Licensed lead · not independently verified · dcd-dir-000135

AWS Costas Property Campus (Ridgeland)

source-reported under construction

Amazon Web Services

Ridgeland · Madison County · Mississippi

Capacity not statedSource updated 10 September 2026approximate location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for AWS Costas Property Campus (Ridgeland).

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Facility snapshot

Operator as published
Amazon Web Services
Address and locality
Ridgeland · Madison County · Mississippi
Source-reported status
under construction
Facility type
data center
Reported capacity
Not stated
Source freshness
10 September 2026
Location precision
approximate
Source confidence
reported
Stable directory ID
dcd-dir-000135

What the source record says

RESOLVES last wave's hold with independent primary-tier evidence that Canton and Ridgeland are genuinely two distinct AWS campuses, not a single project under two names. Mississippi Free Press (2026-08-19), reporting Madison County's denial of AWS's tax-valuation appeal, states directly: 'The county has entered into two fee-in-lieu-of-taxes agreements with the tech giant for its data center campuses in Canton and Ridgeland' -- i.e., Madison County's own tax/incentive administration treats these as two separate FILOT agreements, not one. Magnolia Tribune (2024-07-24, accessed again this run) gives the physical distinction: the Madison County Mega Site is '927 acres ... located off Highway 22 and Nissan Parkway in Canton,' while the Costas Property is 'an additional 786 acres in Ridgeland ... located along the southern tip of Madison County near Tougaloo College, on the corner of Highland Colony Parkway and West County Line Road' -- roughly 20 miles apart. Both sites are within Madison County (Ridgeland is not a separate county), so the live aggregate record's id/framing as 'Madison County' is not wrong on that count, but it does combine two separately-incentivized campuses. Coordinates are the OSM-tagged traffic-signal node at the actual Highland Colony Parkway / West County Line Road intersection (confirmed via Overpass API query against current OpenStreetMap way data, not an estimate), not a confirmed parcel boundary -- precision 'approximate'. Deliberately omitted: capacityMw, investmentUsd, and jobs, because every figure found for this project (the $10B investment, the combined MW target, job counts) is stated for the two-site project as a whole; no source fetched this run apportions any of these by site, and apportioning by acreage share would be a fabricated estimate, not a sourced fact. See the companion refresh finding on aws-project-atlas-madison-county-ms recommending it be re-scoped to the Canton site alone.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026 · source-reported under construction

    Reported as 'in the early stages of construction'; both Madison County sites estimated for completion by 2027.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID aws-costas-ridgeland-ms. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →