Facts at a glance
- Record ID
microsoft-corporation-sat-89-90-tx- Record type
- project
- Developer
- Not named in the cited records
- Operator
- Microsoft Corporation
- Owner
- Microsoft Corporation
- Tenant
- Not named in the cited records
- Capacity
- Unknown No independently supported figure
No selected Comptroller or TDLR record states critical-IT or other MW. TDLR estimated cost and 489,400 square feet gross building area are not IT load and are not published as capacity. - Location
- 2995 US HWY 90 W, Castroville, TX
County: Medina County
exact — TDLR TABS location. The Comptroller list row does not publish an address. - Physical scale
- Physical scale: TDLR TABS scope describes construction of two single-story data-center buildings, each containing five colos, plus associated campus site construction, and approximately 489,400 square feet gross building area. That is registered design scope, not occupied white space, a counted campus identity, or IT load.
What the sources support
The Texas Comptroller's registered qualifying large data-center projects list includes Microsoft Corporation (SAT 89-90) with effective date 04/04/2024 and names Microsoft Corporation as owner, occupant and operator under registration LD772702. TDLR TABS project TABS2025012765 registers SAT89/90 Data Center at 2995 US HWY 90 W, Castroville, Medina County, as new construction of two single-story data-center buildings plus associated campus site construction. TABS Current Status is Review Complete, which is accessibility plan review, not a finding that construction has started or finished. These records support a named project identity, address and tax-program owner/operator labels. They do not establish a current lifecycle stage, a campus as a separate counted unit, or any IT-load figure.
Definitions: record units · roles · capacity boundaries · lifecycle stages.
What remains unknown
- construction or operating evidence independent of TABS plan-review status
- developer if distinct from Microsoft
- tenant
- parcel identifiers
- site acres
- critical-IT and other MW capacity
Sources
-
Registered Qualifying Large Data Center Projects — Microsoft Corporation (SAT 89-90) →Gov. record
Exact location Registered Qualifying Large Data Center Projects table, Microsoft Corporation (SAT 89-90) row: effective date 04/04/2024; owner LD772702-OW1; occupant LD772702-OC1; operator LD772702-OP1
What it supports Project name, tax-program owner and operator labels; not address, construction status or IT load.
-
TDLR TABS Project TABS2025012765 — SAT89/90 Data Center →Gov. record
Exact location Project Details: location address and county; Type of Work New Construction; Scope of Work two buildings plus associated campus site construction; Current Status Review Complete; Owner Name Microsoft Corporation
What it supports Street address, city, county, two-building physical scope, owner name on the accessibility registration; not construction progress or IT load.
Record history
Record history · 4 April 2024 · DataCenterData review
microsoft-corporation-sat-89-90-tx → Record
Why Comptroller list effective date for Microsoft Corporation (SAT 89-90) as a qualifying large data-center project.
Evidence No additional evidence link; see the linked record or claim.
Record history · 25 February 2025 · DataCenterData review
microsoft-corporation-sat-89-90-tx → Record
Why TDLR TABS registration date for SAT89/90 Data Center.
Evidence No additional evidence link; see the linked record or claim.
Data + actions
Permanent link for citing this record →
Suggest a correction → Record ID microsoft-corporation-sat-89-90-tx and the page are prefilled. Accepted material corrections appear on Changes.