Facts at a glance
- Record ID
hostdime-eatonville-fl- Record type
- building
- Developer
- Not named in the cited records
- Operator
- HostDime
- Owner
- Owner of record not established
- Tenant
- Not named in the cited records
- Capacity
- Unknown No independently supported figure
No primary-source critical IT capacity, utility-service capacity, generation or measured-load figure was established. - Location
- Eatonville, FL
County: Orange County
approximate — The council packet places the facility in Eatonville along the I-4 corridor. No street address, parcel or exact coordinates are published here. - Physical scale
- Physical scale: No independently supported square footage or building subdivision is published here.
What the sources support
A July 7, 2026 Town of Eatonville council packet scheduled HostDime to provide updates on construction and opening. An August 18, 2026 municipal meeting page again listed a HostDime construction update. These records support construction, not completion or operation.
Definitions: record units · roles · capacity boundaries · lifecycle stages.
What remains unknown
- street address
- parcel identifiers
- exact coordinates
- land owner
- developer
- critical IT capacity
- utility service capacity
- building square footage
- opening or completion date
- operating evidence
Sources
-
Town of Eatonville regular council meeting packet — July 7, 2026 →Gov. record
Exact location PDF pp. 1, 5 and 21; agenda items IV.C and VIII.2
What it supports HostDime AI/Data Center name, Eatonville/Orange County location and a construction-and-opening status update. The HostDime item cover sheet's isolated 2025 date is treated as a template typo because the meeting-level record says 2026.
-
Town of Eatonville regular council meeting — August 18, 2026 →Gov. record
Exact location Presentations and Recognition, item C
What it supports Later municipal listing for a HostDime construction update. It does not establish a meeting outcome, completion or operation.
Record history
Record history · 7 July 2026 · DataCenterData review
hostdime-eatonville-fl → Record
Why Town council packet scheduled a HostDime update on construction and opening.
Evidence No additional evidence link; see the linked record or claim.
Record history · 18 August 2026 · DataCenterData review
hostdime-eatonville-fl → Record
Why Town meeting page again listed a HostDime construction update.
Evidence No additional evidence link; see the linked record or claim.
DataCenterData record added · 13 September 2026 · DataCenterData review
hostdime-eatonville-fl → Publication
Why Added as one construction-stage building after fresh review of the municipal packet and meeting page; directory naming, capacity and opening claims were excluded.
Evidence No additional evidence link; see the linked record or claim.
Data + actions
Permanent link for citing this record →
Also listed as dcd-dir-000796 in the licensed third-party directory; that directory row is not independently verified.
Suggest a correction → Record ID hostdime-eatonville-fl and the page are prefilled. Accepted material corrections appear on Changes.