This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for Cerebras Oklahoma City Data Center.
Exact source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Facility snapshot
- Operator as published
- Cerebras Systems
- Address and locality
- Oklahoma City · Oklahoma County · Oklahoma
- Source-reported status
- operational
- Facility type
- data center
- Reported capacity
- Operational: 10 MW (source-reported; boundary not independently verified)
- Source freshness
- 7 July 2026
- Location precision
- exact
- Source confidence
- confirmed
- Stable directory ID
dcd-dir-000233
What the source record says
Colocation tenancy: Cerebras Systems is the AI infrastructure operator; Scale Datacenters is the facility host/colo provider (acquired the 82,000 sq ft building from Expand Energy, formerly Chesapeake Energy, originally built ~2013). Facility address: 512 NW 62nd St (corner of NW 61st/62nd St and N Lee Ave), Oklahoma City. Ribbon cutting September 22, 2025. Houses 300+ CS-3 Wafer Scale Engine systems delivering 44+ exaflops of AI compute. Facility features Tier III-quality infrastructure, tornado and seismic shielding, triple-redundant power stations. Cerebras matches all kWh consumption with renewable energy (REC-based, not on-site generation). OG&E reported as grid utility — consistent with OKC service territory but not explicitly named in Cerebras primary sources. Investment amount not disclosed. Jobs: Cerebras blog references 'hundreds of good-paying jobs' in engineering, IT, and operations plus local college workforce partnerships — no firm headcount confirmed. Coordinates are approximate (dispatch seed); actual facility is at 512 NW 62nd St.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2025 · source-reported proposed
Cerebras announced six new AI datacenters including OKC; Scale Datacenters selected as host colo; 300+ CS-3 systems expected online by June 2025
- 2025-09 · source-reported operational
Ribbon cutting September 22, 2025; 10 MW facility with 300+ CS-3 wafer-scale systems confirmed online
Sources and attribution
- Cerebras Unveils Six Data Centers to Meet Accelerating Demand for AI Inference at Scale · Data Center Frontier
- Cerebras Announces Six New AI Datacenters Across North America and Europe · Cerebras Systems
- Cerebras OKC Data Center — Official Blog · Cerebras Systems
- Cerebras Opens 10MW Data Center in Oklahoma City · Data Center Dynamics
- Cerebras: Oklahoma City Data Center — Baxtel Profile · Baxtel
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID cerebras-oklahoma-city-ok. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.