State and local policy
Grid-interconnection pause
Recorded actions of type Grid-interconnection pause. An empty result is not a national finding.
Action type is the legal character of the instrument. It is not a score.
| State | Locality | Jurisdiction | Action | Status | Stage | Effective | Expiration | Record |
|---|---|---|---|---|---|---|---|---|
| Texas | Statewide or grid-wide | Regional grid | Grid-interconnection pause | In effect | Interconnection | 3 August 2026 | None scheduled | ERCOT large-load interconnection pause Primary source |
Download the policy dataset (JSON). Policy actions are not facility, project, claim, update, or directory counts.