  <title>DataCenterData: evidence updates</title>
  <subtitle>DataCenterData publishing activity: newly published evidence records. An evidence update is not an event at a facility. Corrections are listed in the corrections history.</subtitle>
  <id>tag:datacenterdata.com,2026:insights/updates/evidence</id>
  <link rel="self" href="https://datacenterdata.com/insights/updates/evidence/feed.xml"/>
  <link rel="alternate" type="text/html" href="https://datacenterdata.com/insights/updates/evidence/"/>
  <updated>2026-09-21T20:28:48Z</updated>
  <author><name>DataCenterData</name><uri>https://datacenterdata.com/about/</uri></author>
  <rights>Entry text © DataCenterData. Linked source documents keep their own rights and are not republished.</rights>
  <generator uri="https://datacenterdata.com/methodology/">DataCenterData build</generator>
  <entry>
    <id>tag:datacenterdata.com,2026:update:021de0a8f5c4ea54030665afaffd37bbc1fcf62c70786056453e7003606f541c</id>
    <title>Evidence record published: CyrusOne — Quincy Data Center (Quincy, WA)</title>
    <link rel="alternate" type="text/html" href="https://datacenterdata.com/facilities/cyrusone-quincy-data-center-wa/"/>
    <published>2026-09-21T20:28:48Z</published>
    <updated>2026-09-21T20:28:48Z</updated>
    <category term="evidence_update" label="Evidence update"/><category term="record_published" label="Evidence record published"/><category term="state:WA" label="Washington"/>
    <summary>This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown. Added after independent re-reading of the state index and site-specific order.</summary>
    <content type="html">&lt;p&gt;This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown.&lt;/p&gt;&lt;p&gt;Added after independent re-reading of the state index and site-specific order.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Published on DataCenterData: 2026-09-18&lt;/li&gt;&lt;li&gt;Record: cyrusone-quincy-data-center-wa&lt;/li&gt;&lt;li&gt;Entry ID: 021de0a8f5c4ea54030665afaffd37bbc1fcf62c70786056453e7003606f541c&lt;/li&gt;&lt;/ul&gt;</content>
  </entry>
  <entry>
    <id>tag:datacenterdata.com,2026:update:04563d9980ceac35b35f8d57dbe10401775a8b6e92c10dca51d39c9c19098c68</id>
    <title>Evidence record published: Vantage Data Centers — Quincy Campus (Quincy, WA)</title>
    <link rel="alternate" type="text/html" href="https://datacenterdata.com/projects/vantage-quincy-campus-wa/"/>
    <published>2026-09-21T20:28:48Z</published>
    <updated>2026-09-21T20:28:48Z</updated>
    <category term="evidence_update" label="Evidence update"/><category term="record_published" label="Evidence record published"/><category term="state:WA" label="Washington"/>
    <summary>This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown. Added after independent re-reading of the state index and site-specific order, with backup generation kept separate from IT capacity.</summary>
    <content type="html">&lt;p&gt;This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown.&lt;/p&gt;&lt;p&gt;Added after independent re-reading of the state index and site-specific order, with backup generation kept separate from IT capacity.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Published on DataCenterData: 2026-09-18&lt;/li&gt;&lt;li&gt;Record: vantage-quincy-campus-wa&lt;/li&gt;&lt;li&gt;Entry ID: 04563d9980ceac35b35f8d57dbe10401775a8b6e92c10dca51d39c9c19098c68&lt;/li&gt;&lt;/ul&gt;</content>
  </entry>
  <entry>
    <id>tag:datacenterdata.com,2026:update:24bfcad053bdb4bdf997cad8c862e398f6967e3e0541fc4c95a2b6fc08fd454e</id>
    <title>Evidence record published: McLaren Data Center (Santa Clara, CA)</title>
    <link rel="alternate" type="text/html" href="https://datacenterdata.com/projects/mclaren-data-center-santa-clara-ca/"/>
    <published>2026-09-21T20:28:48Z</published>
    <updated>2026-09-21T20:28:48Z</updated>
    <category term="evidence_update" label="Evidence update"/><category term="record_published" label="Evidence record published"/><category term="state:CA" label="California"/>
    <summary>This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown. Added from the retrieved CEQAnet notice after operator-null review; generator authority is not converted to IT capacity or current operation.</summary>
    <content type="html">&lt;p&gt;This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown.&lt;/p&gt;&lt;p&gt;Added from the retrieved CEQAnet notice after operator-null review; generator authority is not converted to IT capacity or current operation.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Published on DataCenterData: 2026-09-18&lt;/li&gt;&lt;li&gt;Record: mclaren-data-center-santa-clara-ca&lt;/li&gt;&lt;li&gt;Entry ID: 24bfcad053bdb4bdf997cad8c862e398f6967e3e0541fc4c95a2b6fc08fd454e&lt;/li&gt;&lt;/ul&gt;</content>
  </entry>
  <entry>
    <id>tag:datacenterdata.com,2026:update:2e1af5386101bb9360847151e984545ab390998bf49ae26d98eddaafc485ee0f</id>
    <title>Evidence record published: Goodman Energy Park (GEP) data center (Vernon, CA)</title>
    <link rel="alternate" type="text/html" href="https://datacenterdata.com/projects/goodman-energy-park-data-center-vernon-ca/"/>
    <published>2026-09-21T20:28:48Z</published>
    <updated>2026-09-21T20:28:48Z</updated>
    <category term="evidence_update" label="Evidence update"/><category term="record_published" label="Evidence record published"/><category term="state:CA" label="California"/>
    <summary>This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown. Added from the retrieved CEQAnet and CEC records. Backup-generation capacity is recorded as proposed onsite generation, not IT load.</summary>
    <content type="html">&lt;p&gt;This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown.&lt;/p&gt;&lt;p&gt;Added from the retrieved CEQAnet and CEC records. Backup-generation capacity is recorded as proposed onsite generation, not IT load.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Published on DataCenterData: 2026-09-18&lt;/li&gt;&lt;li&gt;Record: goodman-energy-park-data-center-vernon-ca&lt;/li&gt;&lt;li&gt;Entry ID: 2e1af5386101bb9360847151e984545ab390998bf49ae26d98eddaafc485ee0f&lt;/li&gt;&lt;/ul&gt;</content>
  </entry>
  <entry>
    <id>tag:datacenterdata.com,2026:update:74d72b8dcd70daacf55ec86b4aec66870d729b068f4221021b606c504de55cf5</id>
    <title>Evidence record published: Project Sail (GA)</title>
    <link rel="alternate" type="text/html" href="https://datacenterdata.com/projects/project-sail-coweta-county-ga/"/>
    <published>2026-09-21T20:28:48Z</published>
    <updated>2026-09-21T20:28:48Z</updated>
    <category term="evidence_update" label="Evidence update"/><category term="record_published" label="Evidence record published"/><category term="state:GA" label="Georgia"/>
    <summary>This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown. Added from the retrieved Georgia DRI filing after operator-null review; Prologis is not named in the cited records.</summary>
    <content type="html">&lt;p&gt;This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown.&lt;/p&gt;&lt;p&gt;Added from the retrieved Georgia DRI filing after operator-null review; Prologis is not named in the cited records.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Published on DataCenterData: 2026-09-18&lt;/li&gt;&lt;li&gt;Record: project-sail-coweta-county-ga&lt;/li&gt;&lt;li&gt;Entry ID: 74d72b8dcd70daacf55ec86b4aec66870d729b068f4221021b606c504de55cf5&lt;/li&gt;&lt;/ul&gt;</content>
  </entry>
  <entry>
    <id>tag:datacenterdata.com,2026:update:74e43d8772f1aef0a9299fd64d00feeeaa9c8de039b041b508b01f8bbaed2d09</id>
    <title>Evidence record published: Northtown Data Center (NTDC) (San Jose, CA)</title>
    <link rel="alternate" type="text/html" href="https://datacenterdata.com/projects/northtown-data-center-san-jose-ca/"/>
    <published>2026-09-21T20:28:48Z</published>
    <updated>2026-09-21T20:28:48Z</updated>
    <category term="evidence_update" label="Evidence update"/><category term="record_published" label="Evidence record published"/><category term="state:CA" label="California"/>
    <summary>This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown. Added from the retrieved CEQAnet and CEC records. Backup-generation capacity is recorded as proposed onsite generation, not IT load.</summary>
    <content type="html">&lt;p&gt;This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown.&lt;/p&gt;&lt;p&gt;Added from the retrieved CEQAnet and CEC records. Backup-generation capacity is recorded as proposed onsite generation, not IT load.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Published on DataCenterData: 2026-09-18&lt;/li&gt;&lt;li&gt;Record: northtown-data-center-san-jose-ca&lt;/li&gt;&lt;li&gt;Entry ID: 74e43d8772f1aef0a9299fd64d00feeeaa9c8de039b041b508b01f8bbaed2d09&lt;/li&gt;&lt;/ul&gt;</content>
  </entry>
  <entry>
    <id>tag:datacenterdata.com,2026:update:7529073d815e75f7b19ff59ce397e2412189fce59f094fd0a61466716e9abfb5</id>
    <title>Evidence record published: Gregory Road Data Center (GA)</title>
    <link rel="alternate" type="text/html" href="https://datacenterdata.com/projects/gregory-road-data-center-newton-county-ga/"/>
    <published>2026-09-21T20:28:48Z</published>
    <updated>2026-09-21T20:28:48Z</updated>
    <category term="evidence_update" label="Evidence update"/><category term="record_published" label="Evidence record published"/><category term="state:GA" label="Georgia"/>
    <summary>This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown. Added from the retrieved Georgia DRI filing and Newton County objection. Covington is not assigned as the host city.</summary>
    <content type="html">&lt;p&gt;This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown.&lt;/p&gt;&lt;p&gt;Added from the retrieved Georgia DRI filing and Newton County objection. Covington is not assigned as the host city.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Published on DataCenterData: 2026-09-18&lt;/li&gt;&lt;li&gt;Record: gregory-road-data-center-newton-county-ga&lt;/li&gt;&lt;li&gt;Entry ID: 7529073d815e75f7b19ff59ce397e2412189fce59f094fd0a61466716e9abfb5&lt;/li&gt;&lt;/ul&gt;</content>
  </entry>
  <entry>
    <id>tag:datacenterdata.com,2026:update:88bc1cedbb1f0bbc8de39962ca010f84ede68be59bc0a51de1f911d2efe76de2</id>
    <title>Evidence record published: Colovore LLC Aurora data center (Aurora, IL)</title>
    <link rel="alternate" type="text/html" href="https://datacenterdata.com/projects/colovore-meridian-parkway-aurora-il/"/>
    <published>2026-09-21T20:28:48Z</published>
    <updated>2026-09-21T20:28:48Z</updated>
    <category term="evidence_update" label="Evidence update"/><category term="record_published" label="Evidence record published"/><category term="state:IL" label="Illinois"/>
    <summary>This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown. Added from the retrieved Illinois EPA notice after operator-null review; the applicant is not treated as a verified operator and the West Chicago address is not merged.</summary>
    <content type="html">&lt;p&gt;This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown.&lt;/p&gt;&lt;p&gt;Added from the retrieved Illinois EPA notice after operator-null review; the applicant is not treated as a verified operator and the West Chicago address is not merged.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Published on DataCenterData: 2026-09-18&lt;/li&gt;&lt;li&gt;Record: colovore-meridian-parkway-aurora-il&lt;/li&gt;&lt;li&gt;Entry ID: 88bc1cedbb1f0bbc8de39962ca010f84ede68be59bc0a51de1f911d2efe76de2&lt;/li&gt;&lt;/ul&gt;</content>
  </entry>
  <entry>
    <id>tag:datacenterdata.com,2026:update:8f028e477f7686485f1d55b2d74b01b2d130ddb475facd4e4366d9c3b9464eab</id>
    <title>Evidence record published: Kingston Technology Hub (Kingston, GA)</title>
    <link rel="alternate" type="text/html" href="https://datacenterdata.com/projects/kingston-technology-hub-bartow-ga/"/>
    <published>2026-09-21T20:28:48Z</published>
    <updated>2026-09-21T20:28:48Z</updated>
    <category term="evidence_update" label="Evidence update"/><category term="record_published" label="Evidence record published"/><category term="state:GA" label="Georgia"/>
    <summary>This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown. Added from the retrieved Georgia DRI filing after operator-null review; Thor Equities is not stated as a parent in the cited records.</summary>
    <content type="html">&lt;p&gt;This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown.&lt;/p&gt;&lt;p&gt;Added from the retrieved Georgia DRI filing after operator-null review; Thor Equities is not stated as a parent in the cited records.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Published on DataCenterData: 2026-09-18&lt;/li&gt;&lt;li&gt;Record: kingston-technology-hub-bartow-ga&lt;/li&gt;&lt;li&gt;Entry ID: 8f028e477f7686485f1d55b2d74b01b2d130ddb475facd4e4366d9c3b9464eab&lt;/li&gt;&lt;/ul&gt;</content>
  </entry>
  <entry>
    <id>tag:datacenterdata.com,2026:update:991b0aa75cf1d94c247a114211b9be881b43386bb1ba0039ca098238c740a817</id>
    <title>Evidence record published: QTS - Blakely (Blakely, GA)</title>
    <link rel="alternate" type="text/html" href="https://datacenterdata.com/projects/qts-blakely-early-county-ga/"/>
    <published>2026-09-21T20:28:48Z</published>
    <updated>2026-09-21T20:28:48Z</updated>
    <category term="evidence_update" label="Evidence update"/><category term="record_published" label="Evidence record published"/><category term="state:GA" label="Georgia"/>
    <summary>This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown. Added from the retrieved Georgia DRI filing after operator-null review; QTS branding is not treated as a verified operator role.</summary>
    <content type="html">&lt;p&gt;This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown.&lt;/p&gt;&lt;p&gt;Added from the retrieved Georgia DRI filing after operator-null review; QTS branding is not treated as a verified operator role.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Published on DataCenterData: 2026-09-18&lt;/li&gt;&lt;li&gt;Record: qts-blakely-early-county-ga&lt;/li&gt;&lt;li&gt;Entry ID: 991b0aa75cf1d94c247a114211b9be881b43386bb1ba0039ca098238c740a817&lt;/li&gt;&lt;/ul&gt;</content>
  </entry>
  <entry>
    <id>tag:datacenterdata.com,2026:update:b82c00bb6c1d9f8d6c0b36060a139c98279277db5fcb76b423343fa1e323f97d</id>
    <title>Evidence record published: ATL50 (Union City, GA)</title>
    <link rel="alternate" type="text/html" href="https://datacenterdata.com/projects/atl50-union-city-fulton-ga/"/>
    <published>2026-09-21T20:28:48Z</published>
    <updated>2026-09-21T20:28:48Z</updated>
    <category term="evidence_update" label="Evidence update"/><category term="record_published" label="Evidence record published"/><category term="state:GA" label="Georgia"/>
    <summary>This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown. Added from the retrieved Georgia DRI filing. A neighbouring Stonewall Tell filing sits on the opposite side of the road and is not merged.</summary>
    <content type="html">&lt;p&gt;This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown.&lt;/p&gt;&lt;p&gt;Added from the retrieved Georgia DRI filing. A neighbouring Stonewall Tell filing sits on the opposite side of the road and is not merged.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Published on DataCenterData: 2026-09-18&lt;/li&gt;&lt;li&gt;Record: atl50-union-city-fulton-ga&lt;/li&gt;&lt;li&gt;Entry ID: b82c00bb6c1d9f8d6c0b36060a139c98279277db5fcb76b423343fa1e323f97d&lt;/li&gt;&lt;/ul&gt;</content>
  </entry>
  <entry>
    <id>tag:datacenterdata.com,2026:update:cd275090a0c6de6bed4be51fbb976a17c701cc34ce3cb75353d79707cbbc5bc1</id>
    <title>Evidence record published: H5 Data Centers — Quincy (Quincy, WA)</title>
    <link rel="alternate" type="text/html" href="https://datacenterdata.com/facilities/h5-quincy-data-center-wa/"/>
    <published>2026-09-21T20:28:48Z</published>
    <updated>2026-09-21T20:28:48Z</updated>
    <category term="evidence_update" label="Evidence update"/><category term="record_published" label="Evidence record published"/><category term="state:WA" label="Washington"/>
    <summary>This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown. Added after independent re-reading of the state index and site-specific order, with equipment ratings excluded from IT-capacity fields.</summary>
    <content type="html">&lt;p&gt;This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown.&lt;/p&gt;&lt;p&gt;Added after independent re-reading of the state index and site-specific order, with equipment ratings excluded from IT-capacity fields.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Published on DataCenterData: 2026-09-18&lt;/li&gt;&lt;li&gt;Record: h5-quincy-data-center-wa&lt;/li&gt;&lt;li&gt;Entry ID: cd275090a0c6de6bed4be51fbb976a17c701cc34ce3cb75353d79707cbbc5bc1&lt;/li&gt;&lt;/ul&gt;</content>
  </entry>
  <entry>
    <id>tag:datacenterdata.com,2026:update:eae2358b9151b8eda074d736c90fb360aa7ca6591b749a316ad7cb5bbf54b90b</id>
    <title>Evidence record published: ATL2 East (Fayetteville, GA)</title>
    <link rel="alternate" type="text/html" href="https://datacenterdata.com/projects/atl2-east-fayetteville-fayette-ga/"/>
    <published>2026-09-21T20:28:48Z</published>
    <updated>2026-09-21T20:28:48Z</updated>
    <category term="evidence_update" label="Evidence update"/><category term="record_published" label="Evidence record published"/><category term="state:GA" label="Georgia"/>
    <summary>This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown. Added from the retrieved city ordinances and Georgia DRI filing. Adopted rezoning is recorded as zoning approval only.</summary>
    <content type="html">&lt;p&gt;This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown.&lt;/p&gt;&lt;p&gt;Added from the retrieved city ordinances and Georgia DRI filing. Adopted rezoning is recorded as zoning approval only.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Published on DataCenterData: 2026-09-18&lt;/li&gt;&lt;li&gt;Record: atl2-east-fayetteville-fayette-ga&lt;/li&gt;&lt;li&gt;Entry ID: eae2358b9151b8eda074d736c90fb360aa7ca6591b749a316ad7cb5bbf54b90b&lt;/li&gt;&lt;/ul&gt;</content>
  </entry>
  <entry>
    <id>tag:datacenterdata.com,2026:update:ec2b91caf8a5d1d2da949e66fcbc1dc26596c81e8de179939bef04920f2b1611</id>
    <title>Evidence record published: Microsoft Corp-Chicago Data Center (Northlake, IL)</title>
    <link rel="alternate" type="text/html" href="https://datacenterdata.com/facilities/microsoft-chicago-data-center-northlake-il/"/>
    <published>2026-09-21T20:28:48Z</published>
    <updated>2026-09-21T20:28:48Z</updated>
    <category term="evidence_update" label="Evidence update"/><category term="record_published" label="Evidence record published"/><category term="state:IL" label="Illinois"/>
    <summary>This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown. Added from the retrieved Illinois EPA notice. The DCEO Northlake Microsoft incentive award is not treated as the same facility.</summary>
    <content type="html">&lt;p&gt;This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown.&lt;/p&gt;&lt;p&gt;Added from the retrieved Illinois EPA notice. The DCEO Northlake Microsoft incentive award is not treated as the same facility.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Published on DataCenterData: 2026-09-18&lt;/li&gt;&lt;li&gt;Record: microsoft-chicago-data-center-northlake-il&lt;/li&gt;&lt;li&gt;Entry ID: ec2b91caf8a5d1d2da949e66fcbc1dc26596c81e8de179939bef04920f2b1611&lt;/li&gt;&lt;/ul&gt;</content>
  </entry>
  <entry>
    <id>tag:datacenterdata.com,2026:update:fcd46d42b481dbdf6dfb626f82d1f7b4d68c51c75b66dc930d2c7a63cdda2477</id>
    <title>Evidence record published: Project Camellia (GA)</title>
    <link rel="alternate" type="text/html" href="https://datacenterdata.com/projects/project-camellia-effingham-county-ga/"/>
    <published>2026-09-21T20:28:48Z</published>
    <updated>2026-09-21T20:28:48Z</updated>
    <category term="evidence_update" label="Evidence update"/><category term="record_published" label="Evidence record published"/><category term="state:GA" label="Georgia"/>
    <summary>This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown. Added from the retrieved Georgia DRI filing after operator-null review. The cited DRI does not name an end user or tenant and does not support the OpenAI attribution.</summary>
    <content type="html">&lt;p&gt;This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown.&lt;/p&gt;&lt;p&gt;Added from the retrieved Georgia DRI filing after operator-null review. The cited DRI does not name an end user or tenant and does not support the OpenAI attribution.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Published on DataCenterData: 2026-09-18&lt;/li&gt;&lt;li&gt;Record: project-camellia-effingham-county-ga&lt;/li&gt;&lt;li&gt;Entry ID: fcd46d42b481dbdf6dfb626f82d1f7b4d68c51c75b66dc930d2c7a63cdda2477&lt;/li&gt;&lt;/ul&gt;</content>
  </entry>
  <entry>
    <id>tag:datacenterdata.com,2026:update:0ec3cbf1ca632c531da04e165bc9a9ef2676954f29bbfe714f717143eda57951</id>
    <title>Evidence record published: Meta Rosemount Data Center (Rosemount, MN)</title>
    <link rel="alternate" type="text/html" href="https://datacenterdata.com/projects/meta-rosemount-data-center-mn/"/>
    <published>2026-09-21T20:28:48Z</published>
    <updated>2026-09-21T20:28:48Z</updated>
    <category term="evidence_update" label="Evidence update"/><category term="record_published" label="Evidence record published"/><category term="state:MN" label="Minnesota"/>
    <summary>This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown. Qualified as one construction-stage campus; roles, capacity, exact parcel, completion, and operation remain unknown.</summary>
    <content type="html">&lt;p&gt;This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown.&lt;/p&gt;&lt;p&gt;Qualified as one construction-stage campus; roles, capacity, exact parcel, completion, and operation remain unknown.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Published on DataCenterData: 2026-09-14&lt;/li&gt;&lt;li&gt;Record: meta-rosemount-data-center-mn&lt;/li&gt;&lt;li&gt;Entry ID: 0ec3cbf1ca632c531da04e165bc9a9ef2676954f29bbfe714f717143eda57951&lt;/li&gt;&lt;/ul&gt;</content>
  </entry>
  <entry>
    <id>tag:datacenterdata.com,2026:update:2690209d6d447cce3d86890089e673bfafa37c0112129edfe97c92e3888a8860</id>
    <title>Evidence record published: Gemini Addition (Sioux Falls, SD)</title>
    <link rel="alternate" type="text/html" href="https://datacenterdata.com/projects/gemini-addition-data-center-sioux-falls-sd/"/>
    <published>2026-09-21T20:28:48Z</published>
    <updated>2026-09-21T20:28:48Z</updated>
    <category term="evidence_update" label="Evidence update"/><category term="record_published" label="Evidence record published"/><category term="state:SD" label="South Dakota"/>
    <summary>This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown. Added as one rezoning and preliminary-plan-approved project; construction, end user, roles and capacity remain unknown.</summary>
    <content type="html">&lt;p&gt;This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown.&lt;/p&gt;&lt;p&gt;Added as one rezoning and preliminary-plan-approved project; construction, end user, roles and capacity remain unknown.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Published on DataCenterData: 2026-09-14&lt;/li&gt;&lt;li&gt;Record: gemini-addition-data-center-sioux-falls-sd&lt;/li&gt;&lt;li&gt;Entry ID: 2690209d6d447cce3d86890089e673bfafa37c0112129edfe97c92e3888a8860&lt;/li&gt;&lt;/ul&gt;</content>
  </entry>
  <entry>
    <id>tag:datacenterdata.com,2026:update:2b60e24edc6e0bb6f44c920e3c224a5401efdab6e1a70ef2684cc593d643f3a9</id>
    <title>Evidence record published: DRFortress (Honolulu, HI)</title>
    <link rel="alternate" type="text/html" href="https://datacenterdata.com/facilities/drfortress-honolulu-hi/"/>
    <published>2026-09-21T20:28:48Z</published>
    <updated>2026-09-21T20:28:48Z</updated>
    <category term="evidence_update" label="Evidence update"/><category term="record_published" label="Evidence record published"/><category term="state:HI" label="Hawaii"/>
    <summary>This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown. Qualified from current ETS use and procurement pages as one operating facility; roles, capacity, and scale remain unknown.</summary>
    <content type="html">&lt;p&gt;This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown.&lt;/p&gt;&lt;p&gt;Qualified from current ETS use and procurement pages as one operating facility; roles, capacity, and scale remain unknown.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Published on DataCenterData: 2026-09-14&lt;/li&gt;&lt;li&gt;Record: drfortress-honolulu-hi&lt;/li&gt;&lt;li&gt;Entry ID: 2b60e24edc6e0bb6f44c920e3c224a5401efdab6e1a70ef2684cc593d643f3a9&lt;/li&gt;&lt;/ul&gt;</content>
  </entry>
  <entry>
    <id>tag:datacenterdata.com,2026:update:432ddcc4f855a86c9d85fc4cf27e2dc0a7bad4717fae8fa446044ff404d853d5</id>
    <title>Evidence record published: Google Papillion Data Center (Papillion, NE)</title>
    <link rel="alternate" type="text/html" href="https://datacenterdata.com/projects/google-papillion-data-center-ne/"/>
    <published>2026-09-21T20:28:48Z</published>
    <updated>2026-09-21T20:28:48Z</updated>
    <category term="evidence_update" label="Evidence update"/><category term="record_published" label="Evidence record published"/><category term="state:NE" label="Nebraska"/>
    <summary>This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown. Qualified as one operating campus with at least one operating data-center building; complete campus scale, roles, and capacity remain unknown.</summary>
    <content type="html">&lt;p&gt;This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown.&lt;/p&gt;&lt;p&gt;Qualified as one operating campus with at least one operating data-center building; complete campus scale, roles, and capacity remain unknown.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Published on DataCenterData: 2026-09-14&lt;/li&gt;&lt;li&gt;Record: google-papillion-data-center-ne&lt;/li&gt;&lt;li&gt;Entry ID: 432ddcc4f855a86c9d85fc4cf27e2dc0a7bad4717fae8fa446044ff404d853d5&lt;/li&gt;&lt;/ul&gt;</content>
  </entry>
  <entry>
    <id>tag:datacenterdata.com,2026:update:43c7655dc532f6df3a8c9bc640135cecccff00547e3264bb81b6252e6b747b38</id>
    <title>Evidence record published: Sabey Montana Connections Data Center Project (MT)</title>
    <link rel="alternate" type="text/html" href="https://datacenterdata.com/projects/sabey-montana-connections-data-center-project-mt/"/>
    <published>2026-09-21T20:28:48Z</published>
    <updated>2026-09-21T20:28:48Z</updated>
    <category term="evidence_update" label="Evidence update"/><category term="record_published" label="Evidence record published"/><category term="state:MT" label="Montana"/>
    <summary>This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown. Qualified as one proposed land-sale and due-diligence project; no later lifecycle milestone is inferred.</summary>
    <content type="html">&lt;p&gt;This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown.&lt;/p&gt;&lt;p&gt;Qualified as one proposed land-sale and due-diligence project; no later lifecycle milestone is inferred.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Published on DataCenterData: 2026-09-14&lt;/li&gt;&lt;li&gt;Record: sabey-montana-connections-data-center-project-mt&lt;/li&gt;&lt;li&gt;Entry ID: 43c7655dc532f6df3a8c9bc640135cecccff00547e3264bb81b6252e6b747b38&lt;/li&gt;&lt;/ul&gt;</content>
  </entry>
  <entry>
    <id>tag:datacenterdata.com,2026:update:6b3d1fdddb5ead83efc47ea0cf4ebc885b6c3d89cb0bc2b869f75a4377a9465e</id>
    <title>Evidence record published: Massachusetts Green High Performance Computing Center (Holyoke, MA)</title>
    <link rel="alternate" type="text/html" href="https://datacenterdata.com/facilities/mghpcc-holyoke-ma/"/>
    <published>2026-09-21T20:28:48Z</published>
    <updated>2026-09-21T20:28:48Z</updated>
    <category term="evidence_update" label="Evidence update"/><category term="record_published" label="Evidence record published"/><category term="state:MA" label="Massachusetts"/>
    <summary>This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown. Added as one assessed building with dated operating evidence; current utilization and capacity remain unknown.</summary>
    <content type="html">&lt;p&gt;This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown.&lt;/p&gt;&lt;p&gt;Added as one assessed building with dated operating evidence; current utilization and capacity remain unknown.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Published on DataCenterData: 2026-09-14&lt;/li&gt;&lt;li&gt;Record: mghpcc-holyoke-ma&lt;/li&gt;&lt;li&gt;Entry ID: 6b3d1fdddb5ead83efc47ea0cf4ebc885b6c3d89cb0bc2b869f75a4377a9465e&lt;/li&gt;&lt;/ul&gt;</content>
  </entry>
  <entry>
    <id>tag:datacenterdata.com,2026:update:8844805feb32a6d995fef5640afbbccaf9172b428a44cb1af6c2a5be311beecb</id>
    <title>Evidence record published: Gotspace Groton Data Center Project (Groton, CT)</title>
    <link rel="alternate" type="text/html" href="https://datacenterdata.com/projects/gotspace-groton-data-center-project-ct/"/>
    <published>2026-09-21T20:28:48Z</published>
    <updated>2026-09-21T20:28:48Z</updated>
    <category term="evidence_update" label="Evidence update"/><category term="record_published" label="Evidence record published"/><category term="state:CT" label="Connecticut"/>
    <summary>This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown. Qualified as one agreement-backed project with current lifecycle unknown; all later milestones remain unverified.</summary>
    <content type="html">&lt;p&gt;This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown.&lt;/p&gt;&lt;p&gt;Qualified as one agreement-backed project with current lifecycle unknown; all later milestones remain unverified.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Published on DataCenterData: 2026-09-14&lt;/li&gt;&lt;li&gt;Record: gotspace-groton-data-center-project-ct&lt;/li&gt;&lt;li&gt;Entry ID: 8844805feb32a6d995fef5640afbbccaf9172b428a44cb1af6c2a5be311beecb&lt;/li&gt;&lt;/ul&gt;</content>
  </entry>
  <entry>
    <id>tag:datacenterdata.com,2026:update:8d283c0ce196a15acf3a914e2e8586efb461b3837533a274183f541122f023fc</id>
    <title>Evidence record published: STAK Energy Campus (AK)</title>
    <link rel="alternate" type="text/html" href="https://datacenterdata.com/projects/stak-energy-campus-north-slope-ak/"/>
    <published>2026-09-21T20:28:48Z</published>
    <updated>2026-09-21T20:28:48Z</updated>
    <category term="evidence_update" label="Evidence update"/><category term="record_published" label="Evidence record published"/><category term="state:AK" label="Alaska"/>
    <summary>This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown. Qualified as one proposed campus; final lease action, construction, operation, roles and IT capacity remain unknown.</summary>
    <content type="html">&lt;p&gt;This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown.&lt;/p&gt;&lt;p&gt;Qualified as one proposed campus; final lease action, construction, operation, roles and IT capacity remain unknown.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Published on DataCenterData: 2026-09-14&lt;/li&gt;&lt;li&gt;Record: stak-energy-campus-north-slope-ak&lt;/li&gt;&lt;li&gt;Entry ID: 8d283c0ce196a15acf3a914e2e8586efb461b3837533a274183f541122f023fc&lt;/li&gt;&lt;/ul&gt;</content>
  </entry>
  <entry>
    <id>tag:datacenterdata.com,2026:update:8e700e018468dcfb204c9da21d9c509b0ba30351c19bf307abccd9ae4c205017</id>
    <title>Evidence record published: Eternal Mind Loring Data Center Building (Limestone, ME)</title>
    <link rel="alternate" type="text/html" href="https://datacenterdata.com/facilities/eternal-mind-loring-data-center-me/"/>
    <published>2026-09-21T20:28:48Z</published>
    <updated>2026-09-21T20:28:48Z</updated>
    <category term="evidence_update" label="Evidence update"/><category term="record_published" label="Evidence record published"/><category term="state:ME" label="Maine"/>
    <summary>This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown. Qualified as one proposed building from dated lease and tenant records; current tenancy, occupancy and operation remain unknown.</summary>
    <content type="html">&lt;p&gt;This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown.&lt;/p&gt;&lt;p&gt;Qualified as one proposed building from dated lease and tenant records; current tenancy, occupancy and operation remain unknown.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Published on DataCenterData: 2026-09-14&lt;/li&gt;&lt;li&gt;Record: eternal-mind-loring-data-center-me&lt;/li&gt;&lt;li&gt;Entry ID: 8e700e018468dcfb204c9da21d9c509b0ba30351c19bf307abccd9ae4c205017&lt;/li&gt;&lt;/ul&gt;</content>
  </entry>
  <entry>
    <id>tag:datacenterdata.com,2026:update:bd4638f3de907b7ac85fedf50d7ca2910ec025215c981e271365c06d1255acc3</id>
    <title>Evidence record published: JP Morgan Chase CDC 1 (Bear, DE)</title>
    <link rel="alternate" type="text/html" href="https://datacenterdata.com/facilities/jp-morgan-chase-cdc-1-bear-de/"/>
    <published>2026-09-21T20:28:48Z</published>
    <updated>2026-09-21T20:28:48Z</updated>
    <category term="evidence_update" label="Evidence update"/><category term="record_published" label="Evidence record published"/><category term="state:DE" label="Delaware"/>
    <summary>This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown. Added as one permit-defined existing facility; current IT use, roles, scale and capacity remain unknown.</summary>
    <content type="html">&lt;p&gt;This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown.&lt;/p&gt;&lt;p&gt;Added as one permit-defined existing facility; current IT use, roles, scale and capacity remain unknown.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Published on DataCenterData: 2026-09-14&lt;/li&gt;&lt;li&gt;Record: jp-morgan-chase-cdc-1-bear-de&lt;/li&gt;&lt;li&gt;Entry ID: bd4638f3de907b7ac85fedf50d7ca2910ec025215c981e271365c06d1255acc3&lt;/li&gt;&lt;/ul&gt;</content>
  </entry>
  <entry>
    <id>tag:datacenterdata.com,2026:update:e2c36487c0d65a91fc7c71a5ff40da7e38b90a82a1b441f7f7292a4d67a66d37</id>
    <title>Evidence record published: DataOne Vineland AI Data Center (Vineland, NJ)</title>
    <link rel="alternate" type="text/html" href="https://datacenterdata.com/projects/dataone-vineland-ai-data-center-nj/"/>
    <published>2026-09-21T20:28:48Z</published>
    <updated>2026-09-21T20:28:48Z</updated>
    <category term="evidence_update" label="Evidence update"/><category term="record_published" label="Evidence record published"/><category term="state:NJ" label="New Jersey"/>
    <summary>This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown. Qualified at approval only; current construction and applicant corporate-role crosswalk remain unresolved.</summary>
    <content type="html">&lt;p&gt;This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown.&lt;/p&gt;&lt;p&gt;Qualified at approval only; current construction and applicant corporate-role crosswalk remain unresolved.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Published on DataCenterData: 2026-09-14&lt;/li&gt;&lt;li&gt;Record: dataone-vineland-ai-data-center-nj&lt;/li&gt;&lt;li&gt;Entry ID: e2c36487c0d65a91fc7c71a5ff40da7e38b90a82a1b441f7f7292a4d67a66d37&lt;/li&gt;&lt;/ul&gt;</content>
  </entry>
  <entry>
    <id>tag:datacenterdata.com,2026:update:21f1742642909ceb7b70f41c728dcc6ad8d8584a0bed6e153fd0a2e88844b6e0</id>
    <title>Evidence record published: Project Baccara (AZ)</title>
    <link rel="alternate" type="text/html" href="https://datacenterdata.com/projects/project-baccara/"/>
    <published>2026-09-21T20:28:48Z</published>
    <updated>2026-09-21T20:28:48Z</updated>
    <category term="evidence_update" label="Evidence update"/><category term="record_published" label="Evidence record published"/><category term="state:AZ" label="Arizona"/>
    <summary>This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown. Added as a proposed data-center project after a second review of the Commission source; the separate generation-certificate approval is preserved without promoting the project lifecycle.</summary>
    <content type="html">&lt;p&gt;This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown.&lt;/p&gt;&lt;p&gt;Added as a proposed data-center project after a second review of the Commission source; the separate generation-certificate approval is preserved without promoting the project lifecycle.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Published on DataCenterData: 2026-09-13&lt;/li&gt;&lt;li&gt;Record: project-baccara&lt;/li&gt;&lt;li&gt;Entry ID: 21f1742642909ceb7b70f41c728dcc6ad8d8584a0bed6e153fd0a2e88844b6e0&lt;/li&gt;&lt;/ul&gt;</content>
  </entry>
  <entry>
    <id>tag:datacenterdata.com,2026:update:3356fb9424ff3913a9c2add7e1316d311032e126597615e97c1fabed5a6d7e8f</id>
    <title>Evidence record published: Amazon Falls Township Data Center Project (Falls Township, PA)</title>
    <link rel="alternate" type="text/html" href="https://datacenterdata.com/projects/amazon-falls-township-data-center/"/>
    <published>2026-09-21T20:28:48Z</published>
    <updated>2026-09-21T20:28:48Z</updated>
    <category term="evidence_update" label="Evidence update"/><category term="record_published" label="Evidence record published"/><category term="state:PA" label="Pennsylvania"/>
    <summary>This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown. Added as one land-development-approved project; construction, operating roles and capacity remain unproven.</summary>
    <content type="html">&lt;p&gt;This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown.&lt;/p&gt;&lt;p&gt;Added as one land-development-approved project; construction, operating roles and capacity remain unproven.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Published on DataCenterData: 2026-09-13&lt;/li&gt;&lt;li&gt;Record: amazon-falls-township-data-center&lt;/li&gt;&lt;li&gt;Entry ID: 3356fb9424ff3913a9c2add7e1316d311032e126597615e97c1fabed5a6d7e8f&lt;/li&gt;&lt;/ul&gt;</content>
  </entry>
  <entry>
    <id>tag:datacenterdata.com,2026:update:35b37b34417aef57c718b2aa4263b591808cdf79048beee8c8f9a79828b68baa</id>
    <title>Evidence record published: Project Cardinal Data Center Campus (Yorkville, IL)</title>
    <link rel="alternate" type="text/html" href="https://datacenterdata.com/projects/project-cardinal-yorkville/"/>
    <published>2026-09-21T20:28:48Z</published>
    <updated>2026-09-21T20:28:48Z</updated>
    <category term="evidence_update" label="Evidence update"/><category term="record_published" label="Evidence record published"/><category term="state:IL" label="Illinois"/>
    <summary>This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown. Added with approved status bounded to the annexation agreement after independent review of Yorkville&apos;s project dockets.</summary>
    <content type="html">&lt;p&gt;This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown.&lt;/p&gt;&lt;p&gt;Added with approved status bounded to the annexation agreement after independent review of Yorkville&amp;#39;s project dockets.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Published on DataCenterData: 2026-09-13&lt;/li&gt;&lt;li&gt;Record: project-cardinal-yorkville&lt;/li&gt;&lt;li&gt;Entry ID: 35b37b34417aef57c718b2aa4263b591808cdf79048beee8c8f9a79828b68baa&lt;/li&gt;&lt;/ul&gt;</content>
  </entry>
  <entry>
    <id>tag:datacenterdata.com,2026:update:37981253be9b941baa1b1da7671df90e358daeb926e78a49bddfc28d2299127b</id>
    <title>Evidence record published: Microsoft Tyrone Data Center Project (Tyrone, GA)</title>
    <link rel="alternate" type="text/html" href="https://datacenterdata.com/projects/microsoft-tyrone-data-center/"/>
    <published>2026-09-21T20:28:48Z</published>
    <updated>2026-09-21T20:28:48Z</updated>
    <category term="evidence_update" label="Evidence update"/><category term="record_published" label="Evidence record published"/><category term="state:GA" label="Georgia"/>
    <summary>This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown. Added as a zoning-approved project after a fresh review of the Town of Tyrone source; unverified Project Rita, building and capacity details were excluded.</summary>
    <content type="html">&lt;p&gt;This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown.&lt;/p&gt;&lt;p&gt;Added as a zoning-approved project after a fresh review of the Town of Tyrone source; unverified Project Rita, building and capacity details were excluded.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Published on DataCenterData: 2026-09-13&lt;/li&gt;&lt;li&gt;Record: microsoft-tyrone-data-center&lt;/li&gt;&lt;li&gt;Entry ID: 37981253be9b941baa1b1da7671df90e358daeb926e78a49bddfc28d2299127b&lt;/li&gt;&lt;/ul&gt;</content>
  </entry>
  <entry>
    <id>tag:datacenterdata.com,2026:update:55a2009600caa9d14b089818ea6732f436e2f5d83f0dc89453fbd307c1ce12f0</id>
    <title>Evidence record published: HostDime AI/Data Center (Eatonville, FL)</title>
    <link rel="alternate" type="text/html" href="https://datacenterdata.com/facilities/hostdime-eatonville-fl/"/>
    <published>2026-09-21T20:28:48Z</published>
    <updated>2026-09-21T20:28:48Z</updated>
    <category term="evidence_update" label="Evidence update"/><category term="record_published" label="Evidence record published"/><category term="state:FL" label="Florida"/>
    <summary>This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown. Added as one construction-stage building after fresh review of the municipal packet and meeting page; directory naming, capacity and opening claims were excluded.</summary>
    <content type="html">&lt;p&gt;This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown.&lt;/p&gt;&lt;p&gt;Added as one construction-stage building after fresh review of the municipal packet and meeting page; directory naming, capacity and opening claims were excluded.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Published on DataCenterData: 2026-09-13&lt;/li&gt;&lt;li&gt;Record: hostdime-eatonville-fl&lt;/li&gt;&lt;li&gt;Entry ID: 55a2009600caa9d14b089818ea6732f436e2f5d83f0dc89453fbd307c1ce12f0&lt;/li&gt;&lt;/ul&gt;</content>
  </entry>
  <entry>
    <id>tag:datacenterdata.com,2026:update:59508b53aadbda1985fb8a7e68eba00e00bd1a37cbde59a55f28ac176da2a772</id>
    <title>Evidence record published: Beale Data Center (De Soto, KS)</title>
    <link rel="alternate" type="text/html" href="https://datacenterdata.com/projects/beale-project-pilot-de-soto-ks/"/>
    <published>2026-09-21T20:28:48Z</published>
    <updated>2026-09-21T20:28:48Z</updated>
    <category term="evidence_update" label="Evidence update"/><category term="record_published" label="Evidence record published"/><category term="state:KS" label="Kansas"/>
    <summary>This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown. Added as one construction-stage campus after separate review of current City pages; planned buildings were kept out of operating-facility counts and operator identity remains unknown.</summary>
    <content type="html">&lt;p&gt;This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown.&lt;/p&gt;&lt;p&gt;Added as one construction-stage campus after separate review of current City pages; planned buildings were kept out of operating-facility counts and operator identity remains unknown.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Published on DataCenterData: 2026-09-13&lt;/li&gt;&lt;li&gt;Record: beale-project-pilot-de-soto-ks&lt;/li&gt;&lt;li&gt;Entry ID: 59508b53aadbda1985fb8a7e68eba00e00bd1a37cbde59a55f28ac176da2a772&lt;/li&gt;&lt;/ul&gt;</content>
  </entry>
  <entry>
    <id>tag:datacenterdata.com,2026:update:59548729a7c9178407e5e4c31a986dc49cafb635ddd05f1348aad92cb62d710a</id>
    <title>Evidence record published: Meta Gallatin Data Center (Gallatin, TN)</title>
    <link rel="alternate" type="text/html" href="https://datacenterdata.com/projects/meta-gallatin-tn/"/>
    <published>2026-09-21T20:28:48Z</published>
    <updated>2026-09-21T20:28:48Z</updated>
    <category term="evidence_update" label="Evidence update"/><category term="record_published" label="Evidence record published"/><category term="state:TN" label="Tennessee"/>
    <summary>This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown. Added as one campus record; operating status remains visibly operator-attributed and regional renewable-generation figures were excluded from campus capacity.</summary>
    <content type="html">&lt;p&gt;This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown.&lt;/p&gt;&lt;p&gt;Added as one campus record; operating status remains visibly operator-attributed and regional renewable-generation figures were excluded from campus capacity.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Published on DataCenterData: 2026-09-13&lt;/li&gt;&lt;li&gt;Record: meta-gallatin-tn&lt;/li&gt;&lt;li&gt;Entry ID: 59548729a7c9178407e5e4c31a986dc49cafb635ddd05f1348aad92cb62d710a&lt;/li&gt;&lt;/ul&gt;</content>
  </entry>
  <entry>
    <id>tag:datacenterdata.com,2026:update:662ae1c27a89a9fdfc9fb62b516e034123a310703821bb9b40226d6fa00364c6</id>
    <title>Evidence record published: Cumulus Group LLC Buffalo Data Center (Buffalo, WV)</title>
    <link rel="alternate" type="text/html" href="https://datacenterdata.com/projects/cumulus-buffalo-data-center-wv/"/>
    <published>2026-09-21T20:28:48Z</published>
    <updated>2026-09-21T20:28:48Z</updated>
    <category term="evidence_update" label="Evidence update"/><category term="record_published" label="Evidence record published"/><category term="state:WV" label="West Virginia"/>
    <summary>This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown. Added as one proposed project from the live application and pending register; generator ratings and a possible Google relationship were not promoted.</summary>
    <content type="html">&lt;p&gt;This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown.&lt;/p&gt;&lt;p&gt;Added as one proposed project from the live application and pending register; generator ratings and a possible Google relationship were not promoted.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Published on DataCenterData: 2026-09-13&lt;/li&gt;&lt;li&gt;Record: cumulus-buffalo-data-center-wv&lt;/li&gt;&lt;li&gt;Entry ID: 662ae1c27a89a9fdfc9fb62b516e034123a310703821bb9b40226d6fa00364c6&lt;/li&gt;&lt;/ul&gt;</content>
  </entry>
  <entry>
    <id>tag:datacenterdata.com,2026:update:6d0fe9e03835b64e8dee0394042fe147729a0ba11ec8aaf113683b153662bb39</id>
    <title>Evidence record published: Rifle Range Road Data Center Project (MO)</title>
    <link rel="alternate" type="text/html" href="https://datacenterdata.com/projects/rifle-range-road-data-center-mo/"/>
    <published>2026-09-21T20:28:48Z</published>
    <updated>2026-09-21T20:28:48Z</updated>
    <category term="evidence_update" label="Evidence update"/><category term="record_published" label="Evidence record published"/><category term="state:MO" label="Missouri"/>
    <summary>This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown. Added as one dated construction-stage project; party identities, current progress, capacity and physical scale remain unknown.</summary>
    <content type="html">&lt;p&gt;This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown.&lt;/p&gt;&lt;p&gt;Added as one dated construction-stage project; party identities, current progress, capacity and physical scale remain unknown.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Published on DataCenterData: 2026-09-13&lt;/li&gt;&lt;li&gt;Record: rifle-range-road-data-center-mo&lt;/li&gt;&lt;li&gt;Entry ID: 6d0fe9e03835b64e8dee0394042fe147729a0ba11ec8aaf113683b153662bb39&lt;/li&gt;&lt;/ul&gt;</content>
  </entry>
  <entry>
    <id>tag:datacenterdata.com,2026:update:706955ca1bddccd3687cd5b0d1bc633649a7fa8fdfd3150f017ab3e3306b11f5</id>
    <title>Evidence record published: Thornburg Industrial Park 2 (VA)</title>
    <link rel="alternate" type="text/html" href="https://datacenterdata.com/projects/thornburg-industrial-park-2/"/>
    <published>2026-09-21T20:28:48Z</published>
    <updated>2026-09-21T20:28:48Z</updated>
    <category term="evidence_update" label="Evidence update"/><category term="record_published" label="Evidence record published"/><category term="state:VA" label="Virginia"/>
    <summary>This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown. Added as a bounded under-review project after independent review of Spotsylvania County case records.</summary>
    <content type="html">&lt;p&gt;This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown.&lt;/p&gt;&lt;p&gt;Added as a bounded under-review project after independent review of Spotsylvania County case records.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Published on DataCenterData: 2026-09-13&lt;/li&gt;&lt;li&gt;Record: thornburg-industrial-park-2&lt;/li&gt;&lt;li&gt;Entry ID: 706955ca1bddccd3687cd5b0d1bc633649a7fa8fdfd3150f017ab3e3306b11f5&lt;/li&gt;&lt;/ul&gt;</content>
  </entry>
  <entry>
    <id>tag:datacenterdata.com,2026:update:77d3c2b7f106d949898ec62d19523a85726913c433eec017a73f5c95ba9b6b2b</id>
    <title>Evidence record published: Massaponax Tech Campus (VA)</title>
    <link rel="alternate" type="text/html" href="https://datacenterdata.com/projects/massaponax-tech-campus/"/>
    <published>2026-09-21T20:28:48Z</published>
    <updated>2026-09-21T20:28:48Z</updated>
    <category term="evidence_update" label="Evidence update"/><category term="record_published" label="Evidence record published"/><category term="state:VA" label="Virginia"/>
    <summary>This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown. Added as a bounded under-review project after independent review of Spotsylvania County case records.</summary>
    <content type="html">&lt;p&gt;This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown.&lt;/p&gt;&lt;p&gt;Added as a bounded under-review project after independent review of Spotsylvania County case records.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Published on DataCenterData: 2026-09-13&lt;/li&gt;&lt;li&gt;Record: massaponax-tech-campus&lt;/li&gt;&lt;li&gt;Entry ID: 77d3c2b7f106d949898ec62d19523a85726913c433eec017a73f5c95ba9b6b2b&lt;/li&gt;&lt;/ul&gt;</content>
  </entry>
  <entry>
    <id>tag:datacenterdata.com,2026:update:7b023b589e8668d33cebcbeed3d98c83365835ea11bc39ebc936e661be3038e5</id>
    <title>Evidence record published: Related Digital Cheyenne Data Center Campus (Cheyenne, WY)</title>
    <link rel="alternate" type="text/html" href="https://datacenterdata.com/projects/related-digital-cheyenne-wy/"/>
    <published>2026-09-21T20:28:48Z</published>
    <updated>2026-09-21T20:28:48Z</updated>
    <category term="evidence_update" label="Evidence update"/><category term="record_published" label="Evidence record published"/><category term="state:WY" label="Wyoming"/>
    <summary>This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown. Added as one construction-stage campus; the 302 MW and first-facility figures remain explicitly planned rather than current or operating.</summary>
    <content type="html">&lt;p&gt;This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown.&lt;/p&gt;&lt;p&gt;Added as one construction-stage campus; the 302 MW and first-facility figures remain explicitly planned rather than current or operating.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Published on DataCenterData: 2026-09-13&lt;/li&gt;&lt;li&gt;Record: related-digital-cheyenne-wy&lt;/li&gt;&lt;li&gt;Entry ID: 7b023b589e8668d33cebcbeed3d98c83365835ea11bc39ebc936e661be3038e5&lt;/li&gt;&lt;/ul&gt;</content>
  </entry>
  <entry>
    <id>tag:datacenterdata.com,2026:update:7dd69737930a639452d45864cf1baf22f1f47497969cc26364074d726bb847c6</id>
    <title>Evidence record published: STREAM U.S. Data Centers at STAMP (Project Double Reed) (Alabama, NY)</title>
    <link rel="alternate" type="text/html" href="https://datacenterdata.com/projects/stream-stamp-alabama-ny/"/>
    <published>2026-09-21T20:28:48Z</published>
    <updated>2026-09-21T20:28:48Z</updated>
    <category term="evidence_update" label="Evidence update"/><category term="record_published" label="Evidence record published"/><category term="state:NY" label="New York"/>
    <summary>This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown. Added as one proposed project after fresh review of current GCEDC materials; the rescinded 2025 configuration was not counted separately and 500 MW was typed only as an applicant estimate.</summary>
    <content type="html">&lt;p&gt;This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown.&lt;/p&gt;&lt;p&gt;Added as one proposed project after fresh review of current GCEDC materials; the rescinded 2025 configuration was not counted separately and 500 MW was typed only as an applicant estimate.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Published on DataCenterData: 2026-09-13&lt;/li&gt;&lt;li&gt;Record: stream-stamp-alabama-ny&lt;/li&gt;&lt;li&gt;Entry ID: 7dd69737930a639452d45864cf1baf22f1f47497969cc26364074d726bb847c6&lt;/li&gt;&lt;/ul&gt;</content>
  </entry>
  <entry>
    <id>tag:datacenterdata.com,2026:update:82c066eb30ed08148a517be15b4edd13b324341fae3f572c9c9464fb150dcd83</id>
    <title>Evidence record published: AL Bessemer Land Data Center Project (Bessemer, AL)</title>
    <link rel="alternate" type="text/html" href="https://datacenterdata.com/projects/al-bessemer-land-data-center/"/>
    <published>2026-09-21T20:28:48Z</published>
    <updated>2026-09-21T20:28:48Z</updated>
    <category term="evidence_update" label="Evidence update"/><category term="record_published" label="Evidence record published"/><category term="state:AL" label="Alabama"/>
    <summary>This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown. Added as one zoning-approved project; company identity, construction, acreage and capacity claims remain excluded.</summary>
    <content type="html">&lt;p&gt;This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown.&lt;/p&gt;&lt;p&gt;Added as one zoning-approved project; company identity, construction, acreage and capacity claims remain excluded.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Published on DataCenterData: 2026-09-13&lt;/li&gt;&lt;li&gt;Record: al-bessemer-land-data-center&lt;/li&gt;&lt;li&gt;Entry ID: 82c066eb30ed08148a517be15b4edd13b324341fae3f572c9c9464fb150dcd83&lt;/li&gt;&lt;/ul&gt;</content>
  </entry>
  <entry>
    <id>tag:datacenterdata.com,2026:update:8ca0cc261d4f01e98c200fc853c8543855477cdf1c7104be380c437748b7929d</id>
    <title>Evidence record published: ADC Plano (Plano, TX)</title>
    <link rel="alternate" type="text/html" href="https://datacenterdata.com/facilities/adc-plano/"/>
    <published>2026-09-21T20:28:48Z</published>
    <updated>2026-09-21T20:28:48Z</updated>
    <category term="evidence_update" label="Evidence update"/><category term="record_published" label="Evidence record published"/><category term="state:TX" label="Texas"/>
    <summary>This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown. Added as a bounded operating-facility record after independent review of current TCEQ records.</summary>
    <content type="html">&lt;p&gt;This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown.&lt;/p&gt;&lt;p&gt;Added as a bounded operating-facility record after independent review of current TCEQ records.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Published on DataCenterData: 2026-09-13&lt;/li&gt;&lt;li&gt;Record: adc-plano&lt;/li&gt;&lt;li&gt;Entry ID: 8ca0cc261d4f01e98c200fc853c8543855477cdf1c7104be380c437748b7929d&lt;/li&gt;&lt;/ul&gt;</content>
  </entry>
  <entry>
    <id>tag:datacenterdata.com,2026:update:9146fdda88d229be84685d81c92675db73f44e9d4b6ff34452a435ec53ffeef5</id>
    <title>Evidence record published: Paducah Site AI/HPC Innovation Campus (KY)</title>
    <link rel="alternate" type="text/html" href="https://datacenterdata.com/projects/brookfield-paducah-site-ai-campus-ky/"/>
    <published>2026-09-21T20:28:48Z</published>
    <updated>2026-09-21T20:28:48Z</updated>
    <category term="evidence_update" label="Evidence update"/><category term="record_published" label="Evidence record published"/><category term="state:KY" label="Kentucky"/>
    <summary>This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown. Added as one proposed campus; the 1.8 GW remains an announced design figure and separate generation and storage figures were excluded.</summary>
    <content type="html">&lt;p&gt;This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown.&lt;/p&gt;&lt;p&gt;Added as one proposed campus; the 1.8 GW remains an announced design figure and separate generation and storage figures were excluded.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Published on DataCenterData: 2026-09-13&lt;/li&gt;&lt;li&gt;Record: brookfield-paducah-site-ai-campus-ky&lt;/li&gt;&lt;li&gt;Entry ID: 9146fdda88d229be84685d81c92675db73f44e9d4b6ff34452a435ec53ffeef5&lt;/li&gt;&lt;/ul&gt;</content>
  </entry>
  <entry>
    <id>tag:datacenterdata.com,2026:update:947ba90d147d32063df75f22d2127e270df395a44dca4399a501cb807be04f50</id>
    <title>Evidence record published: Mineral Gap Data Center (Wise, VA)</title>
    <link rel="alternate" type="text/html" href="https://datacenterdata.com/facilities/mineral-gap-data-center/"/>
    <published>2026-09-21T20:28:48Z</published>
    <updated>2026-09-21T20:28:48Z</updated>
    <category term="evidence_update" label="Evidence update"/><category term="record_published" label="Evidence record published"/><category term="state:VA" label="Virginia"/>
    <summary>This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown. Added as a bounded operating-facility record after independent review of the cited Wise County source.</summary>
    <content type="html">&lt;p&gt;This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown.&lt;/p&gt;&lt;p&gt;Added as a bounded operating-facility record after independent review of the cited Wise County source.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Published on DataCenterData: 2026-09-13&lt;/li&gt;&lt;li&gt;Record: mineral-gap-data-center&lt;/li&gt;&lt;li&gt;Entry ID: 947ba90d147d32063df75f22d2127e270df395a44dca4399a501cb807be04f50&lt;/li&gt;&lt;/ul&gt;</content>
  </entry>
  <entry>
    <id>tag:datacenterdata.com,2026:update:a3c1cc8c714620d86754a600747aa2aaccac6f22ef9e5aabdf2c510f348bf8d7</id>
    <title>Evidence record published: Apple Maiden Data Center Campus (Maiden, NC)</title>
    <link rel="alternate" type="text/html" href="https://datacenterdata.com/projects/apple-maiden-nc/"/>
    <published>2026-09-21T20:28:48Z</published>
    <updated>2026-09-21T20:28:48Z</updated>
    <category term="evidence_update" label="Evidence update"/><category term="record_published" label="Evidence record published"/><category term="state:NC" label="North Carolina"/>
    <summary>This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown. Added as one operating campus at Maiden/Catawba precision after separate review of the County statement; directory address, date, capacity and scale details were excluded.</summary>
    <content type="html">&lt;p&gt;This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown.&lt;/p&gt;&lt;p&gt;Added as one operating campus at Maiden/Catawba precision after separate review of the County statement; directory address, date, capacity and scale details were excluded.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Published on DataCenterData: 2026-09-13&lt;/li&gt;&lt;li&gt;Record: apple-maiden-nc&lt;/li&gt;&lt;li&gt;Entry ID: a3c1cc8c714620d86754a600747aa2aaccac6f22ef9e5aabdf2c510f348bf8d7&lt;/li&gt;&lt;/ul&gt;</content>
  </entry>
  <entry>
    <id>tag:datacenterdata.com,2026:update:a54f1861790d53ce687a4035ff52efd9cb18b7f71cd8d8a2d1abe4c2e4cb84da</id>
    <title>Evidence record published: EdgeCore Shannon Hill Data Center Project (VA)</title>
    <link rel="alternate" type="text/html" href="https://datacenterdata.com/projects/edgecore-shannon-hill/"/>
    <published>2026-09-21T20:28:48Z</published>
    <updated>2026-09-21T20:28:48Z</updated>
    <category term="evidence_update" label="Evidence update"/><category term="record_published" label="Evidence record published"/><category term="state:VA" label="Virginia"/>
    <summary>This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown. Added as a bounded proposed-stage project after independent review of the cited Louisa County record.</summary>
    <content type="html">&lt;p&gt;This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown.&lt;/p&gt;&lt;p&gt;Added as a bounded proposed-stage project after independent review of the cited Louisa County record.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Published on DataCenterData: 2026-09-13&lt;/li&gt;&lt;li&gt;Record: edgecore-shannon-hill&lt;/li&gt;&lt;li&gt;Entry ID: a54f1861790d53ce687a4035ff52efd9cb18b7f71cd8d8a2d1abe4c2e4cb84da&lt;/li&gt;&lt;/ul&gt;</content>
  </entry>
  <entry>
    <id>tag:datacenterdata.com,2026:update:b197ee12dcced2bda5e84b079d9aee58bf222ceb2627cc049084f46e17fde2c2</id>
    <title>Evidence record published: Google West Memphis Campus (West Memphis, AR)</title>
    <link rel="alternate" type="text/html" href="https://datacenterdata.com/projects/google-west-memphis-campus/"/>
    <published>2026-09-21T20:28:48Z</published>
    <updated>2026-09-21T20:28:48Z</updated>
    <category term="evidence_update" label="Evidence update"/><category term="record_published" label="Evidence record published"/><category term="state:AR" label="Arkansas"/>
    <summary>This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown. Added as one construction-stage campus after fresh review of state, utility-commission and utility sources; unverified building, parcel and capacity details were excluded.</summary>
    <content type="html">&lt;p&gt;This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown.&lt;/p&gt;&lt;p&gt;Added as one construction-stage campus after fresh review of state, utility-commission and utility sources; unverified building, parcel and capacity details were excluded.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Published on DataCenterData: 2026-09-13&lt;/li&gt;&lt;li&gt;Record: google-west-memphis-campus&lt;/li&gt;&lt;li&gt;Entry ID: b197ee12dcced2bda5e84b079d9aee58bf222ceb2627cc049084f46e17fde2c2&lt;/li&gt;&lt;/ul&gt;</content>
  </entry>
  <entry>
    <id>tag:datacenterdata.com,2026:update:b7d3588a62d6b83c04011047fd786c7a38546c973f5ea9fa0287a8bc258a9253</id>
    <title>Evidence record published: Polaris Forge 2 (ND)</title>
    <link rel="alternate" type="text/html" href="https://datacenterdata.com/projects/applied-digital-polaris-forge-2-harwood-nd/"/>
    <published>2026-09-21T20:28:48Z</published>
    <updated>2026-09-21T20:28:48Z</updated>
    <category term="evidence_update" label="Evidence update"/><category term="record_published" label="Evidence record published"/><category term="state:ND" label="North Dakota"/>
    <summary>This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown. Added as one construction-stage campus; the lease-backed 200 MW was scoped to the initial two-building phase and developer, operator, owner and tenant identities remain unresolved.</summary>
    <content type="html">&lt;p&gt;This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown.&lt;/p&gt;&lt;p&gt;Added as one construction-stage campus; the lease-backed 200 MW was scoped to the initial two-building phase and developer, operator, owner and tenant identities remain unresolved.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Published on DataCenterData: 2026-09-13&lt;/li&gt;&lt;li&gt;Record: applied-digital-polaris-forge-2-harwood-nd&lt;/li&gt;&lt;li&gt;Entry ID: b7d3588a62d6b83c04011047fd786c7a38546c973f5ea9fa0287a8bc258a9253&lt;/li&gt;&lt;/ul&gt;</content>
  </entry>
  <entry>
    <id>tag:datacenterdata.com,2026:update:ba5c6d4a6635d01aae2b983e04bf1a6549a3acbc2c5127f624cd2e2c3e24cb4d</id>
    <title>Evidence record published: Pairmont Data Center Campus (VA)</title>
    <link rel="alternate" type="text/html" href="https://datacenterdata.com/projects/pairmont-data-center-campus/"/>
    <published>2026-09-21T20:28:48Z</published>
    <updated>2026-09-21T20:28:48Z</updated>
    <category term="evidence_update" label="Evidence update"/><category term="record_published" label="Evidence record published"/><category term="state:VA" label="Virginia"/>
    <summary>This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown. Added as a bounded under-review project after independent review of Spotsylvania County case records.</summary>
    <content type="html">&lt;p&gt;This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown.&lt;/p&gt;&lt;p&gt;Added as a bounded under-review project after independent review of Spotsylvania County case records.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Published on DataCenterData: 2026-09-13&lt;/li&gt;&lt;li&gt;Record: pairmont-data-center-campus&lt;/li&gt;&lt;li&gt;Entry ID: ba5c6d4a6635d01aae2b983e04bf1a6549a3acbc2c5127f624cd2e2c3e24cb4d&lt;/li&gt;&lt;/ul&gt;</content>
  </entry>
  <entry>
    <id>tag:datacenterdata.com,2026:update:c2983c862af40feeebc2bf70e444d40410e6e1d82839b14edc97b2e60ab0661c</id>
    <title>Evidence record published: Global AI (Colorado), LLC Data Center Project (CO)</title>
    <link rel="alternate" type="text/html" href="https://datacenterdata.com/projects/global-ai-weld-county-co/"/>
    <published>2026-09-21T20:28:48Z</published>
    <updated>2026-09-21T20:28:48Z</updated>
    <category term="evidence_update" label="Evidence update"/><category term="record_published" label="Evidence record published"/><category term="state:CO" label="Colorado"/>
    <summary>This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown. Added as one land-use-approved reuse project; construction, operation, capacity and operator remain unproven.</summary>
    <content type="html">&lt;p&gt;This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown.&lt;/p&gt;&lt;p&gt;Added as one land-use-approved reuse project; construction, operation, capacity and operator remain unproven.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Published on DataCenterData: 2026-09-13&lt;/li&gt;&lt;li&gt;Record: global-ai-weld-county-co&lt;/li&gt;&lt;li&gt;Entry ID: c2983c862af40feeebc2bf70e444d40410e6e1d82839b14edc97b2e60ab0661c&lt;/li&gt;&lt;/ul&gt;</content>
  </entry>
  <entry>
    <id>tag:datacenterdata.com,2026:update:c72cc4d51040104f585bd62ab7e3170fdf602135a9e1aa9c376c61295c77cb3b</id>
    <title>Evidence record published: Goodnight Data Center (Claude, TX)</title>
    <link rel="alternate" type="text/html" href="https://datacenterdata.com/projects/goodnight-data-center/"/>
    <published>2026-09-21T20:28:48Z</published>
    <updated>2026-09-21T20:28:48Z</updated>
    <category term="evidence_update" label="Evidence update"/><category term="record_published" label="Evidence record published"/><category term="state:TX" label="Texas"/>
    <summary>This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown. Added as a permit-defined proposed project after independent review of current TCEQ records.</summary>
    <content type="html">&lt;p&gt;This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown.&lt;/p&gt;&lt;p&gt;Added as a permit-defined proposed project after independent review of current TCEQ records.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Published on DataCenterData: 2026-09-13&lt;/li&gt;&lt;li&gt;Record: goodnight-data-center&lt;/li&gt;&lt;li&gt;Entry ID: c72cc4d51040104f585bd62ab7e3170fdf602135a9e1aa9c376c61295c77cb3b&lt;/li&gt;&lt;/ul&gt;</content>
  </entry>
  <entry>
    <id>tag:datacenterdata.com,2026:update:c7603d0628e320a775a3859052a466b87e6f262e3caa52028801e0aab01e916d</id>
    <title>Evidence record published: Apple Reno Data Center (Sparks, NV)</title>
    <link rel="alternate" type="text/html" href="https://datacenterdata.com/projects/apple-reno-data-center/"/>
    <published>2026-09-21T20:28:48Z</published>
    <updated>2026-09-21T20:28:48Z</updated>
    <category term="evidence_update" label="Evidence update"/><category term="record_published" label="Evidence record published"/><category term="state:NV" label="Nevada"/>
    <summary>This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown. Added as a bounded operating-campus record after a second review of the Nevada GOED minutes and application packet.</summary>
    <content type="html">&lt;p&gt;This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown.&lt;/p&gt;&lt;p&gt;Added as a bounded operating-campus record after a second review of the Nevada GOED minutes and application packet.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Published on DataCenterData: 2026-09-13&lt;/li&gt;&lt;li&gt;Record: apple-reno-data-center&lt;/li&gt;&lt;li&gt;Entry ID: c7603d0628e320a775a3859052a466b87e6f262e3caa52028801e0aab01e916d&lt;/li&gt;&lt;/ul&gt;</content>
  </entry>
  <entry>
    <id>tag:datacenterdata.com,2026:update:c95d011fd7376158d7949e16af163eff6ad61cfcdc754ffc6742d29bd118fad5</id>
    <title>Evidence record published: Amazon Vicksburg Project (Vicksburg, MS)</title>
    <link rel="alternate" type="text/html" href="https://datacenterdata.com/projects/amazon-vicksburg-project-ms/"/>
    <published>2026-09-21T20:28:48Z</published>
    <updated>2026-09-21T20:28:48Z</updated>
    <category term="evidence_update" label="Evidence update"/><category term="record_published" label="Evidence record published"/><category term="state:MS" label="Mississippi"/>
    <summary>This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown. Added as one state-announced proposed project; site, county, roles, approvals and capacity remain unknown.</summary>
    <content type="html">&lt;p&gt;This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown.&lt;/p&gt;&lt;p&gt;Added as one state-announced proposed project; site, county, roles, approvals and capacity remain unknown.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Published on DataCenterData: 2026-09-13&lt;/li&gt;&lt;li&gt;Record: amazon-vicksburg-project-ms&lt;/li&gt;&lt;li&gt;Entry ID: c95d011fd7376158d7949e16af163eff6ad61cfcdc754ffc6742d29bd118fad5&lt;/li&gt;&lt;/ul&gt;</content>
  </entry>
  <entry>
    <id>tag:datacenterdata.com,2026:update:ced5b76f1117876f03c7ffae08cd89644317432800dac1c472ffce3ab78f68ce</id>
    <title>Evidence record published: QTS York County Data Center Campus (SC)</title>
    <link rel="alternate" type="text/html" href="https://datacenterdata.com/projects/qts-york-county-campus/"/>
    <published>2026-09-21T20:28:48Z</published>
    <updated>2026-09-21T20:28:48Z</updated>
    <category term="evidence_update" label="Evidence update"/><category term="record_published" label="Evidence record published"/><category term="state:SC" label="South Carolina"/>
    <summary>This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown. Added as one construction-stage campus after a fresh review of county and state records; planned/developing buildings were not counted as operating facilities.</summary>
    <content type="html">&lt;p&gt;This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown.&lt;/p&gt;&lt;p&gt;Added as one construction-stage campus after a fresh review of county and state records; planned/developing buildings were not counted as operating facilities.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Published on DataCenterData: 2026-09-13&lt;/li&gt;&lt;li&gt;Record: qts-york-county-campus&lt;/li&gt;&lt;li&gt;Entry ID: ced5b76f1117876f03c7ffae08cd89644317432800dac1c472ffce3ab78f68ce&lt;/li&gt;&lt;/ul&gt;</content>
  </entry>
  <entry>
    <id>tag:datacenterdata.com,2026:update:d2855c7757d5e9fc147b8992e60fb98b2d45a7deeb34e15262470d3cac235df3</id>
    <title>Evidence record published: Meta Tulsa Data Center (Tulsa, OK)</title>
    <link rel="alternate" type="text/html" href="https://datacenterdata.com/projects/meta-tulsa-ok/"/>
    <published>2026-09-21T20:28:48Z</published>
    <updated>2026-09-21T20:28:48Z</updated>
    <category term="evidence_update" label="Evidence update"/><category term="record_published" label="Evidence record published"/><category term="state:OK" label="Oklahoma"/>
    <summary>This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown. Added as one construction-stage project; grid-energy capacity and industrial-park acreage were excluded from the data-center record.</summary>
    <content type="html">&lt;p&gt;This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown.&lt;/p&gt;&lt;p&gt;Added as one construction-stage project; grid-energy capacity and industrial-park acreage were excluded from the data-center record.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Published on DataCenterData: 2026-09-13&lt;/li&gt;&lt;li&gt;Record: meta-tulsa-ok&lt;/li&gt;&lt;li&gt;Entry ID: d2855c7757d5e9fc147b8992e60fb98b2d45a7deeb34e15262470d3cac235df3&lt;/li&gt;&lt;/ul&gt;</content>
  </entry>
  <entry>
    <id>tag:datacenterdata.com,2026:update:d8e78f137bc0f26785490fe224b0416f473c0cb3454c56e8b74f8e618294259d</id>
    <title>Evidence record published: Amazon Data Services BWI-150–BWI-153 Campus (MD)</title>
    <link rel="alternate" type="text/html" href="https://datacenterdata.com/projects/amazon-bwi150-frederick-campus/"/>
    <published>2026-09-21T20:28:48Z</published>
    <updated>2026-09-21T20:28:48Z</updated>
    <category term="evidence_update" label="Evidence update"/><category term="record_published" label="Evidence record published"/><category term="state:MD" label="Maryland"/>
    <summary>This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown. Added as one permit-approved campus after a fresh review of the issued permit and MDE pages; generator ratings and broader-site relationships were not promoted.</summary>
    <content type="html">&lt;p&gt;This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown.&lt;/p&gt;&lt;p&gt;Added as one permit-approved campus after a fresh review of the issued permit and MDE pages; generator ratings and broader-site relationships were not promoted.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Published on DataCenterData: 2026-09-13&lt;/li&gt;&lt;li&gt;Record: amazon-bwi150-frederick-campus&lt;/li&gt;&lt;li&gt;Entry ID: d8e78f137bc0f26785490fe224b0416f473c0cb3454c56e8b74f8e618294259d&lt;/li&gt;&lt;/ul&gt;</content>
  </entry>
  <entry>
    <id>tag:datacenterdata.com,2026:update:e49810115e9539ff17979b26116d9ebf25401e53d6487fe752f8d15b3bbae078</id>
    <title>Evidence record published: Gilroy Data Center (Gilroy, CA)</title>
    <link rel="alternate" type="text/html" href="https://datacenterdata.com/projects/gilroy-data-center/"/>
    <published>2026-09-21T20:28:48Z</published>
    <updated>2026-09-21T20:28:48Z</updated>
    <category term="evidence_update" label="Evidence update"/><category term="record_published" label="Evidence record published"/><category term="state:CA" label="California"/>
    <summary>This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown. Added as a bounded construction-stage project after independent review of the City of Gilroy source.</summary>
    <content type="html">&lt;p&gt;This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown.&lt;/p&gt;&lt;p&gt;Added as a bounded construction-stage project after independent review of the City of Gilroy source.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Published on DataCenterData: 2026-09-13&lt;/li&gt;&lt;li&gt;Record: gilroy-data-center&lt;/li&gt;&lt;li&gt;Entry ID: e49810115e9539ff17979b26116d9ebf25401e53d6487fe752f8d15b3bbae078&lt;/li&gt;&lt;/ul&gt;</content>
  </entry>
  <entry>
    <id>tag:datacenterdata.com,2026:update:e6154a690db6233828643ae0ffbf1547c059bbc93440ed374b507dedd3c1d0b9</id>
    <title>Evidence record published: Solis Arx / Fluidstack Progress Park Project (VA)</title>
    <link rel="alternate" type="text/html" href="https://datacenterdata.com/projects/solis-arx-fluidstack-progress-park/"/>
    <published>2026-09-21T20:28:48Z</published>
    <updated>2026-09-21T20:28:48Z</updated>
    <category term="evidence_update" label="Evidence update"/><category term="record_published" label="Evidence record published"/><category term="state:VA" label="Virginia"/>
    <summary>This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown. Added as a bounded proposed-stage project after independent review of the cited Wythe County record.</summary>
    <content type="html">&lt;p&gt;This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown.&lt;/p&gt;&lt;p&gt;Added as a bounded proposed-stage project after independent review of the cited Wythe County record.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Published on DataCenterData: 2026-09-13&lt;/li&gt;&lt;li&gt;Record: solis-arx-fluidstack-progress-park&lt;/li&gt;&lt;li&gt;Entry ID: e6154a690db6233828643ae0ffbf1547c059bbc93440ed374b507dedd3c1d0b9&lt;/li&gt;&lt;/ul&gt;</content>
  </entry>
  <entry>
    <id>tag:datacenterdata.com,2026:update:eb2628b2d2555674351c37ed4fed48eea57e4ec82acdafe52f1c290fc357e968</id>
    <title>Evidence record published: Nexus Data Center Hubbard (Hubbard, TX)</title>
    <link rel="alternate" type="text/html" href="https://datacenterdata.com/projects/nexus-data-center-hubbard/"/>
    <published>2026-09-21T20:28:48Z</published>
    <updated>2026-09-21T20:28:48Z</updated>
    <category term="evidence_update" label="Evidence update"/><category term="record_published" label="Evidence record published"/><category term="state:TX" label="Texas"/>
    <summary>This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown. Added as a permit-defined proposed project after independent review of current TCEQ records.</summary>
    <content type="html">&lt;p&gt;This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown.&lt;/p&gt;&lt;p&gt;Added as a permit-defined proposed project after independent review of current TCEQ records.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Published on DataCenterData: 2026-09-13&lt;/li&gt;&lt;li&gt;Record: nexus-data-center-hubbard&lt;/li&gt;&lt;li&gt;Entry ID: eb2628b2d2555674351c37ed4fed48eea57e4ec82acdafe52f1c290fc357e968&lt;/li&gt;&lt;/ul&gt;</content>
  </entry>
  <entry>
    <id>tag:datacenterdata.com,2026:update:ef276e337d461d4b83f95836703efc0a730b5abb986c7c28ea69786fbcebe8a1</id>
    <title>Evidence record published: Osmium Data Center (West Des Moines, IA)</title>
    <link rel="alternate" type="text/html" href="https://datacenterdata.com/facilities/osmium-data-center-west-des-moines/"/>
    <published>2026-09-21T20:28:48Z</published>
    <updated>2026-09-21T20:28:48Z</updated>
    <category term="evidence_update" label="Evidence update"/><category term="record_published" label="Evidence record published"/><category term="state:IA" label="Iowa"/>
    <summary>This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown. Added as one permit-defined existing facility; party roles, physical scale and data-center capacity remain unknown.</summary>
    <content type="html">&lt;p&gt;This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown.&lt;/p&gt;&lt;p&gt;Added as one permit-defined existing facility; party roles, physical scale and data-center capacity remain unknown.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Published on DataCenterData: 2026-09-13&lt;/li&gt;&lt;li&gt;Record: osmium-data-center-west-des-moines&lt;/li&gt;&lt;li&gt;Entry ID: ef276e337d461d4b83f95836703efc0a730b5abb986c7c28ea69786fbcebe8a1&lt;/li&gt;&lt;/ul&gt;</content>
  </entry>
  <entry>
    <id>tag:datacenterdata.com,2026:update:fc7287b8e1cf66237a592b6a93de386651afcdd5cc9be4cd79bea0536e48a83b</id>
    <title>Evidence record published: Project Bedrock (Nampa, ID)</title>
    <link rel="alternate" type="text/html" href="https://datacenterdata.com/facilities/project-bedrock-nampa-id/"/>
    <published>2026-09-21T20:28:48Z</published>
    <updated>2026-09-21T20:28:48Z</updated>
    <category term="evidence_update" label="Evidence update"/><category term="record_published" label="Evidence record published"/><category term="state:ID" label="Idaho"/>
    <summary>This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown. Added as one approved building after separate review of City permit and planning records; non-official capacity and construction claims were excluded.</summary>
    <content type="html">&lt;p&gt;This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown.&lt;/p&gt;&lt;p&gt;Added as one approved building after separate review of City permit and planning records; non-official capacity and construction claims were excluded.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Published on DataCenterData: 2026-09-13&lt;/li&gt;&lt;li&gt;Record: project-bedrock-nampa-id&lt;/li&gt;&lt;li&gt;Entry ID: fc7287b8e1cf66237a592b6a93de386651afcdd5cc9be4cd79bea0536e48a83b&lt;/li&gt;&lt;/ul&gt;</content>
  </entry>
  <entry>
    <id>tag:datacenterdata.com,2026:update:490154c258b16e8d82eaa38bdf03e38d60b9e776b3dcb216181e416bf5378728</id>
    <title>Evidence record published: QTS Eagle Mountain Campus (Eagle Mountain, UT)</title>
    <link rel="alternate" type="text/html" href="https://datacenterdata.com/projects/qts-eagle-mountain-campus/"/>
    <published>2026-09-21T20:28:48Z</published>
    <updated>2026-09-21T20:28:48Z</updated>
    <category term="evidence_update" label="Evidence update"/><category term="record_published" label="Evidence record published"/><category term="state:UT" label="Utah"/>
    <summary>This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown. Added as a bounded construction-stage campus record after a second review of the cited Eagle Mountain City sources.</summary>
    <content type="html">&lt;p&gt;This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown.&lt;/p&gt;&lt;p&gt;Added as a bounded construction-stage campus record after a second review of the cited Eagle Mountain City sources.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Published on DataCenterData: 2026-09-12&lt;/li&gt;&lt;li&gt;Record: qts-eagle-mountain-campus&lt;/li&gt;&lt;li&gt;Entry ID: 490154c258b16e8d82eaa38bdf03e38d60b9e776b3dcb216181e416bf5378728&lt;/li&gt;&lt;/ul&gt;</content>
  </entry>
  <entry>
    <id>tag:datacenterdata.com,2026:update:b2f39283de4d804179792d0adedbb51535ad468de00dc7ebc4e888344cd8aff0</id>
    <title>Evidence record published: Vantage Lighthouse Campus (Port Washington, WI)</title>
    <link rel="alternate" type="text/html" href="https://datacenterdata.com/projects/vantage-lighthouse-port-washington/"/>
    <published>2026-09-21T20:28:48Z</published>
    <updated>2026-09-21T20:28:48Z</updated>
    <category term="evidence_update" label="Evidence update"/><category term="record_published" label="Evidence record published"/><category term="state:WI" label="Wisconsin"/>
    <summary>This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown. Added as a bounded construction-stage campus record after a second review of the cited Wisconsin DNR sources.</summary>
    <content type="html">&lt;p&gt;This is the publication of a DataCenterData evidence record; it is not a new facility and its status label is the reviewed evidence label on the date shown.&lt;/p&gt;&lt;p&gt;Added as a bounded construction-stage campus record after a second review of the cited Wisconsin DNR sources.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Published on DataCenterData: 2026-09-12&lt;/li&gt;&lt;li&gt;Record: vantage-lighthouse-port-washington&lt;/li&gt;&lt;li&gt;Entry ID: b2f39283de4d804179792d0adedbb51535ad468de00dc7ebc4e888344cd8aff0&lt;/li&gt;&lt;/ul&gt;</content>
  </entry>