campus · NE · last checked 14 September 2026

Google Papillion Data Center

Lifecycle label: operating; effective date not established Status evidence: Sarpy County operating statement dated 2021-12-20, corroborated by the City of Papillion permit-report snapshot dated 2026-04-21 Evidence: Independently source-linked Reuse: Reference only

Facts at a glance

Record ID
google-papillion-data-center-ne
Record type
campus
Developer
Not named in the cited records
Operator
Not named in the cited records
Owner
Owner of record not established
Tenant
Not named in the cited records
Capacity
Unknown No independently supported figure
No selected record states critical-IT, gross-facility, utility-request, utility-service, generation, or measured-load MW. Permit voltage/equipment descriptions and utility system planning are not campus capacity.
Location
14865 Gold Coast Rd, Papillion, NE
County: Sarpy County
exact — Exact municipal permit address, cross-checked to the county's Papillion data-center identity. No coordinate or assessor parcel is asserted.
Physical scale
Physical scale: The April 2026 permit report references SRP2A, SRP3A, and SRP4A at the selected address and separately prints a 'PT Lot 1 Schram & Hwy 50 (260.98AC)' descriptor. These are source labels/site context only; they do not establish a complete building count, net campus acreage, floor area, commissioned IT area, or capacity.

What the sources support

Sarpy County's 2021 annual report says Google's first data center in Papillion was already operational. The City of Papillion's April 21, 2026 building-permit report describes work inside Google's existing data centers at 14865 Gold Coast Road. Four cited rows have status Finaled and an Issued Date of April 6, 2026; that date is not a finaling date. A fifth row has status Issued and an Issued Date of April 1, 2026. This supports a campus with at least one operating data-center building on the dated records; it does not establish a finaling date, that every building or phase is complete or operating, real-time uptime, occupancy, or current IT load.

Definitions: record units · roles · capacity boundaries · lifecycle stages.

What remains unknown

Sources

Record history

Record history · 20 December 2021 · DataCenterData review

google-papillion-data-center-ne → Record

Why Sarpy County reported Google's first Papillion data center already operational.

Evidence No additional evidence link; see the linked record or claim.

Record history · 21 April 2026 · DataCenterData review

google-papillion-data-center-ne → Record

Why Papillion's report snapshot marked four cited permit rows Finaled and one Issued; April 6 is the four Finaled permits' issued date, not their finaling date.

Evidence No additional evidence link; see the linked record or claim.

DataCenterData record added · 14 September 2026 · DataCenterData review

google-papillion-data-center-ne → Publication

Why Qualified as one operating campus with at least one operating data-center building; complete campus scale, roles, and capacity remain unknown.

Evidence No additional evidence link; see the linked record or claim.

Data + actions

Permanent link for citing this record →

Suggest a correction → Record ID google-papillion-data-center-ne and the page are prefilled. Accepted material corrections appear on Changes.