Licensed discovery layer · Compute Atlas 1.33.0

Tennessee data center directory

Browse 39 licensed source rows in Tennessee. These discovery leads are not independently verified and are not a statewide census.

39 licensed rows31 eligible organization labels15 city/state labelsSource data updated through 14 September 2026

Tennessee map

Reported locations in Tennessee

39 licensed rows · 15 source localities · 4 map targets

Open interactive map
Source-reported points; some are approximate. Not parcel boundaries. Exact Approximate or representative Bounded nearby group3 symbols are offset slightly for readability; thin connectors retain their projected anchors. Open the interactive map for source coordinates.
Browse 4 mapped areas as links
Map sources and method

The state outline is adapted from the U.S. Census Bureau 2025 cartographic boundary file. Facility coordinates are adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Outline and markers use one geographic projection before any explicitly disclosed readability offset. Exact singleton source anchors are never moved. A one-kilometre boundary tolerance prevents the simplified 1:20,000,000 outline from hiding legitimate border-area source points; farther conflicts are disclosed, not clamped. DataCenterData groups source-reported city coordinates only within a bounded map radius; the outline does not validate a facility record.

Two layers, two jobs. These licensed rows have not been independently verified by DataCenterData and are not a census. Reviewed evidence remains separate.

Browse by city

15 reported localities

City labels are reproduced as published. They are not inferred metro areas.

Showing 1–39 of 39 Tennessee licensed source rows.

  1. source-reported under constructionPlanned 15 MWSource updated 14 September 2026approximate location
    View facility →dcd-dir-000015
  2. source-reported under constructionPlanned 86 MWSource updated 9 September 2026approximate location
    View facility →dcd-dir-000190
  3. source-reported operationalCapacity not statedSource updated 14 September 2026approximate location
    View facility →dcd-dir-000204
  4. source-reported operationalPlanned 100 MWSource updated 15 August 2026exact location
    View facility →dcd-dir-000221
  5. source-reported proposedPlanned 350 MWSource updated 26 July 2026exact location
    View facility →dcd-dir-000236
  6. source-reported operationalCapacity not statedSource updated 9 September 2026approximate location
    View facility →dcd-dir-000076
  7. source-reported operationalPlanned 1,200 MWOperational 150 MWSource updated 10 September 2026exact location
    View facility →dcd-dir-001585
  8. source-reported operationalCapacity not statedSource updated 9 September 2026approximate location
    View facility →dcd-dir-001584
  9. source-reported operationalOperational 2 MWSource updated 13 September 2026exact location
    View facility →dcd-dir-000393
  10. DataBank MEM1 (Memphis)

    DataBank

    7620 Appling Center Drive · Memphis · Shelby County · Tennessee · 38133

    source-reported operationalOperational 0.45 MWSource updated 9 September 2026exact location
    View facility →dcd-dir-000409
  11. source-reported operationalPlanned 1 MWSource updated 14 September 2026approximate location
    View facility →dcd-dir-000437
  12. source-reported proposedPlanned 50 MWSource updated 9 September 2026approximate location
    View facility →dcd-dir-000438
  13. source-reported operationalCapacity not statedSource updated 14 September 2026approximate location
    View facility →dcd-dir-000535
  14. EdgeConneX NAS01 Nashville

    EdgeConneX

    1841 Air Lane Drive, Building 3 · Nashville · Davidson County · Tennessee · 37210

    source-reported operationalCapacity not statedSource updated 14 September 2026approximate location
    View facility →dcd-dir-000538
  15. source-reported operationalOperational 1.5 MWSource updated 14 September 2026approximate location
    View facility →dcd-dir-000613
  16. source-reported proposedPlanned 30 MWSource updated 9 September 2026approximate location
    View facility →dcd-dir-000628
  17. source-reported permittedCapacity not statedSource updated 14 September 2026approximate location
    View facility →dcd-dir-000858
  18. source-reported operationalCapacity not statedSource updated 23 July 2026approximate location
    View facility →dcd-dir-000655
  19. source-reported operationalOperational 3.15 MWSource updated 23 July 2026exact location
    View facility →dcd-dir-000656
  20. source-reported operationalOperational 6 MWSource updated 23 July 2026exact location
    View facility →dcd-dir-000657
  21. source-reported operationalCapacity not statedSource updated 14 September 2026exact location
    View facility →dcd-dir-000726
  22. source-reported operationalCapacity not statedSource updated 14 September 2026approximate location
    View facility →dcd-dir-000776
  23. source-reported operationalCapacity not statedSource updated 14 September 2026approximate location
    View facility →dcd-dir-000782
  24. source-reported proposedPlanned 25 MWSource updated 9 September 2026approximate location
    View facility →dcd-dir-000791
  25. source-reported proposedCapacity not statedSource updated 9 September 2026approximate location
    View facility →dcd-dir-000837
  26. source-reported operationalCapacity not statedSource updated 9 September 2026exact location
    View facility →dcd-dir-000870
  27. source-reported operationalCapacity not statedSource updated 14 September 2026approximate location
    View facility →dcd-dir-000890
  28. source-reported operationalPlanned 300 MWOperational 300 MWSource updated 9 September 2026exact location
    View facility →dcd-dir-000935
  29. Minihard

    xAI

    5414 Tulane Road · Memphis · Shelby County · Tennessee

    source-reported under constructionCapacity not statedSource updated 13 September 2026approximate location
    View facility →dcd-dir-001587
  30. source-reported proposedCapacity not statedSource updated 13 September 2026approximate location
    View facility →dcd-dir-001041
  31. source-reported proposedCapacity not statedSource updated 9 September 2026representative multi site location
    View facility →dcd-dir-000510
  32. source-reported operationalCapacity not statedSource updated 14 September 2026approximate location
    View facility →dcd-dir-001111
  33. source-reported operationalCapacity not statedSource updated 14 September 2026approximate location
    View facility →dcd-dir-001112
  34. source-reported proposedCapacity not statedSource updated 9 September 2026approximate location
    View facility →dcd-dir-001163
  35. source-reported under constructionPlanned 12 MWSource updated 14 September 2026approximate location
    View facility →dcd-dir-001239
  36. source-reported operationalCapacity not statedSource updated 14 September 2026approximate location
    View facility →dcd-dir-001438
  37. source-reported operationalCapacity not statedSource updated 13 September 2026approximate location
    View facility →dcd-dir-001436
  38. source-reported under constructionCapacity not statedSource updated 13 September 2026exact location
    View facility →dcd-dir-001371
  39. source-reported operationalCapacity not statedSource updated 14 September 2026exact location
    View facility →dcd-dir-001466
Source and reuse

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. DataCenterData normalized selected fields and added stable IDs. Download the attributed JSON →