State and local policy

Grid-interconnection pause

Recorded actions of type Grid-interconnection pause. An empty result is not a national finding.

Action type is the legal character of the instrument. It is not a score.

Grid-interconnection pause
StateLocalityJurisdictionActionStatusStageEffectiveExpirationRecord
TexasStatewide or grid-wideRegional gridGrid-interconnection pauseIn effectInterconnection3 August 2026None scheduledERCOT large-load interconnection pause
Primary source

Download the policy dataset (JSON). Policy actions are not facility, project, claim, update, or directory counts.