CloudBurst Oklahoma City Campus

source-reported under construction

CloudBurst Data Centers

Oklahoma City · Oklahoma County · Oklahoma

Planned 200 MWSource updated 14 September 2026approximate location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for CloudBurst Oklahoma City Campus.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Facility snapshot

Operator as published
CloudBurst Data Centers
Address and locality
Oklahoma City · Oklahoma County · Oklahoma
Source-reported status
under construction
Facility type
data center
Reported capacity
Planned: 200 MW (source-reported; boundary not independently verified)
Source freshness
14 September 2026
Location precision
approximate
Source confidence
reported
Stable directory ID
dcd-dir-000253

What the source record says

200 MW IT load across a planned multi-building campus reported near 2000 S Council Rd. Coordinates are an Oklahoma City centroid approximation. Oklahoma City's 2026 data-center moratorium is reported to have affected the timeline.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-08 · source-reported proposed

    Developer's site shows a Q4 2025 groundbreaking target with 30 MW revenue-generating service in Q4 2026; still pre-construction as of retrieval.

    Open cited source →

  2. 2026-09-14 · source-reported under construction

    News 9 reports the campus "broke ground at the end of 2025" and is under development on a three-phase schedule: Phase 1 delivering 30 MW at the end of 2026, Phase 2 delivering 50 MW around mid-2027, and Phase 3 completing at the end of 2028 for the full 200 MW across three data centers. This moves the record past 'proposed'.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID cloudburst-oklahoma-city-campus-ok. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.