Facts at a glance
- Record ID
applied-digital-polaris-forge-2-harwood-nd- Record type
- campus
- Developer
- Not named in the cited records
- Operator
- Not named in the cited records
- Owner
- Owner of record not established
- Tenant
- Not named in the cited records
- Capacity
- 200 MW critical it · phase scope
The filing describes a data-center lease to deliver 200 MW of critical IT load to an unnamed hyperscaler, phased across the initial two buildings. This is contracted future critical IT load, not current or measured load, utility-service capacity or an entire future-campus total. - Location
- ND
approximate — The SEC filing says near Harwood, North Dakota and elsewhere calls it the company's campus in Harwood. It gives no street address, parcel, county or coordinates; Harwood is retained only in the stable ID as the source's place label. - Physical scale
- Physical scale: The leased initial 200 MW is phased across two buildings expected to come online in 2026. These are planned construction-phase buildings, not two operating facilities and not a complete campus building count.
What the sources support
Applied Digital's Form 10-Q filed April 8, 2026 says the Polaris Forge 2 project near Harwood had begun; Note 14 says the campus was currently under construction. Expected future online dates are forecasts and do not establish operation.
Definitions: record units · roles · capacity boundaries · lifecycle stages.
What remains unknown
- street address
- parcel identifier
- county and municipal situs
- exact coordinates
- ultimate land or campus owner
- developer role
- operator role
- hyperscaler tenant identity
- utility request or approved service capacity
- measured load
- construction permit or inspection
- current completion or operating evidence
- full-campus design capacity beyond the initial phase
Sources
-
Applied Digital Form 10-Q for the quarter ended February 28, 2026 →Gov. record
Exact location Part I, Item 2, HPC Data Center Hosting Business, paragraph beginning 'On August 18, 2025'; Note 14, Leases — Lessor Accounting, paragraph beginning 'On October 20, 2025'
What it supports Polaris Forge 2 name and near-Harwood location, project-begun/currently-under-construction statements, APLD FAR-01 LLC and APLD FAR-02 LLC as lessor subsidiaries, unnamed hyperscaler tenant boundary, two-building phase and leased 200 MW critical IT-load scope.
Record history
Record history · 20 October 2025 · DataCenterData review
applied-digital-polaris-forge-2-harwood-nd → Record
Why Applied Digital subsidiaries entered the filed lease for 200 MW of critical IT load at Polaris Forge 2.
Evidence No additional evidence link; see the linked record or claim.
Record history · 8 April 2026 · DataCenterData review
applied-digital-polaris-forge-2-harwood-nd → Record
Why Applied Digital filed the Form 10-Q describing Polaris Forge 2 as under construction.
Evidence No additional evidence link; see the linked record or claim.
DataCenterData record added · 13 September 2026 · DataCenterData review
applied-digital-polaris-forge-2-harwood-nd → Publication
Why Added as one construction-stage campus; the lease-backed 200 MW was scoped to the initial two-building phase and developer, operator, owner and tenant identities remain unresolved.
Evidence No additional evidence link; see the linked record or claim.
Data + actions
Permanent link for citing this record →
Also listed as dcd-dir-000086 in the licensed third-party directory; that directory row is not independently verified.
Suggest a correction → Record ID applied-digital-polaris-forge-2-harwood-nd and the page are prefilled. Accepted material corrections appear on Changes.