Facts at a glance
- Record ID
meta-rosemount-data-center-mn- Record type
- campus
- Developer
- Not named in the cited records
- Operator
- Not named in the cited records
- Owner
- Owner of record not established
- Tenant
- Not named in the cited records
- Capacity
- Unknown No independently supported figure
No selected publication source states critical-IT, gross-facility, utility-request, utility-service, generation, or measured-load MW. - Location
- Rosemount, MN
County: Dakota County
approximate — The city places the 280-acre project in UMore Park directly east of Dakota County Technical College. No street address, parcel identifier, or coordinate is asserted. - Physical scale
- Physical scale: The City of Rosemount's 2024 Annual Comprehensive Financial Report describes a 280-acre project and a 715,000-square-foot data center under construction. These are source-reported project figures, not surveyed current built area, commissioned IT space, a building count, or capacity.
What the sources support
The City of Rosemount's current water-supply FAQ says the data center in Rosemount is under construction, and the city's development page crosswalks Bigfoot/Jimnist to Meta. The city's 2024 Annual Comprehensive Financial Report describes the 280-acre Meta/Jimnist project as under construction. The University of Minnesota Office of General Counsel says the 280-acre sale to Jimnist closed December 29, 2023, identifies Meta Platforms, Inc. as Jimnist's parent, and says a data center was being constructed on the property. This supports construction on the current municipal statement; it does not establish completion, energization, operation, tenant use, or continuous progress.
Definitions: record units · roles · capacity boundaries · lifecycle stages.
What remains unknown
- street address, parcel crosswalk, and coordinates
- current property title after the December 2023 sale
- separate developer, owner, operator, and tenant assignments
- critical-IT, gross-facility, utility-service, utility-request, generation, and measured-load capacity
- commissioning, energization, completion, and operating evidence
Sources
-
City of Rosemount FAQ — Public Works / Water Quality →Gov. record
Exact location Question 'How will data centers and new industrial business affect Rosemount’s water supply?', first sentence
What it supports Current municipal construction statement only.
-
City of Rosemount — Development in Rosemount →Gov. record
Exact location Welcome, Meta! opening paragraph
What it supports Bigfoot/Jimnist/Meta name crosswalk, Rosemount, and data-center purpose.
-
City of Rosemount — Annual Comprehensive Financial Report for year ended December 31, 2024 →Gov. record
Exact location PDF p. 12 / printed p. iii, Factors Affecting Financial Condition — Local Economy
What it supports Meta/Jimnist identity, 280-acre project figure, 715,000-square-foot project figure and dated construction description.
-
University of Minnesota Office of General Counsel Annual Report 2024 →Gov. record
Exact location p. 6, Sale of 280 Acres of University’s UMore Park Land
What it supports Sale closing, Jimnist purchaser, Meta parent relationship, and dated construction statement.
Record history
Record history · 29 December 2023 · DataCenterData review
meta-rosemount-data-center-mn → Record
Why The University says its 280-acre sale to Jimnist LLC closed.
Evidence No additional evidence link; see the linked record or claim.
DataCenterData record added · 14 September 2026 · DataCenterData review
meta-rosemount-data-center-mn → Publication
Why Qualified as one construction-stage campus; roles, capacity, exact parcel, completion, and operation remain unknown.
Evidence No additional evidence link; see the linked record or claim.
Data + actions
Permanent link for citing this record →
Suggest a correction → Record ID meta-rosemount-data-center-mn and the page are prefilled. Accepted material corrections appear on Changes.