Virginia index · last changed 19 September 2026
Virginia data centers: what the public record shows.
Selected source-linked records are published below. This is not a complete inventory of Virginia data centers.
Explore Virginia
Map, listings and checked facts.
Start with 139 licensed source leads, then inspect the separate public-evidence layer below. Licensed rows are not independently verified and are not a statewide census.
Virginia map
Reported locations in Virginia
139 licensed rows · 58 source localities · 5 map targets
Browse 5 mapped areas as links
- Ashburn area30 source localities · 98 licensed rowsAshburn, Bowling Green, Brandy Station, Bristow, Chantilly, Clear Brook, Crossroads Technology Campus, Culpeper, Falmouth, Fredericksburg, Gainesville, King George, Leesburg, Louisa, Manassas, Massaponax, McLean, Pairmont Data Center Campus, Project Sisson, Remington, Reston, Spotsylvania, Sterling, Strasburg, Thornburg, Vantage Data Centers VA4 Stafford Campus, Vienna, Vint Hill, Warrenton, Winchester
- Chester area18 source localities · 31 licensed rowsAppomattox, Boydton, Chester, DC Blox Henrico County Campus (withdrawn), Doswell, EdgeCore Shannon Hill Data Center Campus, Glen Allen, Hanover Technology Park, Henrico, Iron Horse Data Center Campus, Midlothian, Mountain Road Technology Park, Petersburg, Richmond, Ruther Glen, Sandston, South Hill, Tuckahoe Technology Park
- Berry Hill area7 source localities · 7 licensed rowsBerry Hill, Cabin Field Road Data Center, Daleville, Max Meadows, Ringgold, Rocky Mount, TAC Data Centers Wythe County Campus
- Chesapeake1 licensed row · approximate
- Wise area2 source localities · 2 licensed rowsWise, Wise Innovation Hub (OASIS)
Map sources and method
The state outline is adapted from the U.S. Census Bureau 2025 cartographic boundary file. Facility coordinates are adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Outline and markers use one geographic projection before any explicitly disclosed readability offset. Exact singleton source anchors are never moved. A one-kilometre boundary tolerance prevents the simplified 1:20,000,000 outline from hiding legitimate border-area source points; farther conflicts are disclosed, not clamped. DataCenterData groups source-reported city coordinates only within a bounded map radius; the outline does not validate a facility record.
Browse all 139 rows below. Licensed rows are not independently verified and remain separate from the checked public-evidence layer.
-
1500 Gateway Data Center (denied)
1500 Gateway Boulevard · Fredericksburg · Virginia
source-reported cancelledCapacity not statedSource updated 27 August 2026approximate locationView facility →dcd-dir-001114 -
source-reported permittedCapacity not statedSource updated 26 July 2026approximate locationView facility →
dcd-dir-000074
Virginia evidence at a glance
Some questions answerable
Selected public evidence, not a statewide census. Each row shows whether it is independently source-linked, attributed, or unresolved; licensed leads remain separate.
- Published project / campus
- 9
- Published facility / building
- 1
- Attributed or unresolved rows
- 0
- Licensed directory leads
- 139 not independently verified
- Capacity boundary stated
- 0 of 10 published DataCenterData rows
- Review timing
- Audit through 11 September 2026 · next 18 November 2026
No public list of DCRSUT memorandum-of-understanding signatories or their localities.
Browse all 139 Virginia licensed leads → · Why these counts differ →
Projects, Campuses, and Operating facilities
2 campus records · 7 project records · 1 operating facility record. Names are as they appear on each record page.
| Google Data Center Campus — Botetourt Center at Greenfield | approvedcampus | UnknownNo independently supported figure | Botetourt County Google Data Center project page →Gov. record |
| EdgeCore Shannon Hill Data Center Project | proposedproject | UnknownNo independently supported figure | Louisa County Sale of Shannon Hill Regional Business Park →Gov. record |
| Solis Arx / Fluidstack Progress Park Project | proposedproject | UnknownNo independently supported figure | Solis Arx/Fluidstack — Progress Park project page →Gov. record |
| Pairmont Data Center Campus | proposedproject | UnknownNo independently supported figure | Spotsylvania County Planning Department March 2026 status report →Gov. record |
| Massaponax Tech Campus | proposedproject | UnknownNo independently supported figure | Spotsylvania County Planning Department March 2026 status report →Gov. record |
| Thornburg Industrial Park 2 | proposedproject | UnknownNo independently supported figure | Spotsylvania County Planning Department March 2026 status report →Gov. record |
| Mineral Gap Data Center | operatingoperating facility | UnknownNo independently supported figure | Data Centers — Wise County Economic Development →Gov. record |
| Google Bermuda Hundred Data Center Campus | constructioncampus · Chesterfield County data-center project status table as of July 2026, Peanut LLC row | UnknownNo independently supported figureNo selected county record states critical-IT, utility-request, utility-service, generation, gross-facility, company-design or measured-load MW. The county's 6.000 MGD maximum public water use for this row is water, not IT load, and is not published as capacity. | Chesterfield County Data Centers — Project Status as of July 2026 →Gov. record |
| Google Upper Magnolia Green Data Center Project | approvedproject · Chesterfield County data-center project status table as of July 2026, Upper Magnolia Green row | UnknownNo independently supported figureNo selected county record states critical-IT or other MW. Tract A acreage is described site area, not capacity. The county's 1.755 MGD maximum public water use is water, not IT load. | Chesterfield County Data Centers — Project Status as of July 2026 →Gov. record |
| Google Watkins Centre Data Center Project | approvedproject · Chesterfield County data-center project status table as of July 2026, Watkins Centre row | UnknownNo independently supported figureNo selected county record states critical-IT or other MW. The 349.97-acre figure is rezoning site area, not capacity. The county's 0.850 MGD maximum public water use is water, not IT load. | Chesterfield County Data Centers — Project Status as of July 2026 →Gov. record |
Where the records were checked
Statewide audit pending
Enough to answer questions
This is still not a list of every data center in the state.
Statewide coverage is not complete. The records below are sourced; a full statewide count has not been published.
State research audit window ended 11 September 2026. Individual records and claims below show their own evidence dates and may be newer.
Next scheduled review: 18 November 2026.
9 independently source-linked project/campus records; 1 independently source-linked facility/building record; 0 attributed or unresolved rows. These counts use different units and must not be added together.
Source families checked, selected records and remaining gaps
These notes name selected records, say which kinds of public evidence were checked and show what remains missing. They do not add anything to the published counts.
- economic development incentives — Checked
- No public list of DCRSUT memorandum-of-understanding signatories or their localities.
- Governor's office release URLs found in search returned unavailable during review and the VEDP press index exposed no announcement titles in the retrieved HTML, so most project-level state announcements were not read.
- Local economic development authority announcements were reached only for Botetourt, Wythe, Louisa and Wise counties.
Selected records
- Data Centers in Virginia (Report 598) · Joint Legislative Audit and Review Commission
- Virginia Tax Exemptions for Data Centers — report to the General Assembly (RD40, January 2, 2026) · Virginia Economic Development Partnership
- Data Center Retail Sales & Use Tax Exemption program page · Virginia Economic Development Partnership
- utility commission large load — Partly checked
- Individual filings in PUR-2025-00058 and in Dominion's integrated resource plan and transmission certificate cases were not yet reviewed directly; the SCC docket search system was not exercised.
- No large-load or interconnection record naming a specific Virginia customer was retrieved.
Selected records
- SCC Data Center Initiatives — Ensuring Data Centers Pay Their Own Costs (fact sheet, February 2026) · Virginia State Corporation Commission
- In Biennial Review Ruling, SCC Creates New Class for Large-Scale Energy Users · Virginia State Corporation Commission
- environmental construction permits — Partly checked
- DEQ air permit list and permits 74288-2, 74341-1, 53266-1 and 74241-3 could not be retrieved during review.
- Corps of Engineers public notices NAO-2022-02394 and NAO-2013-01922 could not be retrieved during review.
- No water withdrawal, VPDES or stormwater construction notices were searched.
- County building, grading and land disturbance permits were reached only through the Botetourt County narrative.
Selected records
- ECHO air facility query — Virginia facilities whose name contains DATA CENTER · U.S. Environmental Protection Agency
- municipal planning assessor gis — Checked
- Loudoun County's LOLA land application system and all individual Loudoun cases were not reached; Loudoun holds the largest concentration of Virginia data centers.
- Caroline County's rezoning case list did not respond during review, and the City of Chesapeake and Town of Warrenton sites refused connections.
- No assessor or GIS parcel query was run for any county.
- Prince William's Data Center Opportunity Zone Overlay page could not be retrieved during review.
Selected records
- PW Digital Gateway — Planning Office project page · Prince William County, Virginia
- Hanover County Board of Supervisors agenda, May 27, 2026 · Hanover County, Virginia
- Voluntary Proffer Statement, Mountain Road Technology Park (REZ2025-00023), April 16, 2026 · Hanover County, Virginia
- tax abatement development agreements — Partly checked
- No executed agreement document was read; only county descriptions of agreements.
- King George County's performance agreement report (the central document in the Amazon dispute) is unread after two 90-second timeouts.
- Local data center equipment tax rates were seen only through news reporting for Hanover, Henrico and Chesterfield.
Selected records
- Louisa County Sale of Shannon Hill Regional Business Park · Louisa County, Virginia
- Board of Supervisors report — Local Performance Agreement for Amazon Data Services, as revised · King George County, Virginia
- operator disclosures — Partly checked
- No AWS, Oracle or Apple disclosure was located for Virginia sites.
- Colocation operator location pages (Equinix, Digital Realty, CyrusOne, NTT, QTS, Vantage, STACK, CloudHQ, Iron Mountain and others) were not yet reviewed directly; those campuses remain dataset leads only.
- Meta's Henrico County campus could not be confirmed from operator material.
Selected records
- Boydton datacenter fact sheet · Microsoft
- Virginia, USA — Google Data Center Location · Google
- Meta data center locations index · Meta
- open datasets directories — Checked
- Roughly 80 building-level Northern Virginia records (Digital Realty, CyrusOne, NTT, QTS, Iron Mountain, Vantage, Equinix halls) were deliberately not turned into research leads, so the current research coverage under-represents operating capacity.
- No other directory (Data Center Map, Baxtel, datacenters.com, Cloudscene, PeeringDB) was consulted.
Selected records
- Compute Atlas Virginia extract (143 records) · Compute Atlas
- historical closures withdrawals names — Checked
- A Data Center Dynamics headline indicates the Pittsylvania plan was 'withdrawn again' after the April 2025 denial; that later filing could not be verified (unavailable during review).
- No county record was retrieved for the Chesapeake, Fredericksburg, Dulles South, Franklin or LS Power decisions.
- Renames and acquisitions were captured only where a retrieved source stated them (Solis Arx/Fluidstack, the Compass/H&H Digital Gateway rezoning).
Selected records
- Board of County Supervisors of Prince William County v. Oak Valley Homeowners Association, Inc. — published opinion · Court of Appeals of Virginia
- news and other discovery — Checked
- FauquierNow, Virginia Mercury and Data Center Dynamics could not be retrieved during review and Cardinal News was unavailable during review, so the Warrenton litigation status and the later Pittsylvania filing rest on search-result headlines only.
- the current review did not include a broad discovery sweep partway through, so Stafford, Louisa, Caroline, Henrico/Meta, Mecklenburg, Botetourt and Fauquier follow-up searches were never run.
Selected records
- Judge rules in favor of developer, Prince William County in Devlin data center legal challenge · InsideNoVa
- Amazon taking fight with King George supervisors to court · Fredericksburg Free Press
- Data center cancellations 2025 · Heatmap News