Facility or project event · Power plant exemption granted · Official record

Power plant exemption granted on 9 May 2025: STACK SVY03A Data Center Campus (Hayward, CA) — state energy commission order dated 9 May 2025

The California Energy Commission voted 5-0 at its May 8, 2025 business meeting to adopt the Mitigated Negative Declaration and grant a Small Power Plant Exemption for the STACK SVY03A Data Center Campus at 26062 Eden Landing Road, Hayward (docket 23-SPPE-01).

What this is. The source (state energy commission order, dated 9 May 2025) dates this power plant exemption to 9 May 2025. This event does not establish any later stage.
Event date
The order states it is 'adopted, issued, effective, and final on May 9, 2025'; the Commission's 5-0 vote was taken at its May 8, 2025 business meeting.
Source dated
Order signature block 'Dated: May 9, 2025' and 'This Order is adopted, issued, effective, and final on May 9, 2025'; docketed 5/13/2025.
Source accessed
Retrieved by DataCenterData; not an event date.
Added to Latest updates
When this entry entered the updates log; not an event date.
Event type
Power plant exemption granted · Approvals
Evidence basis
Official record · California Energy Commission
Confidence
HighCommission order with vote and date; exact entity match.
State
California
Linked records
STACK SVY03A Data Center Campus stack-svy03a-hayward
Linked claims
None linked

What the source says

The SPPE application is GRANTED exempting the STACK SVY03A Data Center Campus from the Application for Certification provisions of the CEC's power plant licensing process.

Where: Section IV 'Conclusion and Order', item 3; Certification block (May 8, 2025 meeting, AYE list)

Internet Archive copy (captured 19 July 2025)

What this does not establish

  • City of Hayward entitlement (separate Planning Commission action)
  • Construction start
  • Completion, energization or operation

Still unknown

  • Whether the NOD was challenged
  • Construction start date and current progress
  • Operator/tenant and IT capacity
  • Relationship between the order's 67.2 MW and the 76.6 MW now on CEC/city pages

Identifiers

Event ID ff5db5866c22f90c0786b77dc5d9a38071701a8231b623a7c11a7018aab8f3ba. The ID is derived from the event itself and never changes. A later correction would be published as a separate, linked entry.

Report a problem with this entry →

All latest updates →