project · PA · last checked 13 September 2026

Amazon Falls Township Data Center Project

Lifecycle label: approved; effective date not established Status evidence: land-development approval only Evidence: Independently source-linked Reuse: Reference only

Facts at a glance

Record ID
amazon-falls-township-data-center
Record type
project
Developer
Not named in the cited records
Operator
Not named in the cited records
Owner
Owner of record not established
Tenant
Not named in the cited records
Capacity
Unknown No independently supported figure
The opened Township record publishes no critical-IT, facility-load, utility-service, utility-request, generation or measured-load MW.
Location
Falls Township, PA
County: Bucks County
approximate — The official page names approved-plan components at 1 Ben Fairless Drive and 700 S. Port Road. Because it joins two revisions into the local project account, no single street address, parcel or coordinate is asserted for this project unit.
Physical scale
Physical scale: The Township says one plan changes Building 6 at 1 Ben Fairless Drive to a data center. Separately, the 700 S. Port Road Phase 2 revision changes a 247-acre parcel from four distribution centers to 10 planned one- or two-story structures of 112,000–217,000 square feet each and more than 2 million square feet total, described as a digital-infrastructure campus. These are planned/approved figures, not built or operating inventory. The 1,800-acre Keystone Trade Center is broader than this project.

What the sources support

Falls Township says Amazon announced its intent to construct a data center and plans an innovation campus on part of Keystone Trade Center. It also says the Falls Supervisors approved two preliminary and final land-development plans in March 2025, including conversion of Building 6 to a data center and a Phase 2 digital-infrastructure campus. This establishes local land-development approval, not construction, completion, energization or operation.

Definitions: record units · roles · capacity boundaries · lifecycle stages.

What remains unknown

Sources

Record history

Record history · 2025-03 · DataCenterData review

amazon-falls-township-data-center → Record

Why Falls Supervisors approved two preliminary and final land-development plan revisions.

Evidence No additional evidence link; see the linked record or claim.

Record history · 9 June 2025 · DataCenterData review

amazon-falls-township-data-center → Record

Why Falls Township published Amazon's local data-center/innovation-campus announcement.

Evidence No additional evidence link; see the linked record or claim.

DataCenterData record added · 13 September 2026 · DataCenterData review

amazon-falls-township-data-center → Publication

Why Added as one land-development-approved project; construction, operating roles and capacity remain unproven.

Evidence No additional evidence link; see the linked record or claim.