The reviewed utility order establishes Google Fort Wayne's cooling design and water use.

What the evidence supports

The order establishes that the site was energized in November 2024 and that Google had begun operation, but it does not establish cooling architecture or a water metric.

Still unknown

Cooling architecture, source water, and permitted or measured withdrawal, consumption, and discharge.

Confidence: low — utility commission final order · 1 sources

Open full claim → History (1) →

Evidence details

  1. Indiana IURC order 46276 → Gov. record

    Exact location https://www.in.gov/iurc/files/ord_46276_042926.pdf

    What it supports November 2024 energization and begun-operation status; no cooling or water metric.

    Retrieved 16 September 2026 · published 2026-04-29

Counterevidence

None recorded.

Next check

A water permit, utility disclosure, or site-specific cooling statement

History

Correction · 16 September 2026 · Editorial classification update

google-fort-wayneCooling + water

Field Cooling + water

From Google Fort Wayne: Not verifiable

To The reviewed utility order establishes Google Fort Wayne's cooling design and water use.

Why A source re-read converted a generated status label into the exact inference being tested and restored a concise unit boundary.

Evidence No additional evidence link; see the linked record or claim.

Data + actions

This claim as JSON →

Suggest a correction → Claim ID claim:google-fort-wayne:cooling-water and the page are prefilled. Accepted material corrections appear publicly on Changes.