Licensed lead · not independently verified · dcd-dir-000175

Beale Infrastructure Gardner Campus

source-reported proposed

Beale Infrastructure

Gardner · Johnson County · Kansas

Capacity not statedSource updated 26 July 2026exact location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Beale Infrastructure Gardner Campus.

Exact source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Facility snapshot

Operator as published
Beale Infrastructure
Address and locality
Gardner · Johnson County · Kansas
Source-reported status
proposed
Facility type
data center
Reported capacity
Not stated
Source freshness
26 July 2026
Location precision
exact
Source confidence
reported
Stable directory ID
dcd-dir-000175

What the source record says

Near 191st St & S Clare Rd. Up to 16 data halls. Distinct from Beale's existing tracked Project Pilot in De Soto, KS. Coordinates are approximate.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

No status history was supplied in this edition.

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID beale-gardner-johnson-county-ks. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →