Licensed lead · not independently verified · dcd-dir-000191

Bitdeer Shalersville Data Center Campus

source-reported proposed

Bitdeer

Shalersville Township · Portage County · Ohio

Planned 750 MWSource updated 24 July 2026approximate location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Bitdeer Shalersville Data Center Campus.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Facility snapshot

Operator as published
Bitdeer
Address and locality
Shalersville Township · Portage County · Ohio
Source-reported status
proposed
Facility type
data center
Reported capacity
Planned: 750 MW (source-reported; boundary not independently verified)
Source freshness
24 July 2026
Location precision
approximate
Source confidence
reported
Stable directory ID
dcd-dir-000191

What the source record says

Turnpike Commerce Center, Shalersville Township, Portage County. Not yet approved — blocked by the township's active data-center moratorium (see community field). Distinct from Bitdeer's other tracked Ohio sites (Clarington, Whitetail Creek/Niles, and Massillon). Tax revenue projections ($2.17M annual increase at phase-1 completion) are Bitdeer's own company projections, not independently confirmed. Coordinates are an approximate geocode of Shalersville Township, not a confirmed parcel pin — no source gave exact site coordinates. Development partner: Geis Development.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025 · source-reported proposed

    Bitdeer, via local developer Geis Development, proposes a ~257-acre, up-to-750MW campus (150MW phase 1, 15 buildings total) at Turnpike Commerce Center.

    Open cited source →

  2. 2026-04 · source-reported proposed

    Shalersville Township trustees sign a 6-month extension of the township's data-center moratorium (in effect since October 2024), blocking any project approval through early November 2026.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID bitdeer-shalersville-portage-county-oh. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →