Facts at a glance
- Record ID
vantage-quincy-campus-wa- Record type
- campus
- Developer
- Not named in the cited records
- Operator
- Vantage Data Centers
- Owner
- Owner of record not established
- Tenant
- Not named in the cited records
- Capacity
- 49.5 MW backup generation permitted · campus scope
Ecology states a 49.5 MW facility total for installed emergency generators in Phases One and Two. The component figures printed in the order do not sum to that total. This is permitted backup generation, not critical IT capacity, utility service or measured load. Phase Three equipment is outside the stated total. - Location
- 2101 M Street NE, Quincy, WA
County: Grant County
exact — The exact street address, city and county are stated in Ecology Approval Order 23AQ-E056; exact does not mean a surveyed parcel or building footprint. - Physical scale
- Physical scale: The order describes a three-phase campus: Buildings One and Two were in place and Building Three was planned. This is not a finding that three buildings were operating on the review date.
What the sources support
Ecology's order calls this an existing data center at 2101 M Street NE. It says Buildings One and Two were in place while Building Three remained a future phase. Operating therefore describes the campus, not every planned building.
Definitions: record units · roles · capacity boundaries · lifecycle stages.
What remains unknown
- critical IT capacity
- utility service and measured load
- current completion or operating status of Building Three
- tenant identities
- surveyed parcel and building footprints
Sources
-
Washington State Department of Ecology — data centers regulated or reviewed by Ecology →Gov. record
Exact location Quincy — Vantage entry and linked approval order
What it supports State regulator's project index and link to the site-specific order; the index explicitly says it is not a complete list of every Washington data center.
-
Ecology Approval Order 23AQ-E056 — Vantage Quincy →Gov. record
Exact location Project Summary and Equipment sections
What it supports Existing-campus identity, Vantage role, exact address, phased-building boundary and the separately typed emergency-generator figure.
Record history
Record history · 29 August 2023 · DataCenterData review
vantage-quincy-campus-wa → Record
Why Ecology documented an existing two-phase campus and approved equipment for a third phase; the order is not evidence that the third building was complete or operating.
Evidence No additional evidence link; see the linked record or claim.
DataCenterData record added · 18 September 2026 · DataCenterData review
vantage-quincy-campus-wa → Publication
Why Added after independent re-reading of the state index and site-specific order, with backup generation kept separate from IT capacity.
Evidence No additional evidence link; see the linked record or claim.
Data + actions
Permanent link for citing this record →
Suggest a correction → Record ID vantage-quincy-campus-wa and the page are prefilled. Accepted material corrections appear on Changes.