higgins Rd, Elk Grove Village, 031440AWZ, Construction Permit 24090003, 10/3/2024; Colovore LLC, 4245 Meridian Parkway, Aurora, 043407AEM, 25070018, 8/14/2025; Colovore LLC, 1345 West Washington Street, West Chicago, 043090AKS, 25120015, 5/18/2026; Equinix CH-5 Data Center, 2001 Lunt Avenue, Elk Grove Village, 031440AVZ, 26010002, 2/10/2026.",
          "source_type": "government",
          "source_id": "IL-S0025"
        },
        {
          "title": "Illinois EPA, Office of Environmental Justice",
          "url": "https://epa.illinois.gov/content/dam/soi/en/web/epa/topics/environmental-justice/documents/notification-letters/Microsoft%20Corp-Chicago%20Data%20Center%20031807AAN%20FESOP%2009070018.pdf",
          "type": "government",
          "published": "2024-08-05",
          "retrieved": "2026-09-17",
          "locator": "Letter dated August 5, 2024; Re line and body paragraphs 2-3",
          "supports": "Names 'Microsoft Corp-Chicago Data Center' (Illinois EPA BOA ID# 031807AAN) at 601 Northwest Avenue in Northlake, states an application was received for renewal of Federally Enforceable State Operating Permit 09070018, that the application is not requesting changes to the facility or operation, and that 'This is a computer server facility.'",
          "source_type": "government",
          "source_id": "IL-S0027"
        }
      ],
      "confidence": "high",
      "missing_evidence": [
        "critical IT capacity",
        "building count",
        "county",
        "owner and operator as named roles",
        "whether the DCEO Data Center Investment Program row Microsoft Corporation / 2021 / Northlake is this facility (the 2025 and 2021 DCEO annual reports were read in full and do not publish a street address that would confirm or exclude the match)",
        "the later outcome of FESOP 09070018 (the Bureau of Air public-notice search endpoint was not successfully queried: the HTML pages return an empty table and populate results by HTTP POST, which was not run)"
      ],
      "history": [
        {
          "date": "2024-08-05",
          "summary": "Illinois EPA issued an environmental-justice notice of a FESOP renewal application for Microsoft Corp-Chicago Data Center in Northlake, describing a computer server facility with no requested operational change."
        },
        {
          "date": "2026-09-18",
          "field": "publication",
          "summary": "Added from the opened Illinois EPA notice. The DCEO Northlake Microsoft incentive award is not treated as the same facility."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "google-bermuda-hundred-data-center-campus-va",
      "parent_id": null,
      "record_unit": "campus",
      "current_name": "Google Bermuda Hundred Data Center Campus",
      "state": "VA",
      "city": null,
      "county": "Chesterfield County",
      "developer": null,
      "operator": null,
      "owner": null,
      "tenant": null,
      "lifecycle_status": "construction",
      "status_attribution": "Chesterfield County data-center project status table as of July 2026, Peanut LLC row",
      "status_basis": "Chesterfield County's Data Center Project Status table as of July 2026 lists Peanut LLC at 2100 Bermuda Hundred Road as under construction with three buildings. The same county page attributes Google's Bermuda Hundred Road property as one of three planned data-center sites with county agreements. A 2025 county newsflash quotes a company spokesperson with mixed groundbreaking language in one paragraph; that mixed sentence is not used as the construction locator. These records support a campus under construction. They do not establish current land title, an operator legal role, a street-number reconciliation among 2100, 2400 and 2700 Bermuda Hundred Road, or any IT-load figure.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "campus",
        "aggregation_allowed": false,
        "note": "No selected county record states critical-IT, utility-request, utility-service, generation, gross-facility, company-design or measured-load MW. The county's 6.000 MGD maximum public water use for this row is water, not IT load, and is not published as capacity."
      },
      "location": {
        "address": "2100 Bermuda Hundred Road",
        "city": null,
        "county": "Chesterfield County",
        "precision": "approximate",
        "note": "July 2026 county status table locator. A 2020 county agreement Exhibit A describes tracts at 2400 and 2700 Bermuda Hundred Road. No selected record reconciles those street numbers."
      },
      "physical_scale": "The county status table lists three buildings under construction. A county newsflash describes a 300-plus-acre Bermuda Hundred site; a 2020 county agreement recital describes approximately 305 acres. Those acreage figures are described site area, not a surveyed current campus boundary, and are not IT load, floor area or white space.",
      "sources": [
        {
          "title": "Chesterfield County Data Centers — Project Status as of July 2026",
          "url": "https://www.chesterfield.gov/datacenters",
          "type": "county project status page",
          "published": null,
          "retrieved": "2026-09-19",
          "locator": "Heading Data Center Project Status as of July 2026; Peanut LLC row (address and status); FAQ paragraphs attributing Google's Bermuda Hundred Road property and the three planned sites",
          "supports": "Peanut LLC row under construction with three buildings at 2100 Bermuda Hundred Road; Google as named agreement party for three planned county data-center sites; not operator, title owner or IT load.",
          "source_type": "government"
        },
        {
          "title": "In Google, Chesterfield landed the 'Rolls-Royce of data center operators'",
          "url": "https://www.chesterfield.gov/m/newsflash/Home/Detail/6383",
          "type": "county newsflash",
          "published": "2025-08-28",
          "retrieved": "2026-09-19",
          "locator": "Paragraph beginning According to company spokesperson Amber Tillman",
          "supports": "300-plus-acre Bermuda Hundred site described as a planned multiphase data-center campus; mixed groundbreaking language not used as construction status.",
          "source_type": "government"
        },
        {
          "title": "Fixed Tax Rate and Water and Wastewater Capacity and Service Agreement — Peanut LLC",
          "url": "https://www.chesterfield.gov/DocumentCenter/View/48235/Peanut-Tax-Rate-and-Water-Agreement-PDF",
          "type": "county agreement",
          "published": "2020",
          "retrieved": "2026-09-19",
          "locator": "Recital A; Exhibit A Tract I 2400 Bermuda Hundred Road and Tract II 2700 Bermuda Hundred Road",
          "supports": "2020 Peanut LLC agreement party and acreage recital; Exhibit A street numbers that conflict with the 2100 status-table locator; not current title or construction status.",
          "source_type": "government"
        }
      ],
      "confidence": "medium",
      "missing_evidence": [
        "current fee-simple owner after any closing",
        "operator and tenant legal roles",
        "reconciliation of 2100 versus 2400 and 2700 Bermuda Hundred Road",
        "city or place name",
        "parcel identifiers and coordinates",
        "critical-IT, utility-request, utility-service, generation, gross-facility, company-design and measured-load capacity",
        "building floor area and a surveyed campus boundary"
      ],
      "history": [
        {
          "date": "2020",
          "summary": "Chesterfield County and Peanut LLC signed a tax-rate and water-capacity agreement reciting an evaluation of acquiring about 305 acres; the recitals do not prove a later closing or current construction."
        },
        {
          "date": "2026-07",
          "summary": "Chesterfield County published a project-status table listing Peanut LLC at 2100 Bermuda Hundred Road as under construction with three buildings."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "google-upper-magnolia-green-site-va",
      "parent_id": null,
      "record_unit": "project",
      "current_name": "Google Upper Magnolia Green Data Center Project",
      "state": "VA",
      "city": null,
      "county": "Chesterfield County",
      "developer": null,
      "operator": null,
      "owner": null,
      "tenant": null,
      "lifecycle_status": "approved",
      "status_attribution": "Chesterfield County data-center project status table as of July 2026, Upper Magnolia Green row",
      "status_basis": "Chesterfield County's Data Center Project Status table as of July 2026 lists Upper Magnolia Green at 4201 Moseley Road as zoning approved, with the number of buildings not specified. The county page states the Upper Magnolia Green and Watkins Centre sites were rezoned for data-center use in May 2025. Opened Case 25SN1038 is a multi-parcel rezoning whose Tract A is limited to data-center use. These records support an approved project. They do not establish construction, operation, current land title, an operator legal role, or any IT-load figure.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "site",
        "aggregation_allowed": false,
        "note": "No selected county record states critical-IT or other MW. Tract A acreage is described site area, not capacity. The county's 1.755 MGD maximum public water use is water, not IT load."
      },
      "location": {
        "address": "4201 Moseley Road",
        "city": null,
        "county": "Chesterfield County",
        "precision": "approximate",
        "note": "July 2026 county status-table locator. Case 25SN1038 lists multiple parcels including 4200 Moseley Road and 4201 Mt. Hermon Road."
      },
      "physical_scale": "Case 25SN1038 defines Tract A as approximately 880.23 acres limited to data-center use, inside an overall rezoning of 979.23 acres that also includes Tract B employment uses. Those figures are rezoning-tract area, not developed campus acreage, building count, floor area or IT load. The county status table does not specify a building count.",
      "sources": [
        {
          "title": "Chesterfield County Data Centers — Project Status as of July 2026",
          "url": "https://www.chesterfield.gov/datacenters",
          "type": "county project status page",
          "published": null,
          "retrieved": "2026-09-19",
          "locator": "Status table Upper Magnolia Green row; FAQ paragraphs on Google's Upper Magnolia Green rezoning and May 2025 rezoning",
          "supports": "Zoning-approved status at 4201 Moseley Road; Google as named agreement party; not construction, operator, title or IT load.",
          "source_type": "government"
        },
        {
          "title": "Chesterfield Case 25SN1038 — Upper Magnolia Green West Tract A and Tract B Rezoning",
          "url": "https://www.chesterfield.gov/DocumentCenter/View/48236/Upper-Magnolia-Data-Center-Zoning-PDF",
          "type": "county zoning case",
          "published": "2025-05-28",
          "retrieved": "2026-09-19",
          "locator": "Page 1 summary; Tract A proffer definition of approximately 880.23 acres; parcel list",
          "supports": "Multi-parcel data-center rezoning Case 25SN1038; Tract A acreage; not Google as applicant name in the staff report caption.",
          "source_type": "government"
        }
      ],
      "confidence": "medium",
      "missing_evidence": [
        "current fee-simple owner",
        "operator and tenant",
        "building count and construction evidence",
        "city or place name",
        "coordinates and a single reconciled street number",
        "critical-IT and other MW capacity"
      ],
      "history": [
        {
          "date": "2025-05-28",
          "summary": "Chesterfield Board of Supervisors public hearing date on Case 25SN1038; the county later describes the Upper Magnolia Green site as rezoned for data-center use in May 2025."
        },
        {
          "date": "2026-07",
          "summary": "County status table listed Upper Magnolia Green as zoning approved with the number of buildings not specified."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "google-watkins-centre-south-site-va",
      "parent_id": null,
      "record_unit": "project",
      "current_name": "Google Watkins Centre Data Center Project",
      "state": "VA",
      "city": null,
      "county": "Chesterfield County",
      "developer": null,
      "operator": null,
      "owner": null,
      "tenant": null,
      "lifecycle_status": "approved",
      "status_attribution": "Chesterfield County data-center project status table as of July 2026, Watkins Centre row",
      "status_basis": "Chesterfield County's Data Center Project Status table as of July 2026 lists Watkins Centre at 750 Watkins Centre Parkway as zoning approved, with the number of buildings not specified. The county page states Upper Magnolia Green and Watkins Centre were rezoned for data-center use in May 2025. Opened Case 25SN1040 is a multi-parcel rezoning limited to data-center uses on about 349.97 acres. These records support an approved project. They do not establish a campus building count, construction, operation, current land title, an operator legal role, or any IT-load figure.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "site",
        "aggregation_allowed": false,
        "note": "No selected county record states critical-IT or other MW. The 349.97-acre figure is rezoning site area, not capacity. The county's 0.850 MGD maximum public water use is water, not IT load."
      },
      "location": {
        "address": "750 Watkins Centre Parkway",
        "city": null,
        "county": "Chesterfield County",
        "precision": "approximate",
        "note": "July 2026 county status-table locator. Case 25SN1040 lists multiple parcels under that parkway address."
      },
      "physical_scale": "Case 25SN1040 states a site size of 349.97 acres with uses limited to data centers. That is rezoning site area, not developed campus acreage, building count, floor area or IT load. The county status table does not specify a building count.",
      "sources": [
        {
          "title": "Chesterfield County Data Centers — Project Status as of July 2026",
          "url": "https://www.chesterfield.gov/datacenters",
          "type": "county project status page",
          "published": null,
          "retrieved": "2026-09-19",
          "locator": "Status table Watkins Centre row; FAQ paragraphs on the three planned Google sites and May 2025 rezoning",
          "supports": "Zoning-approved status at 750 Watkins Centre Parkway; Google as named agreement party; not construction, campus building count, operator, title or IT load.",
          "source_type": "government"
        },
        {
          "title": "Chesterfield Case 25SN1040 — Watkins Centre South rezoning",
          "url": "https://www.chesterfield.gov/DocumentCenter/View/48244/Watkins-Data-Center-Zoning-PDF",
          "type": "county zoning case",
          "published": "2025-05-28",
          "retrieved": "2026-09-19",
          "locator": "Page 1 site size 349.97 acres; summary limiting uses to data centers; 750 Watkins Centre Parkway parcel list",
          "supports": "Multi-parcel data-center rezoning Case 25SN1040.",
          "source_type": "government"
        }
      ],
      "confidence": "medium",
      "missing_evidence": [
        "current fee-simple owner",
        "operator and tenant",
        "building count and construction evidence",
        "city or place name",
        "coordinates",
        "critical-IT and other MW capacity"
      ],
      "history": [
        {
          "date": "2025-05-28",
          "summary": "Chesterfield Board of Supervisors public hearing date on Case 25SN1040; the county later describes Watkins Centre as rezoned for data-center use in May 2025."
        },
        {
          "date": "2026-07",
          "summary": "County status table listed Watkins Centre as zoning approved with the number of buildings not specified."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "technology-park-data-center-project-bossier-la",
      "parent_id": null,
      "record_unit": "project",
      "current_name": "Technology Park Data Center Project",
      "state": "LA",
      "city": null,
      "county": "Bossier Parish",
      "developer": "STACK Infrastructure",
      "operator": null,
      "owner": null,
      "tenant": null,
      "lifecycle_status": "approved",
      "status_attribution": "Bossier Parish Police Jury news release posted 20 March 2026 describing the 18 March 2026 final-plat vote",
      "status_basis": "On March 18, 2026, the Bossier Parish Police Jury unanimously approved the Benton MPC final plat for the Technology Park supporting a new Amazon data center, according to the parish news release posted March 20, 2026. The same release says the development includes a proposal by Stack Infrastructure/AWS to rezone and subdivide more than 1,000 acres. These records support an approved land-development project. They do not establish construction, operation, current land title, an operator legal role, a street address, a building count, or any IT-load figure. An earlier conceptual rezoning without a named tenant is not treated as the current status.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "site",
        "aggregation_allowed": false,
        "note": "No selected parish or LED record states critical-IT or other MW. More than 1,000 acres is proposed rezoning/subdivision area, not capacity. Announced investment dollars are not published as capacity."
      },
      "location": {
        "address": null,
        "city": null,
        "county": "Bossier Parish",
        "precision": "county",
        "note": "Parish release locates the Technology Park as the Amazon data-center plat approved after Benton MPC recommendation. No street address is stated."
      },
      "physical_scale": "The parish release describes a proposal to rezone and subdivide more than 1,000 acres. That is proposed subdivision area, not a surveyed campus, building count, floor area or IT load.",
      "sources": [
        {
          "title": "Police Jury Awards Major Infrastructure Contracts, Approves Final Plat for Amazon Data Center Technology Park",
          "url": "https://www.bossierparishla.gov/news/2026/03/20/police-jury-awards-major-infrastructure-contracts--approves-final-plat-for-amazon-data-center-technology-park",
          "type": "parish news release",
          "published": "2026-03-20",
          "retrieved": "2026-09-19",
          "locator": "Headline; section Final Plat Approved for Amazon Data Center Technology Park; paragraph naming Stack Infrastructure/AWS and more than 1,000 acres",
          "supports": "Final-plat approval on 18 March 2026; STACK Infrastructure as named rezoning/subdivision proponent; acreage floor; not owner, operator, construction or IT load.",
          "source_type": "government"
        },
        {
          "title": "Amazon Selects Louisiana for $12 Billion Data Center Campuses in Major U.S. Expansion",
          "url": "https://www.opportunitylouisiana.gov/news/amazon-selects-louisiana-for-12-billion-data-center-campuses-in-major-u-s-expansion",
          "type": "state economic-development release",
          "published": "2026-02-23",
          "retrieved": "2026-09-19",
          "locator": "Paragraphs on the multi-parish announcement and the STACK partnership sentence",
          "supports": "Context that the state announced Amazon data-center campuses in Caddo and Bossier and named STACK as developer and owner. Owner and operator are not taken from this announcement.",
          "source_type": "government"
        }
      ],
      "confidence": "medium",
      "missing_evidence": [
        "street address, city and coordinates",
        "current fee-simple owner",
        "operator and tenant legal roles",
        "building count and construction start",
        "exact surveyed acreage",
        "critical-IT and other MW capacity"
      ],
      "history": [
        {
          "date": "2026-02-23",
          "summary": "Louisiana Economic Development announced Amazon data-center campuses in Caddo and Bossier parishes and named STACK Infrastructure as developer and owner; that announcement is not used as title or operator evidence."
        },
        {
          "date": "2026-03-18",
          "summary": "Bossier Parish Police Jury approved the Benton MPC final plat for the Technology Park supporting the Amazon data center."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    },
    {
      "stable_id": "microsoft-corporation-sat-89-90-tx",
      "parent_id": null,
      "record_unit": "project",
      "current_name": "Microsoft Corporation (SAT 89-90)",
      "state": "TX",
      "city": "Castroville",
      "county": "Medina County",
      "developer": null,
      "operator": "Microsoft Corporation",
      "owner": "Microsoft Corporation",
      "tenant": null,
      "lifecycle_status": "unknown",
      "status_attribution": "Texas Comptroller qualifying large-project list retrieved 19 September 2026; TDLR TABS project TABS2025012765 retrieved the same day",
      "status_basis": "The Texas Comptroller's registered qualifying large data-center projects list includes Microsoft Corporation (SAT 89-90) with effective date 04/04/2024 and names Microsoft Corporation as owner, occupant and operator under registration LD772702. TDLR TABS project TABS2025012765 registers SAT89/90 Data Center at 2995 US HWY 90 W, Castroville, Medina County, as new construction of two single-story data-center buildings plus associated campus site construction. TABS Current Status is Review Complete, which is accessibility plan review, not a finding that construction has started or finished. These records support a named project identity, address and tax-program owner/operator labels. They do not establish a current lifecycle stage, a campus as a separate counted unit, or any IT-load figure.",
      "capacity": {
        "value": null,
        "unit": "MW",
        "kind": "unknown",
        "scope": "site",
        "aggregation_allowed": false,
        "note": "No selected Comptroller or TDLR record states critical-IT or other MW. TDLR estimated cost and 489,400 square feet gross building area are not IT load and are not published as capacity."
      },
      "location": {
        "address": "2995 US HWY 90 W",
        "city": "Castroville",
        "county": "Medina County",
        "precision": "exact",
        "note": "TDLR TABS location. The Comptroller list row does not publish an address."
      },
      "physical_scale": "TDLR TABS scope describes construction of two single-story data-center buildings, each containing five colos, plus associated campus site construction, and approximately 489,400 square feet gross building area. That is registered design scope, not occupied white space, a counted campus identity, or IT load.",
      "sources": [
        {
          "title": "Registered Qualifying Large Data Center Projects — Microsoft Corporation (SAT 89-90)",
          "url": "https://comptroller.texas.gov/taxes/data-centers/data-center-lists.php",
          "type": "state comptroller list",
          "published": null,
          "retrieved": "2026-09-19",
          "locator": "Registered Qualifying Large Data Center Projects table, Microsoft Corporation (SAT 89-90) row: effective date 04/04/2024; owner LD772702-OW1; occupant LD772702-OC1; operator LD772702-OP1",
          "supports": "Project name, tax-program owner and operator labels; not address, construction status or IT load.",
          "source_type": "government"
        },
        {
          "title": "TDLR TABS Project TABS2025012765 — SAT89/90 Data Center",
          "url": "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2025012765",
          "type": "state accessibility project registration",
          "published": "2025-02-25",
          "retrieved": "2026-09-19",
          "locator": "Project Details: location address and county; Type of Work New Construction; Scope of Work two buildings plus associated campus site construction; Current Status Review Complete; Owner Name Microsoft Corporation",
          "supports": "Street address, city, county, two-building physical scope, owner name on the accessibility registration; not construction progress or IT load.",
          "source_type": "government"
        }
      ],
      "confidence": "medium",
      "missing_evidence": [
        "construction or operating evidence independent of TABS plan-review status",
        "developer if distinct from Microsoft",
        "tenant",
        "parcel identifiers",
        "site acres",
        "critical-IT and other MW capacity"
      ],
      "history": [
        {
          "date": "2024-04-04",
          "summary": "Comptroller list effective date for Microsoft Corporation (SAT 89-90) as a qualifying large data-center project."
        },
        {
          "date": "2025-02-25",
          "summary": "TDLR TABS registration date for SAT89/90 Data Center."
        }
      ],
      "inventory_layer": "verified",
      "rights_class": "reference_only",
      "generate_page": true
    }
  ]
}