Licensed lead · not independently verified · dcd-dir-000292

Cologix Johnstown AI-Ready Campus

source-reported under construction

Cologix

Johnstown · Licking County · Ohio

Planned 800 MWSource updated 26 July 2026exact location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Cologix Johnstown AI-Ready Campus.

Exact source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Facility snapshot

Operator as published
Cologix
Address and locality
Johnstown · Licking County · Ohio
Source-reported status
under construction
Facility type
data center
Reported capacity
Planned: 800 MW (source-reported; boundary not independently verified)
Source freshness
26 July 2026
Location precision
exact
Source confidence
confirmed
Stable directory ID
dcd-dir-000292

What the source record says

154 acres; up to 800 MW scalable across eight data centers / 2.0M sq ft (800 MW is a full-buildout potential — in notes). The '>$7 billion' figure is a company-wide expansion plan, not a Johnstown-specific committed amount (in notes). Coordinates are the Johnstown, Licking County area centroid. The '>$7B' figure is Cologix's company-wide expansion plan; the $1.17B commitment is combined across Johnstown + Orange Township (not split) -> investmentUsd omitted. Land: ~$45M for 154 acres (Sept 2024).

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025 · source-reported under construction

    Cologix acquired 154 acres in Johnstown for an 8-building AI-ready campus; first-phase development anticipated to begin 2025

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID cologix-johnstown-oh. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →